Safety Pre-Construction Meeting GKS .
Safety Pre-Construction Meeting GKS .
HAZRAT SHAHJALAL
INTERNATIONAL AIRPORT
EXPANSION PROJECT
Ⅲ Organogram
progress meeting
➢ Discuss matters to improve by sharing the inspection/monitoring result of before/during /after work.
➢ Check the work plan and safety measure for the next day. Check and adjust the innervation between work types.
➢ Non regular risk assessment PTW work ,Designated hazardous work require review and need approval before start work
Worksite TBM
TBM should be carried out before starting afternoon work
Inspection
Inspection and observation should be carried out on afternoon work.
observation
Worksite and workshop should be cleaned and organized by each work team.
Cleaning
Report the completion of the work (subcontractor construction manager)
Report ➢ incase of the night work be sure transfer shift and conduct inspection and observation through TBM
V. Method statement and process
V .i. HSE Operation Procedure
Almost
Likelihood
Occasiona Certain
Severity Rare Remote Frequent (5)
Prior to work (1) (2)
l
(4)
(Reflect to R/A, JSA) (3)
During the Work Major (4) M (4) M (8) H (12) H (16) H (20)
(Check to comply with H/P implementation) Moderate (3) L (3) M (6) M (9) M (12) H (15)
- Reflect H/P to next work plan H: High Risk M: Medium Risk L: Low Risk
V. Method statement and process
V .i. HSE Operation Procedure
Prior to conduct high risk work Job Safety Analysis require to produce for workers to
□ Job Safety Analysis understand potential hazards
Acoustic layer installation APP –With scaffold
V. Method statement and process
V .i. HSE Operation Procedure
Prior to conduct high risk work Job Safety Analysis require to produce for workers to
□ Job Safety Analysis understand potential hazards
Acoustic layer installation APP –Without scaffold
V. Method statement and process
V .i. HSE Operation Procedure
Prior to conduct high risk work Job Safety Analysis require to produce for workers to
□ Job Safety Analysis understand potential hazards
ALCP Subframe and panel installation
V. Method statement and process
V .i. HSE Operation Procedure
Prior to conduct high risk work Job Safety Analysis require to produce for workers to
□ Job Safety Analysis understand potential hazards
Metal ceiling work ALP1
V. Method statement and process
V .i. HSE Operation Procedure
Prior to conduct high risk work Job Safety Analysis require to produce for workers to
□ Job Safety Analysis understand potential hazards
Metal ceiling work ALP2
V. Method statement and process
V .i. HSE Operation Procedure
Prior to conduct high risk work Job Safety Analysis require to produce for workers to
□ Job Safety Analysis understand potential hazards
subframe hoisting by pulley and rope
V. Method statement and process
V .i. HSE Operation Procedure
Prior to conduct high risk work Job Safety Analysis require to produce for workers to
□ Job Safety Analysis understand potential hazards
subframe hoisting by pulley and rope
V. Method statement and process
V .i. HSE Operation Procedure
Prior to conduct high risk work Job Safety Analysis require to produce for workers to
□ Job Safety Analysis understand potential hazards
Man lift
Boom lift operation
V. Method statement and process
V .i. HSE Operation Procedure
Prior to conduct high risk work Job Safety Analysis require to produce for workers to
□ Job Safety Analysis understand potential hazards
Scissor lift operation
V. Method statement and process
V .i. HSE Operation Procedure
Prior to conduct high risk work Job Safety Analysis require to produce for workers to
□ Job Safety Analysis understand potential hazards
Man lift lifting ground floor to level 1 and level 2
V. Method statement and process
V .i. HSE Operation Procedure
Prior to conduct high risk work Job Safety Analysis require to produce for workers to
□ Job Safety Analysis understand potential hazards
Scaffold Erection
V. Method statement and process
V .i. HSE Operation Procedure
Prior to conduct high risk work Job Safety Analysis require to produce for workers to
□ Job Safety Analysis understand potential hazards
Hot work
V. Method statement and process
V .i. HSE Operation Procedure
Prior to conduct high risk work Job Safety Analysis require to produce for workers to
□ Job Safety Analysis understand potential hazards
XPM
V. Method statement and process
V .ii. ADC Training List
V. Method statement and process
V - iii. Subcontractor Conducted Training
02. Fire watch man 45 minute HSE Manager 06/11/2022 1330m hrs.
Training
2
1
Once rigging works is done slowly pull-out the subframe materials
Parking the container on flat and stable terrain, Open the pallet out from Container & transfer the pallet to loading platform
container, position the loading platform & start rigging works to stablish Forklift position.
