Brief History About Host Company
2
The company I have spent the internship period with is Tesfaye
Tiruneh Building Contractor.
Tesfaye Tiruneh Building Contractor BC is a privately owned
construction firm established in 1990 EC as a class 7 building
contractor by Tesfaye Tiruneh who is the owner and general
manager of the company.
According to Ethiopian quality assurance agency, now the company
is a class 4 building contractor.
The main customers of the company are
Overview Of The Project I Participated In
3
The construction site is found in Lebu, Addis Ababa. The client of the
project is Mrs. Bekelech Hussen. And Tesfaye Tiruneh Building
Contractor BC is the one in charge on constructing the actual
structure.
The project is G+1 residential building that covers an area of about
175 square meter and it takes a total cost of about 1.8 million birr.
It have two living-room, three bed-room, two dining-room, one
kitchen, three toilet, two bath-room, one maid-room and one prayer-
room. And structurally having isolated/spread footing, dog legged
staircase and solid slab.
Command Flow In The Company
4
Responsibilities of Individuals In The Command Flow
5
Procedures
Construct eucalyptus strut to
support the soffit (Cristy).
Construct soffit (Fondo) and
side board (Sponda).
The formwork will be coated
with burned oil and braced to
prevent movement.
Provide reinforcement and
spacer.
Finally cast the concrete
Staircase
15
Procedure
Construct soffit formwork to
support the slab.
Bar arrangement.
Construct side formwork and
mark the risers and threads.
Arrange risers and hanger
reinforcement.
Tie spacer and cast concrete
into formwork.
Slab 1. Ribbed slab construction
16 Provide props and joists to support
precast units (Modini).
Construct Cristy & Fondo to
support the beam.
Arrangement of precast beams.
Arrange hollow concrete blocks
(Rosa Cometa).
Construct side board (Sponda).
Arrange connection bar and mesh.
Electrical conduit installation.
Reinforced concrete will be casted
into the beam formwork and on
Rosa Cometa.
Con’t…
17
Slump test
The mould will be wetted with
water.
Then the mould is filled with three
layers and each layer should be
compacted with 25 blow.
Excess concrete will be trimmed Interpretation
and the mould removed easily The allowable slump height is
then measure the slump height.
From 50mm to 125mm
Con’t…
20
Cube test
The mould is coated with releasing
agent.
filled the mould with three layers and
each layer should be compacted with
25 blow.
Left the concrete to set for 24 hours.
The strength of the concrete is
The cube is cure continuously in water defined as the strength below
bath. 5% at which the cube is
The cube is crushed in laboratory at the crushed. And the 7th day
7th and 28th day. strength is expected to be 65%
of the 28th day strength.
Overall internship experiences
21
Technical skill: able to do experiment and interpret data's, able to read
and implement plans and able to work with Auto CAD and Excel.
Professional skill: able to communicate with workers, leading a team
and develop my work ethics.
Theoretical skill: understand the relationship moment and
reinforcement, overlap of reinforcement bars, segregation and concrete
mix design.
Practical skill: setting out of a building, about excavation, checking
alignment and casting different structures.
Problem solving skill: segregation problems, reinforcement shift and
shortages of reinforcement problems.
Conclusion
22