West Terminal Revised
West Terminal Revised
REV.
DWG.
C
B
- - - "Door Window Schedule" - - -
Lintel
S.No Type Size Cill Height Remark
Platform Edge Platform Edge Platform Edge Platform Edge
1 GD 1800 X 2400 - 2400 Glass Door
10mm drop
LVL ± 00
G PD
ESCALATOR ESCALATOR
PD
10mm drop
PRS Counters
Janitor
1505
X
H.Toilet
2220 X 2400 L.TOILET
Commercial Space
20 Sq. Mtr. G. Toilet UP UP
Toilet
G. Toilet
Wash Janitor
H.Toilet
2800 X 2320
6 SD1 2000 X 2400 - 2400 Fire Rated Steel Door
2500 3380 X 3825 2950 X 3825
Cooler
Water
3675 X 4425 3240 X 4285 2970 X 3700 1700
X
10mm drop
34
10mm drop
10mm drop
34 32 30 28 26 24 22 20 19 16 13 11 09 07 05 04 03 01 01 03 04 05 07 09 11 13 15 19 20 22 24 26 28 30 32 32
6665 X 6185 Prepaid
LVL ± 00 D2 D2
1825 MM Wide Ladies Waiting Room 30 Taxi
1200 mm Wide Plumbing Shaft
10mm drop
10mm drop
L. Toilet W= 2500 W= 2500
Janitor Janitor Counters
Lobby 10mm drop
3275 X 6000 9800 X 11150 1505 X 2500
T = 300 UP UP T = 300 10mm drop
D2 D2 D2 D2
82 Sq. Mtr. 26
6080 X 4810
Luggage Rack at G. Toilet
200 MM 10mm drop
10mm drop
24
4870 X 3255
8 D1 1000 X 2400 - 2400 Flush Door
5500 X 8700 6050 X 7995
Ticket Counters
22
14050 X 2600
10mm drop 10mm drop
UTS Counters
3575 X 5025 UP T = 300 T = 300 UP 3240 X 2315
R = 150 R = 150 V3 V3 V3 V3 V3 V3 V3
09
11 D2 900 X 2400 - 2400 Flush Door
10mm drop
10mm drop
G. Staff Toilet AFC Gates
L. Staff Toilet 2500 X 2000 2500 X 2000
4025 X 3850 FD W= 2500
3375 X 3850 T = 300
IT Room - 1
3000 X 2500 R = 150
F
12 D2A 900 X 2100 - 2100 Glass Door
10mm drop
10mm drop
07
05
30400
04
01
DD 13 D3 750 X 2100 - 2100 FRP Door
LVL ± 00
2.1
1.2
W= 2100
T = 300
Shaft Shaft
D4
3000 X 2130
Battery Room
NIRBHAYA
Help Line
FD
ESCALATOR
UP
15 D5 600 X 1800 - 1800 Duct Door
Passage 4660 X 3400
42600
R = 150 LVL ± 00
UP
UP
SSE TELE 2700 X 3000 OMR / HABD / SSE PF / TXR
43000
13
31 LVL ± 00
Staff Room
5200 X 6500
Catering Inspector
4205 X 6500
CDESM
4360 X 6500
2350 X 2410 DFMD DFMD DFMD DFMD
Office of SM
5005 X 6500
SM Office Room
5000 X 6500
H. Facilitation Center
5000 X 6500
Fire Control Room
4500 X 6500
LVL ± 00
31
13
15
16 - Handicap Toilet Door
34 TI Office
(TELE)
11 4660 X 3400 29 17
Electrical Store 4450 X 3800 Cash Room Charting
09 07 05 03 01 27 25 23 21 19
AFC Gates
3500 X 4100 2975 X 3640 CRS
LVL ± 00 W= 2100
W1 2000 X 1500 900 2400
10mm drop
A UP
Lift
2000 X 2500
(CN)
4600 X 3000
Store (TELE)
4000 X 2400
STORE
2900 X 2500
3650 X 2340
PIS
EMERGENCY
T = 300
R = 150 A 17 Aluminium Window
EMERGENCY KIOSKS
EXIT
D EXIT FORECOURT
