Date: [dd-mmm-yy]
1. CMS-CSRN Posting:
Posting date: [dd-mmm-yy] EOI deadline for submission: [dd-mmm-yy]
3. Type of proposal:
[Full Technical Proposal (FTP), Simplified Technical Proposal (STP), Biodata Technical Proposal (BTP)]
8. Budget (in US$): [Indicate if Estimated, Maximum – provide Currency and Budget Amount]
Attachments:
Attachment 1: Cost Estimate/Budget [ ]
Attachment 2: Minutes of Executing Agency’s CSC-Shortlisting meeting [ ]
Attachment 3: Complete Draft Request for Proposals (RFP) [ ]
Attachment 4: Narrative Evaluation Criteria (NEC) [ ]
1
Revised August 2020
Attachment 1: Cost Estimate/Budget
The cost estimate must not exceed the budget approved in the procurement plan. If it does, the procurement plan
must be revised and submitted to the project unit for publication. The cost estimate must include all relevant
components for the assignment, i.e.,
(i) Remuneration
(ii) Out-of-Pocket Expenses
(iii) Provisional Sums (non-competitive)
(iv) Contingencies (non-competitive), and
(v) When relevant, a provision to cover local indirect taxes (in accordance with loan/grant agreement)
Templates for the Summary and Personnel Evaluation Sheets (SES and PES) are found on the ADB website -
https://www.adb.org/documents/recruitment-firms-individual-consultants-executing-agencies. SES and PES must be
adapted to the specific requirements of each assignment, including the list of key international and national experts
and the weight for each evaluation criteria/expert position.
2
Revised August 2020
Part B: ADB Comments on EA’s Submission 1
(Delete any section for which there is no comment)
1. General comments on Submission 1:
2. Terms of Reference:
3. Shortlisting Criteria:
4. Shortlist:
5. Narrative Evaluation Criteria (NEC):
6. Request for Proposals:
a) Section 1: Letter of Invitation
b) Section 2: Data Sheet
c) Summary and Personnel Evaluation Sheets (SES and PES)
d) Contract Forms including Special Conditions of Contract
7. Cost Estimate:
8. Other issues:
(e.g. Eligibility, Anticorruption Policy, Conflict of Interest, Unfair Competitive Advantage or Contract Types)
9. ADB-required Integrity Due Diligence Checks
a) Are any of the shortlisted entities (including joint venture partners and proposed sub- Yes [ ] No [ ]
consultants) on the
ADB complete sanctions list? https://lnadbg4.adb.org/oga0009p.nsf/sancALL1?
OpenView&count=999
or ADB-required IDD checks?
https://lnadbg4.adb.org/oga0009p.nsf/alldocs/AANA-AA34XQ?OpenDocument
b) Is the current ADB external auditor among the shortlisted entities? Yes [ ] No [ ]
If YES, seek clearance from the Office of the Auditor General (OAG) before
proceeding and submit in attachment.
c) Are any of the concerned entities (including joint venture partners and proposed sub- Yes [ ] No [ ]
consultants) in a situation of actual or potential Conflict of Interest, including a Conflict
of Interest with the ADB staff by virtue of taking part in this process (refer to RFP
Instructions to Consultants, para. 3)?
If YES, the User Division must consult with OAI for advice on the case and possible
remedy.
10. Performance-Related Due Diligence Checks
a) Are any of the shortlisted entities (including joint venture partners and proposed sub- Yes [ ] No [ ]
consultants) on the CMS suspension status https://cms.adb.org ?
3
Revised August 2020
Prepared by:
Approved by:
Distribution:
Project Unit/Country Director
Project Team Leader
PPFD-LCU
Assigned PPFD Procurement Specialist
4
Revised August 2020