Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
79 views
8 pages
OSA-P-SRV-22 Workshop Repair General Procedure
Uploaded by
deny
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save OSA-P-SRV-22 Workshop Repair General Procedure For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
79 views
8 pages
OSA-P-SRV-22 Workshop Repair General Procedure
Uploaded by
deny
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save OSA-P-SRV-22 Workshop Repair General Procedure For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 8
Search
Fullscreen
Work Procedure Rev, OSA PT. OSA INDUSTRIES INDONESIA No. : OSA-P-Sav-22 Date :30 March 2012 | Page Indonesia WORKSHOP REPAIR GENERAL PROCEDURE Checked & Approved by : Prepared by: (Harnf Hutajulu) operations Manager . | QC Engineer Controlled Co, ara| OSA PT. OSA INDUSTRIES INDONESIA _ No. Indonesia [Date :30 March 2012 | WORKSHOP REPAIR GENERAL PROCEDURE, Amendment Record Sheet Date of Revision Item No. Issue No. Description of Change T | Logo OSA From “OSA | 27March 2012 | Change Logo OSA ou Industries” to “OSA Industries indonesia” _| Taare py Hs Smoot Fae ae Controlled Cop,’ aintOSA Work Procedure | PT OSAINDUSTRIES INDONESIA [No. vosmP-sAva2 Rew 01 Industries } Indonesia ee Date _:30 March 2012 | Page: 3/8 WORKSHOP REPAIR GENERAL PROCEDURE Safety Procedures 1.0. Purpose ‘The purpose of this procedure is to establish guidelines and provide a Workshop Repair General Procedure system at PT. OSA Industries Indonesia and/or the contracts. The procedure shall meets to any requirement and binding to other procedure continuously. 2.0 Method 2.1 Competency and trained Man Power only authorized for repair and has been trained for safety training for any execution. 2.2. Safety action taken carefully to bleed off the remaining pressure at valve & actuator, also remaining energy from mechanism springs hold or stuck. 23. Take normally position between valve and actuator to be sure no more powerful action required for dissembling any loosen tightens bolt & nut. 24. Devices use by electrical power must be sure for any protection to drop off fuses at MCB, and ‘easy to manage release energy from main panel if emergency required. 2.5. Valve & actuator Stuck must be aware to keep the extra power mechanism action to avoid back power in order release devices or any tighten component/bolt/nut. Analysis the safety dissembling unit by prepare additional tools & equipment for safety dissembling unit accordingly 3.0 Valve & Actuator Receiving 40 Without “Controlled Copy” stomp, documents Uncontralled « 3.1 Identify the valves and actuator from size, ANSI, type, acting system, port size, 3.2 Record the manufacturer's name plate information on the side of the valve in the valve report. 3.3. Locate and identify the part & components on the valve & actuator a) Body valve and Actuator bb) all fittings and adjustable devices ) Flange type 4d) Bolt & nut type with Allen head screw. ji. Bolt head type. 3.4. Lifting for loading and unloading unit valve & actuator from truck, must be conducted by signal Man as receiving process. Lifting shall define rigging tools for robe tightens to the ‘goods, considering balance of weight to avold swing fall from lifting procedure. During Repair Service 4.1. Personnel must be wearing PPE during in repair service area. 4.2. Prepare proper tools & equipment as required and place in the boxes in free access area. Solvent chemical uses for easing and rust removal must be awared to point and not face to person or hot area. Controlled Coy teler OSA Saar Industries eee Indonesia Date :30March 2012 | Page: 4/8 | Work Procedure PT. OSAINDUSTRIES INDONESIA No. : OSA-P-SRV-22 | Rev. :01 WORKSHOP REPAIR GENERAL PROCEDURE | 43. Equipment force by pressure must be indicated the following connection tighted and safe socket to avoid release from pressure arising 44 Lifting equipment should be managed for loading & unloading dissembling parts/component ‘more than 15 kgsin the right position and free moving access area from person and stuffs. 