18 W1A 2400 X 1500 900 2400 Aluminium Window
DOUBLE HEIGHT AREA DOUBLE HEIGHT AREA Main Gate Departure DOUBLE HEIGHT AREA DOUBLE HEIGHT AREA
4400
SKY WALK
25 V3 600 X 600 1800 2400 Ventilator
3000
FROM
METRO
A CONNECTING
AT CONCOURSE
LEVEL 26 OP 4000 X 2400 - 2400 Opening Area
C
B
28 GL2 2400 X As/Site 600 BOB. Str. Glazing
150000
30000 30000 30000 30000 30000 29 GL3 1200 X As/Site 600 BOB. Str. Glazing
149210
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
Note:- All External Wall Thickness 200 MM. & All Dimension From F.F.L
- - - "Legend" - - -
200mm thk.Solid Block Masonry wall up to Beam/Slab Bottom
Double Skin ply Partition 900 Ht. with Glass up to Beam Bottom
SOUTHERN RAILWAY
- - - "Finishing Schedule" - - - EPC CONTRACTOR :-
Facilities Flooring Skirting Wall Interior Ceiling Wall Exterior DESIGN DIRECTOR :-
(CA/2005/37204)
Office/Ticket Acoustic Ceiling Tile or
Booking Counters
Vitrified Floor Tile 150 High. Vitrified Floor Tile interior Emulsion Paint
Suspend Ceiling M/s .Bridge and Roof Company
Arrival or Departure 40 mm Thik. Flame cut
150 High. Granite
20 mm Thik. Polish Granite Cladding upto Putty with Paint Finish/Acoustic (India) Limited.
Lobby/Corridor Granite with Pattern/Motif 1800 mm High & AboveEmulsion Paint Ceiling Spray/Suspended Ceiling Exterior Wall Cladding
Office/RCT/ with Stone/ Granite Tile,
Vitrified Floor Tile 150 High. Vitrified Floor Tile interior Emulsion Paint Putty with Paint Finish Exterior Glass Facade EPC ARCHITECT:-
Restrooms
with DGU, Exterior EPC CONTRACTOR :-
Electrical Room
Cement Flooring interior Emulsion Paint Fair Face Concrete Emulsion Paint
& AHU Room
Smooth or Texture Paint C.P.& D.S. ASSOCIATES,
Staircase Steps & Plain cut Granite 20 mm Thik. Polish Granite on Riser
150 High. Granite Putty with Paint Finish (An ISO 9001-2008 Certified Company)
Landings 40 mm Thik. & Dado (Wherever Required) ARCHITECTS ENGINEERS,INTERIORS,P.M.C.
Toilet Area Metal Ceiling (600 X 600)
20 mm Thik. Honed Granite 600 X 300 Ceramic tile upto False Ceiling
& Water Proof Gypsum PROJECT TITLE:-
UDAY
A NA
GAR
ROAD
PROPOSED STP
NTS(A0) 2216
SALIM
TANK
AC
BUILDING AC TANK
TRANSFORMER
STOCK YARD
THENPARAMBIL ROAD
BUILDING
RCC TANK
IOC
RCC
RCC
N S DRAWING TITLE:-
OF GCDA - ONLY PARKING AND
ROAD
RCC
AC BUILDING
RCC RCC
CANTEEN
CIRCULATION FACILITIES PROPOSED
AC SHED RCC
STORE SHED
LAND PARCEL-3
AC SHED
= 0.62ACRES(2509 SQM)
AC SHED
KARITHALA
AC WORK RCC
SHOP IOC COMPOUND
AC SHED
PARKING- 82 CARS
3
RCC
G
+1 ACTOILET
ACSHED
EXISTING GCDA BLDG.
