Project Templete
Project Templete
Cover Page
1.1.Name and logo of Ministry of Education
1.2.Name and logo of the University
1.3.Faculty
1.4.Department
1.5.Title
1.6.Students' names
1.7.Supervisor
1.8.Date
2. Abstract
Abstract: (150 – 200 words): - الملخص
Summarizes the proposed research through the problem and the motivation
description, and the expected contributions. It includes:
2.1.Project Problem: - مشكلة البحث
2.2.Project Objectives: - أهداف البحث
2.3.Project Significance: - أهمية البحث
2.4.Project Methodology: - منهجية البحث
2.5.Results: - النتائج
2.6.Conclusion and Future Work: - الخالصة أو االستنتاج والعمل المستقبلي
3. Table of Contents
This table can be generated through the text editor.
TABLE OF CONTENTS
PAGE TITLE CHAPTER
4. List of Tables
LIST OF TABLES
PAGE TITLE TABLE NO.
5. List of Figures
LIST OF FIGURES
PAGE TITLE FIGURE NO.
6. List of Appendices
LIST OF APPENDICES
PAGE TITLE APPENDIX
7. LIST OF ABBREVIATIONS
LIST OF ABBREVIATIONS
PAGE Meaning ABBREVIATIONS
8. Chapter 1 Introduction
8.1.Setting objectives
8.2.Objectives should be SMART.
o Specific –
o M–
o A–
o R–
o T–
8.3.Goals/sub-objectives
o Objective – user satisfaction with software product
o Analyst goal – accurate requirements
o Developer goal – software that is reliable.
8.4.Project Stakeholders
o The project sponsor and project team
o Customers
o Users
o Suppliers
o Opponents to the project
9. Chapter 2 Software Project Management
9.1.The People: The Software Team
Seven project factors to consider when structuring a software development team.
9.2.The Product
o The scope of the software development must be established and bounded.
Context –
Information objectives –
Function and performance –
o Problem decomposition
9.3.The Process
9.4.The Project: The W5HH Principle
10. Chapter 3: Planning and Scheduling and Measuring Software
Project
10.1. A typical project plan consists of:
A statement of work: -
A resource list: -
A work breakdown structure and a set of effort estimates: -
A project schedule: -
o Activity charts: -
o Bar charts show: -
A risk plan: -
Quality plan
Validation plan
Configuration management plan
Maintenance plan
Staff development plan
11. Chapter 4 Risk Management
11.1. Risks and risk types
Risk type Possible risks
Technology
P eople
Organizational
Tools
R equirements
Estimation