4.5 Competency Man Power only authorized to conduct as supervisory technician the repair service, method execution as required due to detail SOP for EA valve & actuator type. 4.6. Sparkle from grinding or drilling devices shall be sure take action at the safe area from fire Inspection Purpose ‘The purpose of this procedure is to establish guidelines and provide an inspection procedures for VALVE WORKSHOP REPAIR system at PT. OSA Industries Indonesia and/or the contracts. The inspection shall be conducting by Engineering to find out instruction repair service respectively, and shall binding to Inventory Check List procedure. ut 12 13 14 1s 16 17 Check list to Inventory if the repair service unit must be replaced before dismantle from f/s, colleting from ex-stock Marunda warehouse both from new reconditioned or defective unit available to repair. Leak and function test valve to find out defective valve & actuator, record parameter issued and due to standard requirement test API, ANSL Dissembling valve and actuator to find defective and fallure damages parts/component, mounting and body condition. Take a notes and picture for EA damaged goods for any comparison before and after recondition. Clean up body & actuator, parts, component, devices to have the clear current condition and always tag any releasing devices to re-install on the original position. Separate the good and damages parts, component to prepare the execution of recondition and repair service. Engineering Review a). Decide as the actual condition to repair for minor or major repair 'b) Action plan to execute repair service ) Failure analysis if any critical badly damaged caused of fluid process changing contained Data base recordable shall tag ID and all information for track and trace repair status monitoring, up-dating data base to manage F/s, service area, Tag no required for repair memo and remarks both for field and inventory. Woot "Coed Copy same, duane stneoncleds erated COL x araWork Procedure OSA PT.OSA INDUSTRIES INDONESIA | No. :O5A-SRV-22 [Rev :01 | _ Indonesia [Date :30March 2012 | Page: 5/8 | = 3 ; 1 WORKSHOP REPAIR GENERAL PROCEDURE Procurement Purpose The purpose of this procedure is to establish guidelines and provide Procurement procedures for VALVE WORKSHOP REPAIR system at PT. OSA Industries indonesia and/or the contracts. This procedure shall refer to any procurement pracess and binding to General Procurement Procedure as the master procedure therefore. 1.1 Record the requirement spare parts, components to procure and must be related standard from ‘original manufacture manual [API, ANSI, NACE, ASTM]. 1.2 Fabricate parts/component must be issued the laborary standard shall define and meet to the current requirement process, meet the temperature, pressure, flow capacity and typical of fluids characteristic. 4.3 Record all parts/component for actual dimensional parameter if no S/N, and must be adjusted to existing mounting and bracket as required 1.4 Differential material must be recognized and shall meet to the current requirement at safety factor standard, Soft goods must be stored for spare units net limited to requirement if any lack of reconcition need to secondary replacement or reworks 15 Action to Procure 4a) Uist of parts/component inquiry c/w spec, size, material comp b) Request for proposal to vendor or direct purchase )_ Prices must be leveling to normal price, and shall define the competitive price 4). Special price allowable accepted only for urgent/emergency requirement @) Propose for non-rate material contract for approval £). Delivery material shall meet to the repair service schedule due date completion 1.6 Up-date data to Inventory recordable for buffer stock and running stock always Fabrication Purpose ‘The purpose of this procedure is to establish guidelines and provide Fabrication procedures for VALVE WORKSHOP REPAIR, system at PT. OSA Industries Indonesia and/or the contracts. 