0% found this document useful (0 votes)
18 views

Process Certification Requirements

This document defines process certification requirements for key suppliers of United Technologies Corporation (UTC). It encompasses the requirements of SAE AS 9103 for managing variation of key characteristics. UTC members and their suppliers must integrate these requirements into their quality management systems. The document standardizes common quality system requirements across business units of UTC and provides additional requirements to supplement AS9103 where needed. It is intended to standardize the application of quality requirements for process control and certification among UTC members and their supply chain.

Uploaded by

Phuc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views

Process Certification Requirements

This document defines process certification requirements for key suppliers of United Technologies Corporation (UTC). It encompasses the requirements of SAE AS 9103 for managing variation of key characteristics. UTC members and their suppliers must integrate these requirements into their quality management systems. The document standardizes common quality system requirements across business units of UTC and provides additional requirements to supplement AS9103 where needed. It is intended to standardize the application of quality requirements for process control and certification among UTC members and their supply chain.

Uploaded by

Phuc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

UNITED TECHNOLOGIES CORPORATION

QUALITY REQUIREMENTS
Number: UTCQR-09.1
Revision: 4
Effective Date: 08/02/13
Page 1 of 7

TITLE

Process Certification Requirements

WARNING
This document is the property of United Technologies Corporation (UTC). You may not possess, use, copy or disclose this document or any
information in it, for any purpose, including without limitation to design, manufacture, or repair parts, or obtain FAA or other government approval
to do so, without UTC’s express written permission. Neither receipt nor possession of this document alone, from any source, constitutes such
permission. Possession, use, copying or disclosure by anyone without UTC’s express written permission is not authorized and may result in
criminal and/or civil liability.

INTRODUCTION

This specification defines process certification requirements as agreed upon by the following
business entities herein referred to as “Member”.

UTC Aerospace Systems – Aircraft UTAS - AS


Systems
UTC Aerospace Systems - Power UTAS -
Control & Sensing Systems PCSS
Pratt & Whitney PW
Pratt & Whitney Canada PWC
Sikorsky SIK
Otis Elevator OE
UTC Climate, Controls and Security CCS
Systems

Each UTC member and their suppliers shall integrate to their respective Quality Management
Systems, the requirement of this specification, which encompasses SAE Aerospace Standard
(AS) 9103, “Variation Management of Key Characteristics”. Where a conflict arises between
AS9103 and UTCQR-09.1, the latter shall take precedence.
In an effort to standardize the use and application of the common quality system
requirements, the SAE AS 9103 paragraph numbering scheme has been used.
For any given section, if the wording “No Additional Requirements” appears, this means only
the requirements of AS9103 apply for that section number or equivalent requirements per
AIAG documents for Commercial members. If additional requirements to the AS9103 section
are required, those requirements shall be noted in the corresponding paragraph
Each Member shall develop procedures which implement the requirements consistent with
this specification both internally and within their respective supply base.
Members reserve the right to flow down additional requirements to satisfy specific customer
and / or business requirements that will apply only to the Member.

Unpublished Work - © UNITED TECHNOLOGIES CORPORATION 2013


This document contains no technical data subject to the EAR or the ITAR
COPIES PRINTED FROM THE ON–LINE SYSTEM ARE CONSIDERED UNCONTROLLED
UNITED TECHNOLOGIES CORPORATION
QUALITY REQUIREMENTS
Number: UTCQR-09.1
Revision: 4
Effective Date: 08/02/13
Page 2 of 7

REVISION SUMMARY
This document has been completely revised. Major changes include:
Document reformatted to align with AS9103 requirements.
Additional requirements added to supplement AS9103 requirements as shown within the
document.

Unpublished Work - © UNITED TECHNOLOGIES CORPORATION 2013


This document contains no technical data subject to the EAR or the ITAR
COPIES PRINTED FROM THE ON–LINE SYSTEM ARE CONSIDERED UNCONTROLLED
UNITED TECHNOLOGIES CORPORATION
QUALITY REQUIREMENTS
Number: UTCQR-09.1
Revision: 4
Effective Date: 08/02/13
Page 3 of 7