10
ACWORK
SHOP
ACSHED
DRAIN
AC WORK
SHOP
PLATFORM-6
PLATFORM-6
RCC+1
EXISTING 5M WIDE ROAD AUDITORIUM
G+1
ACSHED
ACWORK RCCBL
SHOP ACSHED TANK
RCCG
TANK
PROPOSED
TANK ROAD 9.0
m WIDE
742
PIPE
LINE
AERA
PRO. TOTAL LENGTH 605 m(26 COACH + 1 ENGINE)
PLATFORM-4 & 5
PRO. TOTAL LENGTH 605 m(26 COACH + 1 ENGINE)
PLATFORM-4 & 5
2
2 WHEELER
16
PARKING
16
PLATFORM-1
PLATFORM-1
1 PROPOSED ROAD 7.0 m WIDE
9 8
METRO
LINEN ROOM EXISTING: LANDSCAPE AREA
PARCEL OFFICE RMS BUILDING
=486.10 Sqm GF -522.40 Sqm) RRI CABIN/ SIGNALLING
TANK
DROP OFF AREA DROP OFF AREA PICK UP AREA
18
124
6
PROPOSED ROAD 5 m WIDE
KSRTC 7
BUILDING UNDER
RUNNING ROOM
7 PICK UP
CROSSING
ROAD
GARAGE
TOWER 1
15 5
17 4
W
RUNNING ROOM (GENTS)
4 UNITS
TYPE - IV 129 A-F
UP
RAMP
BU ROAD
KALATHIPARAM
OF
ROAD
KALATHIP ARAMBIL
ON
JUNCTI
C
B
Platform Edge Platform Edge Platform Edge Platform Edge
W= 2500 W= 2500
3725 X 9650 3675 X 9650 T = 300 UP PAID CONCOURSE DOUBLE HEIGHT UP T = 300
5845 X 7100
28
CCRC Room - 2
L. Toilet
LVL + 5100 R = 150 R = 150 3400 X 5930
CI Office 3880 X 4180
10mm drop
26 G. Toilet
3600 X 3500 D2
For 4870 X 3330
Male
24
22
Janitor 6 SD1 2000 X 2400 - 2400 Fire Rated Steel Door
Luggage Rack at
Detention Center 01 03 04 05 07 09 11 13 16 19 20 22 24 26 28 30 32 34 34 32 30 28 26 24 22 20 19 16 13 11 09 07 05 04 03 01