1.1 Meterial/eomponent fabrication must be related to standard not limited the composition materia, original dimensional and meet to current process fluids media. 1.2 Fabrication by welding filler, must be meet to test to ensure from crack material and leaking following PWHT and WPS as required welding procedure standard. 1.3. Record all parts/component for actual dimensional parameter if no S/N, and must be adjusted to existing mounting and bracket as required. Differential material must be recognized and shall meet to the current requirement at minimum. Scrap material must be stored back to warehouse for junk material record. Without “Coniled Copy stomp, document is Uncontvaled Controlled Copy oe arte 2Os inl Work Procedure le | PT.OSA INDUSTRIES INDONESIA No -oSap-sav.22 | Rev. 01 Industries jie. seer seve eee Indonesia [Date :30March 2012 | Page: 6/8 r es / WORKSHOP REPAIR GENERAL PROCEDURE | 1.5. Action to Fabricate a) List of parts/component inquiry c/w spec, size, material comp, b) Request for proposal to vendor or direct fabrication ©) Prices must be leveling to normal price, and shall define the competitive price 4d). Special price allowable accepted only for urgent/emergency requirement €) Propose for non-rate material contract for approval f) Delivery material shall meet to the repair service schedule due date completion 1.6 Up-date dats to Inventory recordable for buffer stock and running stock always 1.7 Sub-contract to vendor for fabrication shall meet the standard and comply with requirements Recondition, repair sei Purpose The purpose of this procedure is to establish guidelines and provide Recondition, repair service procedures for VALVE WORKSHOP REPAIR system at PT. OSA Industries Indonesia and/or the contracts. 1.1 Parts/component/body must ensure could be reconditioned. Resize and over size dimensional is not allow to recondition if any devices not meet to mounting body. 1.2 Wall thickness reduce by process only allowable to recondition and shall meet the wall thickness requirement for re-metal, hard facing to the original dimens‘onal size. 1.3 Loosen and Tighten all Bolt & Nut shall allow to ANSI class requirement for torque moment, and shall re-check the final action before dispatch and packing, 1.4 Record all parts/component for actual dimensional parameter if no S/N, and must be adjusted to ‘existing mounting and bracket as required. 1.5. Modification shall allow not to change any function, specification and system to operate the unit for reason of re-positioning or swapping parts/component from other scrap unit if any, Action to recondition Dissembling Recondition, repair service Parts/ component replacement Re-assembling Coating & Painting Testing Packing 1.6 Up-date data recordable to Master Data Base. 1.7. Sub-contract to. vendor for recondition repair service shall meet the standard and comply with requirements and acknowledge by the Company. ‘Without *Conroled Copy” stomp, docoment i Uncontroed , Controlled Co; RLWork Procedure PT. OSA INDUSTRIES INDONESIA | No. : OSA-P-SRV-22 | Rev. :01 [ate :30March 2012 | Page: 7/8 | WORKSHOP REPAIR GENERAL PROCEDURE Pressure & Function Testing 1.0 Purpose ‘The purpose of this procedure is to maintain a system which identifies the leak and function test for valve & operated device due to standard EA type of API, ANSI, NACE, ASTM, ISO. 2.0 Scope Every valve is to be hydrostatically tested to ensure the pressure integrity of valve body. The valve seat is also checked to verify that leakage past the relevant standard and customer requirement Function test is required for complete operating valve & operated devices ensure to operable & reliable. 