RCPT-Requesting Form For Concrete Casting

The document contains multiple inspection requests for the MJQE TOWER construction project. The requests are for inspections of pile filling, rebar installation in pile caps before formwork is closed, formwork for pile caps before concrete pouring, removing pile cap formwork, leveling of soils for the basement slab, and the level of the poured lean concrete basement slab. Each request form provides spaces to document comments from the inspection and approval signatures from various teams.

Uploaded by

Kim Seng
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views

RCPT-Requesting Form For Concrete Casting

The document contains multiple inspection requests for the MJQE TOWER construction project. The requests are for inspections of pile filling, rebar installation in pile caps before formwork is closed, formwork for pile caps before concrete pouring, removing pile cap formwork, leveling of soils for the basement slab, and the level of the poured lean concrete basement slab. Each request form provides spaces to document comments from the inspection and approval signatures from various teams.

Uploaded by

Kim Seng
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

INSPECTION REQUEST

Project Name: MJQE TOWER (MAO TSE TUNG) Date:………………….


Issue to MJQE TOWER Issued by KVT Inspection Request No.
Subject Inspection of pile filling
Drawing/ Document No: Rev. Status Attach Document
Type of Work : Concreting Location: As attached highlight in DWG Date for Insp: Time:….................
Comment for 1st Inspection :

Checked by Checked by Checked by Checked by


Requested by (Const. Team) (MEP) (QC Team) (Survey Team) Approved by

Comment for 2nd Inspection :

Checked by Checked by Checked by Checked by


Requested by Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 3rd Inspection :

Checked by Checked by Checked by Checked by


Requested by Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)
INSPECTION REQUEST

Project Name: MJQE TOWER (MAO TSE TUNG) Date:………………….


Issue to MJQE TOWER Issued by KVT Inspection Request No.
Subject Inspection of install rebar pile cap before closing the formwork
Drawing/ Document No: Rev. Status
Type of Work : Rebar Location: As attached highlight in DWG Date for Insp: Time:
Comment for 1st Inspection :

Checked by Checked by Checked by Checked by


Requested by Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 2nd Inspection :

Checked by Checked by Checked by Checked by


Requested by Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 3rd Inspection :

Checked by Checked by Checked by Checked by


Requested by Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)
INSPECTION REQUEST

Project Name: MJQE TOWER (MAO TSE TUNG) Date:………………….


Issue to MJQE TOWER Issued by KVT Inspection Request No.
Subject Inspection of formwork of pile cap before casting concrete
Drawing/ Document No: Rev. Status Attach Document
Type of Work : Concrete Location: As attached highlight in DWG Date for Insp: Time:….................
Comment for 1st Inspection :

Checked by Checked by Checked by Checked by


Requested by Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 2nd Inspection :

Checked by Checked by Checked by Checked by


Requested by Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 3rd Inspection :

Checked by Checked by Checked by Checked by


Requested by Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)
INSPECTION REQUEST

Project Name: MJQE TOWER (MAO TSE TUNG) Date:………………….


Issue to MJQE TOWER Issued by KVT Inspection Request No.
Subject Remove formwork for pile cap
Drawing/ Document No: Rev. Status
Type of Work : Remove formwork Location: As attached highlight in DWG Date for Insp: Time:
Comment for 1st Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 2nd Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 3rd Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)
INSPECTION REQUEST

Project Name: MJQE TOWER (MAO TSE TUNG) Date:………………….


Issue to MJQE TOWER Issued by KVT Inspection Request No.
Subject Inspection of level soils backfill for basement slab
Drawing/ Document No: Rev. Status
Type of Work : soils backfill Location: As attached highlight in DWG Date for Insp: Time:
Comment for 1st Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 2nd Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 3rd Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)
INSPECTION REQUEST

Project Name: MJQE TOWER (MAO TSE TUNG) Date:………………….


Issue to MJQE TOWER Issued by KVT Inspection Request No.
Subject Inspection of level lean concrete basement slab
Drawing/ Document No: Rev. Status
Type of Work : Lean concrete Location: As attached highlight in DWG Date for Insp: Time:
Comment for 1st Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 2nd Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 3rd Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)
INSPECTION REQUEST

Project Name: MJQE TOWER (MAO TSE TUNG) Date:………………….


Issue to MJQE TOWER Issued by KVT Inspection Request No.
Subject Inspection of install rebar for basement slab
Drawing/ Document No: Rebar Basement slab Rev. Status
Type of Work : Rebar Location: As attached highlight in DWG Date for Insp: Time:
Comment for 1st Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 2nd Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 3rd Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)
INSPECTION REQUEST

Project Name: MJQE TOWER (MAO TSE TUNG) Date:………………….


Issue to MJQE TOWER Issued by KVT Inspection Request No.
Subject Inspection of formwork of basement slab before casting concrete
Drawing/ Document No: Rev. Status
Type of Work : Concrete Location: As attached highlight in DWG Date for Insp: Time:
Comment for 1st Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 2nd Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 3rd Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)
INSPECTION REQUEST

Project Name: MJQE TOWER (MAO TSE TUNG) Date:………………….


Issue to MJQE TOWER Issued by KVT Inspection Request No.
Subject Inspection of install rebar column before closing the formwork
Drawing/ Document No: Rev. Status
Type of Work : Rebar Location: As attached highlight in DWG Date for Insp: Time:
Comment for 1st Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 2nd Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 3rd Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)
INSPECTION REQUEST

Project Name: MJQE TOWER (MAO TSE TUNG) Date:………………….


Issue to MJQE TOWER Issued by KVT Inspection Request No.
Subject Inspection of formwork of column before casting concrete
Drawing/ Document No: Rev. Status
Type of Work : Concrete Location: As attached highlight in DWG Date for Insp: Time:
Comment for 1st Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 2nd Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 3rd Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)
INSPECTION REQUEST

Project Name: MJQE TOWER (MAO TSE TUNG) Date:………………….


Issue to MJQE TOWER Issued by KVT Inspection Request No.
Subject Inspection of formwork before install rebar slab
Drawing/ Document No: Rev. Status
Type of Work : Formwork Location: As attached highlight in DWG Date for Insp: Time:
Comment for 1st Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 2nd Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)

Comment for 3rd Inspection :

Checked by Checked by Checked by Checked by


Requested by Received By Approved by
(Const. Team) (MEP) (QC Team) (Survey Team)
REQUEST FOR CASTING CONCRETE
PROJECT NAME : Date:
Project Location:
Issued by: Issued to:

Location of inspection:
Inspection Date:
Casting Date:

Type of Work:
Percentage of
No. Work Description REMARK
completion
1 Support
2 Formwork
3 Reinforcement
4 Cover

Type of Concrete:
1 Quantity
2 Slump
3 Strength

Consultant's Comments

Action Comments

Approve

Approve with comments

Not Approve

Prepared by Checked and Approved by