TABLE OF CONTENTS
SECTION PAGE
1 SCOPE 4
1.1 Purpose 4
1.2 Convention 4
2 APPLICABLE DOCUMENTS 4
2.1 SAE Publications 4
2.2 ISO Publications 4
2.3 Related Publications 4
3 TERMS AND DEFINITIONS 5
4 GENERAL REQUIREMENTS 5
5 PROCESS MODEL 7
6 NOTES 7
FIGURE 1 PREFERRED MODEL FOR KEY CHARACTERISTIC 7
VARIATION MANAGEMENT
GUIDELINES TO MEETING REQUIREMENTS FOR
APPENDIX A 7
VARIATION MANAGEMENT OF KEY CHARACTERISTICS
APPENDIX B PROCESS CONTROL DOCUMENT EXAMPLE 7

Unpublished Work - © UNITED TECHNOLOGIES CORPORATION 2013


This document contains no technical data subject to the EAR or the ITAR
COPIES PRINTED FROM THE ON–LINE SYSTEM ARE CONSIDERED UNCONTROLLED
UNITED TECHNOLOGIES CORPORATION
QUALITY REQUIREMENTS
Number: UTCQR-09.1
Revision: 4
Effective Date: 08/02/13
Page 4 of 7

1 SCOPE:
All processes inclusive of manufacturing, maintenance, assembly and test are potential
candidates for process control and or certification.
This requirement applies to any product feature, process, or key process input that
influences the ability of Producers to meet or exceed customer variation management
requirements.
Key Characteristics (KCs) include product features and their associated process elements
deemed critical to quality (CTQ) by Members or their suppliers.
It is the responsibility of all Producers and their suppliers to identify KCs in addition to those
flowed down by Member drawing or specification.
1.1 Purpose: No Additional Requirements
1.2 Convention: No Additional Requirements
2 APPLICABLE DOCUMENTS:
Producers may contact their responsible Member for reference material. Member–specific
specifications that are needed shall be requested from the applicable Member’s Procurement
department.
It is the responsibility of the supplier to obtain copies of non Member documents specified by
this UTCQR.
SPECIFICATIONS REFERENCED IN THIS DOCUMENT
Document Title
SAE AS 9103 Variation Management of Key Characteristics
SAE J1739 Potential Failure Modes Effects Analysis (FMEA)
AIAG FMEA Manual Potential Failure Modes Effects Analysis Manual
ASQR-01 Supplier Quality System Requirements
ASQR-20.1 Supplier Sampling Requirements
FORMS REFERENCED
Form Title
ASQR-01 Form 3 Supplier Request for Information
UTCQR Form 2 Process Certification Requirements Assessment Form
2.1 SAE Publications: No Additional Requirements
2.2 ISO Publications: No Additional Requirements
2.3 Related Publications:
Document Title
AIAG APQP MANUAL Advanced Product Quality Planning (APQP)
AIAG PPAP Manual Production Part Approval Process (PPAP)
AIAG SPC Reference Statistical Process Control (SPC)
Manual
AIAG MSA Manual Measurement Systems Analysis (MSA)

Unpublished Work - © UNITED TECHNOLOGIES CORPORATION 2013


This document contains no technical data subject to the EAR or the ITAR
COPIES PRINTED FROM THE ON–LINE SYSTEM ARE CONSIDERED UNCONTROLLED
UNITED TECHNOLOGIES CORPORATION
QUALITY REQUIREMENTS
Number: UTCQR-09.1
Revision: 4
Effective Date: 08/02/13
Page 5 of 7

3 TERMS AND DEFINITIONS:


3.1 Critical Item(CI): No Additional Requirements
3.2 Customer: No Additional Requirements
3.3 Key Characteristic (KC): No Additional Requirements
3.4 Key Characteristic (KC) Owner: No Additional Requirements
3.5 Key Characteristic (KC) Process Owner: No Additional Requirements
3.6 Process Control Document (PCD): No Additional Requirements
3.7 Producer: No Additional Requirements
3.8 Special Cause: No Additional Requirements
3.9 Certified Process: A statistically controlled and capable process as defined by this
document.
3.10 Key Process Input (KPI): Any process element that has a significant effect on KCs (e.g.,
upstream process monitoring of locating datum’s, process parameters, required for
downstream manufacturing processes, measurement variation, set up, tool wear, coolant
concentration, preventive maintenance, temperature, humidity, etc.).
4 GENERAL REQUIREMENTS:
4.1 Process Control and Certification General Requirements
4.1.1 The Producer shall develop and document a process control system in compliance with
the guidelines in AS9103 Appendix A. Alternate process control systems that satisfy the
requirements herein shall be considered acceptable with approval by the Member.
4.1.2 The Producer shall perform and document periodic self−audits of the process control
system and their compliance to the process control plans. Audits shall be completed at
least once every twelve (12) months. More frequent audits may be necessary depending
on the ability of the process / KC to consistently meet the requirements of this document.
Note: Process Certification, Control Systems, and Control Plans that satisfy this
document will be evaluated using UTCQR Form 2 or equivalent.
4.2 KC Variation Management Compliance
4.2.1 Member and supplier - identified KCs used to manufacture or assemble UTC product
shall meet the certification requirements per paragraph 4.4. If this requirement cannot
be met in a delay agreed with the Member, the Producer shall notify the responsible
Member via ASQR-01 Form 3 or equivalent for Commercial Members.
4.3 KC Definition and Process Control Document Compliance
4.3.1 The Producer shall have a methodology for selecting processes and KCs with priority
based on their internal requirements (e.g., high risk areas, quality defects and/or
escapes, poorly performing process capability, etc.).
4.3.2 On all processes used to manufacture/assemble UTC product, the Producer shall
perform a risk assessment to determine the need for KCs and KPIs.