3.0 Definitions 2. Product Result of a set interrelated or interacting activities which transforms inputs into outputs. b. Record Document —_: Stating results achieved or providing evidence of activities performed. Inspection Conformity evaluation by observation and judgment accompanied as appropriate by measurement, testing or gauging. 4, Bidirectional Valve: Avalve designed for sealing in either direction. e. Plug Prevents flow or leakage into the down stream conduit when in the closed position. Valves shall be single or double seated, bidirectional ‘or unidirectional, Unidirectional valves shall be marked with a flow irection arrow. f. Closure Member: That part of a valve which is positioned in the flow stream to.permit, obstruct or regulate flow. 4.0 References Material 4.1 AVIW-TBM-001 ‘Work Instruction of Test Bench Machine AYFC-1 4.2. APIStandard 598: Valve Inspection and Test 4.3, APISpecification Specification for Pipeline Valves (Gate, Plug, Ball and Check Valves) 6D 4.4 APIStandard 608: Metal Ball Valves-Flanged, Threaded and Welding Ends 4.5 ASMEB1.20.1 Pipe Threads, General Purpose (inch) 46 ASMEBI6.11 Forged Steel Fitting, Socket-Welding and Threaded 4.7 ASMEBI6.34 Valves - Flanged, Threaded, and Welding Ends 48 MSSSP-55 Quality Standard for Steel Castings for Valves, Flanges and Fittings and other Piping Components - Visual Method 4.9 MS55P-91 : Guidelines for Manual Operation of Valves With “Controle Copy” stomp, documents Uncontrolled Controlled Copy eaeOSA Work Procedure PT. OSA INDUSTRIES INDONESIA No. :OSA-P-SRV-22 | Rev. :01 Industries LI Indonesia Date :30 March 2012 | Page: 8/8 WORKSHOP REPAIR GENERAL PROCEDURE Packaging 1.0, Purpose 20 3.0 40 ‘The purpose for Packaging is to find the best and safe for material transportation both for on and off shore delivery. The procedure is not limited to recondition valve & operated devices, but for sure as a guide line to various materials required for packaging. ‘Scope Every valve and actuator must be bended at packaging for delivery requirement, safe for loading and unloading, safe while boat transportation fram shaking and hook to avoid damages goods. Packaging Method 3.1. Sizing and weight material to prepare wooden raw material 3.2. Material take in place on top available Pallet, and shall fit at surface to ensure proper position at bottom site in balance and fully bended by stect plating 3.3. Wrap all face Pallet with wooden and nailed strongly to form container frame and cover all Material 3.4. Direction informative to hook up and loading-unloading Description 4.1 Construction Pallet & Wooden Box with equal dimensional to material size nailed for any connection and shall pallet at bottom side. 4.2 Locking All boxes must be bended between Materials to the wooden box by steel plate and have no shaking for load & unload action. 4.3 Packing Uist Destination, Material spec Info and Quantity. 4.4 Delivery Must be safe from hook and maneuver during loading-unloading, easy for rigging wrap and robe tighten for lifting. 4.5. Final Check : Final Check list before delivery must be approved by authorized personnel or Supervisor Without “Contreled Cony” stomp, document is Uncortaled Controlled Co) Dewrere
You might also like
Blender 1pp
PDF
No ratings yet
Blender 1pp
393 pages