Using lifting belt.
5
4
3
Equipment procedure
Safety net
Boom lift
• Movable Scaffold plank
secure with truss
Man basket
VI Method statement and process
Metal ceiling Risk Assessment for individual work acoustic layer installation
o Fire prevention control(i.e, Remove fire agents ,deploy fire watch man
o Fire Hazard due to hot work with fire extinguisher
Fastener and wire o o Provide fire curtain for protect spark to fall down,
Trip and fall ★★★
mesh setup
o Drop object o Competent worker and with valid hot work tools .
o Use proper ppe .
Wire rope and o Use fall protection net & Anchor body harness with designated life
o Fall from height
rock wool ★★★ line (100% tie off)
o Falling objects
installation o Secure loose materials
Lifting Fastener
Material Stacking operation Wire mesh and rockwool installation
component weld
Metal ceiling Risk Assessment for individual work in acoustic insulation layer work
Life line
Secure with lifting belt and u shackle
Hot work
▪ Apply permit to work for hot work
▪ All permit and related document must be display hot work
location
▪ Use valid and good condition hot work tools
▪ Deploy fire watch at hot work location with fire fighting
equipment
▪ Competent person carried out hot work
▪ Before start hot work check no combustible material present
near hot work
▪ Use proper PPE for Hot work (leather hand gloves ,apron
,welding shield.
▪ Welding hose gas hose segregate properly .
▪ Welding cable and welding holder make sure no wire exposed .
o Sharp edge of the wire mesh, steel o Use padding or cover the sharp edge
Manual handling ★★
cable , clump o Hand gloves for material handling workers
Shifting of metal o Falling during shifting o Follow safer lifting and handling method.
mesh on Roof ★★★ o Don’t lift or handle more then 25 kg
o Hit by load or vertical posts
Top o Maintain 3 point contact while climb up scaffold .
o Provide the safety net underneath of substructures
o Falling from height, o Fire prevention control (i.e.; Remove fire agents, Fire blanket, Fire
Installation o Falling objects ★★★ watchmen)
HP
o Fire o All hand tools shall be tied properly with lanyards
o All loose bolts and nuts shall be carried in bags
Wire mesh and rock wool installation without scaffolding area by using movable platform
Setup with praline. Parallel life line installed
Movable work platform for panel installation setup with
additional subframe
APP installation (Work at
Work Height)
Activity
Hazard/ o Fall from height
Risk o Falling objects
Impact ★★★
Scaffold working platform at 14 meters provided by ADC, additional scaffold will provide
by GKS
APP interior ceiling
ADC shall provide the scaffold to height of 1st layer of APP ceiling system. GKS shall
provide the additional scaffold above to reach different installation height
Scaffold erection and dismantle
Employee Local Foreign Total
position staff staff
Scaffolding 02 - 02
supervisor
Scaffolding 10 - 10
worker
• The environment free from hazard in which the scaffold is to be used including well compact,
Total 12
flat and sturdy surface condition (6 times the intended load). manpower
• Overturning need to be prevented by affixing the scaffolding or by installing outriggers’ scaffold
• Platform will planked and decked (L16'xW10"xH2"), space between the platform and in-
between platform and toe board max. L inch (2.5 cm) Wide.4.
• Scaffold platforms capable at least for light-duty:25, Medium-duty:50 & Heavy-duty:75 pounds
per square foot[1 p/sf equal 4.88 kg/m2]
• each span/bay must need minimum 250 pounds load bearing capability for each person.6.
• The distance between each post/ standard of scaffold shall be within: (1.5 to 1.8m)
• For every 10m of spacing between columns, cross bracing on 45 degree angles need to install.