19 FD V3 V3 1200 mm Wide Duct
3600 X 3500 Bomb Squad
D1 5845 X 6500 DN
10mm drop
Storage
2220 X 1450 CCRC Store
2625 X 1875 11
10mm drop 6850 X 4770
VOID
10mm drop
10mm drop
Jail
3600 X 3120
D1
Lift
2500 X 2000
Lift
2500 X 2000
09
CCRC Room - 1 9 D1A 1500 X 2400 - 2400 Flush Door
G. Staff Toilet H.Toilet FD W= 2500 3400 X 4500
Jail
2625 X 1875 2220 X 2400 IT Room - 1 T = 300
3075 X 2400 DD1
GD1 3000 X 2500 R = 150
Storage
F
DD1 DD1
07 10 D1B 1000 X 2100 - 2100 Glass Door
05
30400
04
01 D1
11 D2 900 X 2400 - 2400 Flush Door
LVL + 5100 LVL + 5100 LVL + 5100
PD
LVL + 5100
12 D2A 900 X 2100 - 2100 Glass Door
GD D4 GD DD1 DD1
D1 CLI Room
E F.H.C
RECORDS
STORAGE
RECORDS
RECORDS
RECORDS
STORAGE
STORAGE
STORAGE
ELE. 7350 X 9295
Shaft Shaft FD
13 D3 750 X 2100 - 2100 FRP Door
KIOSK
W= 2100
KIOSK
BATTERY/UPS UP
T = 300 RECORDS
OBHS
ROOM
STORAGE
42600
R = 150
14750 X 6600 LVL + 5100
43000
19 21 23 25 27 Electrical 01 03 05 07 09
RECORDS
STORAGE
3100 X 3200 G. Toilet
17 29
Lift Room 3000 X 3355 Crew Waiting & 11
2000 X 2500 TTE Lobby Ladies D1 Lobby (AC) 34
14 D4 800 X 1800 - 1800 Fire/Shaft Duct Door
RECORDS
RECORDS
RECORDS
STORAGE
STORAGE
STORAGE
LVL + 5100
4600 X 3400 VOID
D2 Commercial
15 31 IT ROOM - 2 6730 X 6500 TTE Lobby Gents CCRC Office 6295 X 6600 13
293.49 Sq. Mtr.
10mm drop
RECORDS
RECORDS
RECORDS
STORAGE
STORAGE
STORAGE
34 Security 4600 X 6600 RECORDS
STORAGE
11 Surveillance CMS 29 17
Electrical Store 4200 X 3230
09 07 05 03 01
LVL + 5100
Lift (CN)
4600 X 3000
3525 X 6500 SERVER ROOM
3100 X 3200 L. Toilet
CCRC Room
4200 X 3230
27 25 23 21 19
W= 2100
T = 300
15 D5 600 X 1800 - 1800 Duct Door
A UP 2000 X 2500 3000 X 3355 R = 150 A
RECORDS
RECORDS
RECORDS
STORAGE
STORAGE
STORAGE
D2
D 10mm drop
A
FROM
METRO
24 V2A 1200 X 1500 900 2400 Ventilator
CONNECTING
AT CONCOURSE
LEVEL
25 V3 600 X 600 1800 2400 Ventilator
C
B
27 GL1 2400 X As/Site 600 BOB. Str. Glazing
- - - "Legend" - - -
200mm thk.Solid Block Masonry wall up to Beam/Slab Bottom
Double Skin ply Partition 900 Ht. with Glass up to Beam Bottom
SOUTHERN RAILWAY
- - - "Finishing Schedule" - - - EPC CONTRACTOR :-
Facilities Flooring Skirting Wall Interior Ceiling Wall Exterior DESIGN DIRECTOR :-
(CA/2005/37204)
Office/Ticket Acoustic Ceiling Tile or
Booking Counters
Vitrified Floor Tile 150 High. Vitrified Floor Tile interior Emulsion Paint
Suspend Ceiling M/s .Bridge and Roof Company
Arrival or Departure 40 mm Thik. Flame cut
150 High. Granite
20 mm Thik. Polish Granite Cladding upto Putty with Paint Finish/Acoustic (India) Limited.
Lobby/Corridor Granite with Pattern/Motif 1800 mm High & AboveEmulsion Paint Ceiling Spray/Suspended Ceiling Exterior Wall Cladding
Office/RCT/ with Stone/ Granite Tile,
Vitrified Floor Tile 150 High. Vitrified Floor Tile interior Emulsion Paint Putty with Paint Finish Exterior Glass Facade EPC ARCHITECT:-
Restrooms
with DGU, Exterior EPC CONTRACTOR :-
Electrical Room
Cement Flooring interior Emulsion Paint Fair Face Concrete Emulsion Paint
& AHU Room
Smooth or Texture Paint C.P.& D.S. ASSOCIATES,
Staircase Steps & Plain cut Granite 20 mm Thik. Polish Granite on Riser
150 High. Granite Putty with Paint Finish (An ISO 9001-2008 Certified Company)
Landings 40 mm Thik. & Dado (Wherever Required) ARCHITECTS ENGINEERS,INTERIORS,P.M.C.
Toilet Area Metal Ceiling (600 X 600)
20 mm Thik. Honed Granite 600 X 300 Ceramic tile upto False Ceiling
& Water Proof Gypsum PROJECT TITLE:-
UDAY
A NA
GAR
ROAD
PROPOSED STP
NTS(A0) 2216
SALIM
TANK
AC
BUILDING AC TANK
TRANSFORMER
STOCK YARD
THENPARAMBIL ROAD
BUILDING
RCC TANK
IOC
RCC
RCC
N S DRAWING TITLE:-
OF GCDA - ONLY PARKING AND
ROAD
RCC
AC BUILDING
RCC RCC
CANTEEN
CIRCULATION FACILITIES PROPOSED
AC SHED RCC
STORE SHED
LAND PARCEL-3
AC SHED
= 0.62ACRES(2509 SQM)
AC SHED
KARITHALA
AC WORK RCC
SHOP IOC COMPOUND
AC SHED
PARKING- 82 CARS
3
RCC
G
+1 ACTOILET
ACSHED
EXISTING GCDA BLDG.
