Daily Work Report Template

The document is Emily Davis's daily work report. It shows her tasks for the day broken into 1.5 hour time blocks. Her goals for the day were to complete a project report, have a client meeting at 2 PM, and start the next project phase. Additional notes indicate she needs to follow up with client feedback and prepare for her client meeting presentation.

Uploaded by

andini eldananty
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views

Daily Work Report Template

The document is Emily Davis's daily work report. It shows her tasks for the day broken into 1.5 hour time blocks. Her goals for the day were to complete a project report, have a client meeting at 2 PM, and start the next project phase. Additional notes indicate she needs to follow up with client feedback and prepare for her client meeting presentation.

Uploaded by

andini eldananty
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

DAILY WO

Name Emily Davis


Position Project Coordinator

Work Description
Start Time End Time Duration
8:00 AM 9:30 AM 1.50

9:30 AM 11:00 AM 1.50

11:00 AM 12:30 PM 1.50

12:30 PM 1:30 PM 1.00

1:30 PM 3:00 PM 1.50

3:00 PM 4:30 PM 1.50

4:30 PM 5:00 PM 0.50

Goals
- Complete the project report.
- Conduct a client meeting at 2:00 PM.
- Start working on the next project phase.
Additional Notes
- Make sure to follow up with the client regarding their feedback.
- Prepare a presentation for the client meeting.
DAILY WORK REPORT
Emily Davis Date O
Project Coordinator Contact No. (9

Description Duration per Activity


Activity Description
Prepared for tomorrow's tasks
Reviewed project requirements

Conducted a team meeting to discuss progress


Collaborated with team members on a presentation
Analyzed data and prepared a report

Lunch break

Resolved a technical issue in the project Resolved a technical issue in the project

Collaborated with team members on a presentation

Prepared for tomorrow's tasks


Lunch break

Analyzed data and prepared a report

Conducted a team meeting to discuss progress

Goals
Reviewed project requirements

0.00 0.20

October
Sun Mon Tue
tional Notes 24 25 26

back. 01 02 03

08 09 10

15 16 17

22 23 24

29 30 31
Oct 16, 2023
(987) 654-3210

ty

morrow's tasks 0.50

a presentation 1.50

e in the project 1.50

Lunch break 1.00

pared a report 1.50

cuss progress 1.50

t requirements 1.50

0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60

October
Wed Thu Fri Sat
27 28 29 30

04 05 06 07

11 12 13 14

18 19 20 21

25 26 27 28

01 02 03 04
SETUP
Name: Position Email Address
Sarah Johnson Marketing Manager [email protected]

Emily Davis Project Coordinator [email protected]

James Brown Human Resources Director [email protected]

Samantha White IT Support Specialist [email protected]


Contact Number
(555) 123-4567

(987) 654-3210

(777) 888-9999

(111) 222-3333
The following are instructions on how to use the template.

1. Edit or add content like inserting rows and columns to the template.
2. There are no locked-up cells for easier editing of cell names.
3. Feel free to change any formula available.

Should you need assistance, please contact our Customer Support Team using the chat box found on the website.
chat box found on the website.

You might also like