Unpublished Work - © UNITED TECHNOLOGIES CORPORATION 2013


This document contains no technical data subject to the EAR or the ITAR
COPIES PRINTED FROM THE ON–LINE SYSTEM ARE CONSIDERED UNCONTROLLED
UNITED TECHNOLOGIES CORPORATION
QUALITY REQUIREMENTS
Number: UTCQR-09.1
Revision: 4
Effective Date: 08/02/13
Page 6 of 7

4.3.3 The Producer shall use an industry recognized risk assessment methodology such as
Design and/or Process Failure Modes Effects Analysis to define product KCs (reference
SAE J1739, or AIAG FMEA Manual).
4.3.4 All documentation for identified KCs, including Control charts, PCD, MSA, process
control and capability data, and UTCQR Form 2 or equivalent audit results, shall be
maintained and available to the Member upon request.
4.4 Process Certification
4.4.1 To certify a process, the Producer shall:
1. Identify, monitor, control and document identified KCs and KPIs on a PCD.
Note: PCD shall be consistent with AS9103 Appendix B or equivalent method
approved by Commercial Member. PCD shall include a reaction plan to
define actions for nonconforming conditions or out of control situations (e.g.,
contact manufacturing engineering, establish containment, notify customer,
stop process, etc.)
2. Demonstrate process is stable and in statistical control, using appropriate
statistical methods and or appropriate control charts before calculating process
capability.
3. Use a recognized industry method to perform a Measurement Systems Analysis
(MSA) to ensure adequacy of the measurement systems used to control KCs.
4. Use, for variable characteristics, a minimum of 25 consecutive observations over
sufficient time to capture variability associated with piece to piece, set up to set
up, time to time, and lot to lot variation; with no nonconformances and a Cpk
>1.33 achieved. Member companies may require other measures of process
capability other than Cpk (e.g., Cp, Cpu, Cpl, Ppk, Ppl, Ppu).
5. Use, for attribute characteristics, a minimum of 45 consecutive observations over
sufficient time to capture variability associated with, piece to piece, set up to set
up, time to time, and lot to lot variation with no nonconformances detected.
6. Establish inspection frequency in PCD for all member-defined KCs as per ASQR-
20.1, when ASQR-01 is required by Purchase Order.

4.5 No Additional Requirements


4.6 No Additional Requirements
4.7 No Additional Requirements

Unpublished Work - © UNITED TECHNOLOGIES CORPORATION 2013


This document contains no technical data subject to the EAR or the ITAR
COPIES PRINTED FROM THE ON–LINE SYSTEM ARE CONSIDERED UNCONTROLLED
UNITED TECHNOLOGIES CORPORATION
QUALITY REQUIREMENTS
Number: UTCQR-09.1
Revision: 4
Effective Date: 08/02/13
Page 7 of 7

5 PROCESS MODEL: No Additional Requirements


6 NOTES: No Additional Requirements
APPENDIX A: No Additional Requirements
APPENDIX B: No Additional Requirements
FIGURE 1: No Additional Requirements

* * * End of Document * * *

Unpublished Work - © UNITED TECHNOLOGIES CORPORATION 2013


This document contains no technical data subject to the EAR or the ITAR
COPIES PRINTED FROM THE ON–LINE SYSTEM ARE CONSIDERED UNCONTROLLED

You might also like