Product - Selection - Guide Rexroth
PDF
No ratings yet
Product - Selection - Guide Rexroth
76 pages
Mcr5 Rexroth Wheel Motor
PDF
100% (1)
Mcr5 Rexroth Wheel Motor
20 pages
Gold Cup P678 Options Spare Parts Exploded Views HY28266703GCUS
PDF
No ratings yet
Gold Cup P678 Options Spare Parts Exploded Views HY28266703GCUS
60 pages
Power Hydraulics PDF
PDF
No ratings yet
Power Hydraulics PDF
407 pages
WAGO User's Guide
PDF
No ratings yet
WAGO User's Guide
86 pages
1pf2gf - Pgf-Int-Gp-Re10213
PDF
No ratings yet
1pf2gf - Pgf-Int-Gp-Re10213
20 pages
NORD BIM1000 General Instructions 200903
PDF
0% (1)
NORD BIM1000 General Instructions 200903
207 pages
Canopen Library User Manual: © Port GMBH 2014
PDF
No ratings yet
Canopen Library User Manual: © Port GMBH 2014
180 pages
CAN Open
PDF
No ratings yet
CAN Open
111 pages
2PE - Technical Catalogue
PDF
No ratings yet
2PE - Technical Catalogue
42 pages
Festo Can Open Cmms
PDF
100% (1)
Festo Can Open Cmms
156 pages
CANopen Manual 920-0025L
PDF
No ratings yet
CANopen Manual 920-0025L
101 pages
Class 5 CANopen Guide
PDF
No ratings yet
Class 5 CANopen Guide
234 pages
Pymodbus
PDF
No ratings yet
Pymodbus
251 pages
Geometry Nodes List
PDF
No ratings yet
Geometry Nodes List
7 pages
Overhaul of PSV
PDF
100% (3)
Overhaul of PSV
5 pages
L2908 Rev. K 07/20: Repair Parts List
PDF
No ratings yet
L2908 Rev. K 07/20: Repair Parts List
48 pages
Can Open
PDF
No ratings yet
Can Open
130 pages
R55-9 1
PDF
No ratings yet
R55-9 1
57 pages
Internal Gear Pumps: Series QX
PDF
No ratings yet
Internal Gear Pumps: Series QX
32 pages
Threading Formulas and Definitions
PDF
100% (1)
Threading Formulas and Definitions
17 pages
W1500 Series Hydraulic Pump: Concentric AB
PDF
100% (1)
W1500 Series Hydraulic Pump: Concentric AB
12 pages
Application Examples From Industry Sectors and Markets
PDF
100% (1)
Application Examples From Industry Sectors and Markets
25 pages
Gear Pumps and Motors "B" Series Group 3: Technical Catalogue
PDF
100% (1)
Gear Pumps and Motors "B" Series Group 3: Technical Catalogue
32 pages
Tobul Catalog
PDF
No ratings yet
Tobul Catalog
44 pages
10 Mpa Single Acting Uniform Speed Rod Action 2-Stage Telescopic Cylinders
PDF
No ratings yet
10 Mpa Single Acting Uniform Speed Rod Action 2-Stage Telescopic Cylinders
10 pages
Bomba de Pistones
PDF
100% (1)
Bomba de Pistones
38 pages
Lesson 4: Pressure Control Valves: Basic Hydraulic Systems
PDF
100% (1)
Lesson 4: Pressure Control Valves: Basic Hydraulic Systems
34 pages
Inventori Tool Box Conoko2
PDF
No ratings yet
Inventori Tool Box Conoko2
24 pages
Prosedur Kalibrasi
PDF
100% (1)
Prosedur Kalibrasi
3 pages
Installation and Start-Up Information PV Series: Variable Displacement Axial Piston Pump
PDF
No ratings yet
Installation and Start-Up Information PV Series: Variable Displacement Axial Piston Pump
14 pages
RGM 2
PDF
No ratings yet
RGM 2
8 pages
Timing and Data Capture: D01277836 - WPCE (Single Wireline Valve / Shear Seal) Post Job Maintenance
PDF
No ratings yet
Timing and Data Capture: D01277836 - WPCE (Single Wireline Valve / Shear Seal) Post Job Maintenance
6 pages
Axial Piston Pump - A10VSO
PDF
No ratings yet
Axial Piston Pump - A10VSO
4 pages
Data Sheet: Lenntech
PDF
100% (1)
Data Sheet: Lenntech
12 pages
Denison Calzoni Type MRT Mrte MRTF
PDF
No ratings yet
Denison Calzoni Type MRT Mrte MRTF
24 pages
Doc307538470550 PDF
PDF
No ratings yet
Doc307538470550 PDF
14 pages
Local Solutions For Individual Customers Worldwide: Accumulators & Accessories
PDF
No ratings yet
Local Solutions For Individual Customers Worldwide: Accumulators & Accessories
20 pages
Staffa Fixed Displacement Hydraulic Motor: Kawasaki Motors Corp., U.S.A
PDF
No ratings yet
Staffa Fixed Displacement Hydraulic Motor: Kawasaki Motors Corp., U.S.A