• The overall height of the scaffold maximum 40m. If the height is more than 20m, the height of
the mainframes shall be within 2m. The gap between each mainframe shall be 1.8m.
• The width of a ramp shall be 90cm & angle of inclination maximum 30 degrees.
• Max. distance between brackets to which scaffolding and guardrail supports are attached 3.2m.
(10.5 feet)
• Safety handrails, toe board, Stairway, ana an opening-closing type of platform gate need to
install
APP interior ceiling
Build
Build passages
passages between
between scaffolding
scaffolding
脚手架之间搭设过人通道
platforms
A walkway is set up between the scaffolding, and the load capacity is greater than 500KG. The
single handling weight of the passage is not allowed to exceed 100KG, and the load of the
passage is not allowed to exceed 3 people at the same time..
APP interior ceiling
When installation of subframes completed, the safety net shall be laid to prevent the falling accident of
operators or materials during operation over the structures
APP interior ceiling
The access passage for top operation shall be removed after the construction of this area is
completed, before that the last ceiling module shall be installed
ALCP exterior ceiling
A pedestrian passage shall be set up at the place where allow operators go over to the upper, which
ensures the safe access (Caution: the height distance between column top to ceiling top is more than
2m, extra guardrails need to be added.
ALCP exterior ceiling
Safe Working
platform by scaffold
plank secure with
additional subframe
or primary structure
• Life line install between the primary structure and body harness shall be 100% tie
off
• Use Fall arrester
ALCP exterior ceiling
Fall arrester
2M
fix the winch and ground pulley on the hardened ground, and fix the guide pulley and
lifting pulley at high altitude
ALCP exterior ceiling
ALCP exterior ceiling finishing work
Rescue Team
Leader Report to GKS Report to ADC
i. Conduct risk assessment according to the characteristics of the construction site and the
hazards of the production safety process;
ii. Provide guidance to the safety team to implement and monitor safety measures to reduce
and avoid accidents from dangerous sources.
iii. Ensure accurate risk assessment data and information of hazard sources to provide a
reasonable and accurate basis for emergency response assessment;
iv. Implement effective social communication resources for emergency response and provide
timely emergency response support measures;
v. Determine the location of the emergency response on-site command center where various
accidents may occur so that the emergency response can be activated promptly.
Assist the insurance department on compensation for casualties and property losses;
Roles and responsibilities of the accident investigation team:
i. Preserve & protect the accident scene;
ii. Taking samples and sealing of relevant physical evidence on site;
iii. Investigate and understand the main cause of the accident and the responsibilities of the relevant
personnel;
iv. Provide an investigation report on the accident & recommend remediation actions where appropriate.
1. Commencement of the plan: Emergency plan is activated immediately when an accident occurs.
2. Emergency measures: The on-site safety Manager will assess whether the accident will escalate
further according to the type of accident and takes appropriate measures to prevent any further
escalations. Upon confirmation that no harm will be caused to the rescuers, the rescue team will
be directed to enter the scene of the accident to rescue the injured personnel. When the injuries
are serious, to immediately call the local emergency center for assistance.
3.Termination of the emergency plan: The emergency commander can issue an emergency termination
order when the following conditions are met:
i. Emergency rescue operations have been completed and the hazards causing the accident are
effectively controlled and eliminated;
4.Resumption of work: After the emergency rescue plan is terminated, effective measures should be undertaken to
prevent further accidents. The site clean-up must be carried out in an organized manner to prevent further property
damage and/or casualties, and protect related physical evidence. After the cleaning is completed, construction and
production can be resumed after approval by the relevant local authorities or departments.
5.Accident summary report: After the conclusion of the rescue, contractors should report the accident
accordingly. Summarize the entire process of emergency rescue plan implementation, improve the deficiencies
and defects in the emergency rescue plan where necessary and provide experience for the establishment,
formulation and modification of future plans.
Penalty procedure
Monthly HSE Execution Plan
- Emergency Rescue Drill September - Emergency Rescue Drill Will Conduct at Site As per monthly
Event
- Monthly safety award 2022 - Safety Day Celebration plan