0% found this document useful (0 votes)
2K views1 page

HSE Inspection Report - 11 Nov 2023

The HSEQ inspection report summarizes an inspection of the Academy of Defence Industries facilities in Al Dirab, Riyadh. The inspection found four issues requiring attention: 1) commercial gas cylinders being used on a roof top instead of industrial cylinders, 2) poor housekeeping and improper storage of materials on a roof, 3) uninsulated wires and sockets being used for power tools, and 4) a grinding machine lacking safeguards and the operator not wearing proper PPE. All issues were categorized as high risk and recommendations were provided to address each issue along with target closure dates.

Uploaded by

noumanqamar61
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views1 page

HSE Inspection Report - 11 Nov 2023

The HSEQ inspection report summarizes an inspection of the Academy of Defence Industries facilities in Al Dirab, Riyadh. The inspection found four issues requiring attention: 1) commercial gas cylinders being used on a roof top instead of industrial cylinders, 2) poor housekeeping and improper storage of materials on a roof, 3) uninsulated wires and sockets being used for power tools, and 4) a grinding machine lacking safeguards and the operator not wearing proper PPE. All issues were categorized as high risk and recommendations were provided to address each issue along with target closure dates.

Uploaded by

noumanqamar61
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

HSEQ INSPECTION REPORT

Client / Project : Academy of Defence Industries (ADI) Site Location Al Dirab, Riyadh

Facilities Manager's Name: Malik Ashfaque Faciltiy Engineer Mohammed Alsubie

Inspection Date: 11-Nov-23 Inspection Carried out By: HSE Officer Muhammad Noman Qamar

Risk Level and Observations Closure Time: Extreme Risk /Red- Immediately or within One Week; High Risk /Peel- within Two Weeks, Moderate Risk/Yellow - within Three Weeks Low/Green - within One Month.

Note:- This report to be discussed, agreed with the Operation Team and communicated to the relevant parties. Follow-up and verification to be done until closure accordingly. Record to be maintained in the site Safety Folder.

Action Taken Target


Sr.# Location Area / Room Observations Images Risk Type Risk Level Recommendations Current status After Rectification Images Remarks
By Date

Building B02B
Statutory Industrial Gas cylinders to be
1 ADI Roof Top. Using commercial gas cylinder for activity HIGH SFCL Team ASAP OPEN
Required. used.

Building B02 Roof Materials to be stored at its


Poor-Housekeeping and improper storage Statutory
2 ADI Top. HIGH designated area and proper SFCL Team ASAP OPEN
of materials. Required.
housekeeping required.

Building B01
Statutory Insulated Wire and Socket to be
3 ADI Second Floor. Power Tools Electricity HIGH SFCL Team ASAP OPEN
Required. placed .

Building B01 Safe Guard for the Grinding


Statutory
4 ADI Second Floor. Power Tools Electricity HIGH Machine required and Proper SFCL Team ASAP OPEN
Required.
PPE'S for the operator required.

You might also like