12 pages
BG8B Parts List Jan 2015
PDF
No ratings yet
BG8B Parts List Jan 2015
20 pages
Accumulatore Charg Instructions
PDF
No ratings yet
Accumulatore Charg Instructions
11 pages
Technical Information: Speed and Temperature Sensor
PDF
No ratings yet
Technical Information: Speed and Temperature Sensor
12 pages
High Torque Geared Motors: T 238.000 NM Output Torque (175.500 LBF - FT)
PDF
No ratings yet
High Torque Geared Motors: T 238.000 NM Output Torque (175.500 LBF - FT)
26 pages
Motor Gear Maintenance
PDF
100% (1)
Motor Gear Maintenance
92 pages
Dokumen Penilaian Kualifikasi: Subject: Major Inspection (MI) of Frame-V GTG G101C Tender No: PS216A1D76
PDF
No ratings yet
Dokumen Penilaian Kualifikasi: Subject: Major Inspection (MI) of Frame-V GTG G101C Tender No: PS216A1D76
1 page
Dokumen Penawaran: Subject: Blanket Purchase Agreement of Chemical Methanol Tender No: PROC104
PDF
No ratings yet
Dokumen Penawaran: Subject: Blanket Purchase Agreement of Chemical Methanol Tender No: PROC104
1 page
Pt. Golden Solution Indonesia: Health and Safety Environment
PDF
No ratings yet
Pt. Golden Solution Indonesia: Health and Safety Environment
1 page
The Fastest Path To Success: Easy Control Relays Easye4
PDF
No ratings yet
The Fastest Path To Success: Easy Control Relays Easye4
9 pages
Kracht 2 SPV SPVF GB 01-08
PDF
No ratings yet
Kracht 2 SPV SPVF GB 01-08
16 pages
KSFC2015-15 HydraForce HTD HF Cover
PDF
100% (1)
KSFC2015-15 HydraForce HTD HF Cover
7 pages
Eaton: Pressure or Pressure-Flow Compensator Control Adjustment Procedures
PDF
100% (1)
Eaton: Pressure or Pressure-Flow Compensator Control Adjustment Procedures
4 pages
Procedure Casing Welding Steel Cast Material
PDF
No ratings yet
Procedure Casing Welding Steel Cast Material
4 pages
Bacis Pneumatic Hydraulic Symbols
PDF
No ratings yet
Bacis Pneumatic Hydraulic Symbols
7 pages
KX71 3 en - HD
PDF
No ratings yet
KX71 3 en - HD
8 pages
OSA-P-SRV-13 Testing Procedure For Check Valve (Refer To API 598 Specification)
PDF
No ratings yet
OSA-P-SRV-13 Testing Procedure For Check Valve (Refer To API 598 Specification)
18 pages
Modification Instruction: Truck, Medium, Mc2, Unimog - All Types
PDF
No ratings yet
Modification Instruction: Truck, Medium, Mc2, Unimog - All Types
3 pages
OSA-P-SRV-24 Testing Procedure For DPE Ball Valve (Refer To API 6D Specification)
PDF
No ratings yet
OSA-P-SRV-24 Testing Procedure For DPE Ball Valve (Refer To API 6D Specification)
12 pages
Brochure E Series en
PDF
0% (1)
Brochure E Series en
5 pages
General Description Arrangement
PDF
No ratings yet
General Description Arrangement
2 pages
SEW EURODRIVE X.E
PDF
No ratings yet
SEW EURODRIVE X.E
2 pages
Closed Vs Open VIS
PDF
No ratings yet
Closed Vs Open VIS
5 pages
TLV SDV & DV Work Steps
PDF
No ratings yet
TLV SDV & DV Work Steps
1 page
OSA-P-SRV-25 PSV Diagnostic and Maintenance Repair and Testing Procedure
PDF
No ratings yet
OSA-P-SRV-25 PSV Diagnostic and Maintenance Repair and Testing Procedure
4 pages
CV Akbar Putra
PDF
No ratings yet
CV Akbar Putra
5 pages
Nmea 0183
PDF
No ratings yet
Nmea 0183
6 pages
Yuken Directional Control Valve Spool Configurations
PDF
No ratings yet
Yuken Directional Control Valve Spool Configurations
3 pages
OSA-P-SRV-26 Control Valve Diagnostic and Function Testing Procedure
PDF
No ratings yet
OSA-P-SRV-26 Control Valve Diagnostic and Function Testing Procedure
3 pages
5 Phase Stepper Motor Catalog - PF Series
PDF
No ratings yet
5 Phase Stepper Motor Catalog - PF Series
5 pages
000 MARC-GTC Document Audit
PDF
No ratings yet
000 MARC-GTC Document Audit
4 pages
Supporting Letter To PROMATCON TEPATGUNA
PDF
No ratings yet
Supporting Letter To PROMATCON TEPATGUNA
1 page
Day Off Personel
PDF
No ratings yet
Day Off Personel
1 page