10
ACWORK
SHOP
ACSHED
DRAIN
AC WORK
SHOP
PLATFORM-6
PLATFORM-6
RCC+1
EXISTING 5M WIDE ROAD AUDITORIUM
G+1
ACSHED
ACWORK RCCBL
SHOP ACSHED TANK
RCCG
TANK
PROPOSED
TANK ROAD 9.0
m WIDE
742
PIPE
LINE
AERA
PRO. TOTAL LENGTH 605 m(26 COACH + 1 ENGINE)
PLATFORM-4 & 5
PRO. TOTAL LENGTH 605 m(26 COACH + 1 ENGINE)
PLATFORM-4 & 5
2
2 WHEELER
16
PARKING
16
PLATFORM-1
PLATFORM-1
1 PROPOSED ROAD 7.0 m WIDE
9 8
METRO
LINEN ROOM EXISTING: LANDSCAPE AREA
PARCEL OFFICE RMS BUILDING
=486.10 Sqm GF -522.40 Sqm) RRI CABIN/ SIGNALLING
TANK
DROP OFF AREA DROP OFF AREA PICK UP AREA
18
124
6
PROPOSED ROAD 5 m WIDE
KSRTC 7
BUILDING UNDER
RUNNING ROOM
7 PICK UP
CROSSING
ROAD
GARAGE
TOWER 1
15 5
17 4
W
RUNNING ROOM (GENTS)
4 UNITS
TYPE - IV 129 A-F
UP
RAMP
BU ROAD
KALATHIPARAM
OF
ROAD
KALATHIP ARAMBIL
ON
JUNCTI
C
B
Platform Edge Platform Edge Platform Edge Platform Edge
Platform - 01
GL3 GL3 GL3 GL3 GL2 GL2 GL2 GL1 GL2 GL2 GL2 GL2 GL2 GL2 GL2 GL2 GL2 GL2 GL2 GL2 GL1 GL2 GL2 GL2 GL3 GL3 GL3 GL3
1 GD 1800 X 2400 - 2400 Glass Door
G PD PD
Cooler
Water
2400 X 2950
G. Toilet
3725 X 9650
L.TOILET
3675 X 9650 34 32 30 28 26 24 22 20 19 16 13 11 09 07 05 04 03 01 01 03 04 05 07 09 11 13 15 19 20 22 24 26 28 30 32
34
W= 2500 W= 2500
T = 300 UP UP T = 300
LVL + 14700 R = 150 R = 150
28
G. Toilet
L. Toilet
3880 X 4180 4 DD2 1500 X 2400 - 2400 AL. Door
10mm drop
26
4870 X 4180 D2
24
Janitor
22
Luggage Rack at
20
COMMERCIAL
COMMERCIAL W= 2500 W= 2500
UP T = 300 T = 300 UP D6
Luggage Rack at
R = 150 R = 150 V3 V3 V3 V3 V3 V3
200 MM
01 03 04 05 07 09 11 13 16 19 20 22 24 26 28 30 32 34 34 32 30 28 26 24 22 20 19 16 13 11 09 07 05 04 03 01
19 FD V3 V3 1200 mm Wide Duct 6 SD1 2000 X 2400 - 2400 Fire Rated Steel Door
DN
Lift Lift
10mm drop
10mm drop
L. Staff Toilet
Janitor
2220 X 1450 Feeding Room COMMERCIAL
13
Lift
2000 X 2500
Lift
2000 X 2500 7 SD 1200 X 2400 - 2400 Fire Rated Steel Door
2625 X 1875 COMMERCIAL
Cum Baby Care 11
10mm drop
VOID
Baby Care - Ladies
10mm drop
3275 X 4950 09 4795 X 4770
Lift Lift
G. Staff Toilet
10mm drop
H.Toilet FD
2500 X 2000 2500 X 2000 IT Room - 1
3000 X 2500 W= 2500
8 D1 1000 X 2400 - 2400 Flush Door
2625 X 1875 2220 X 2400 T = 300
R = 150
F
07
9 D1A 1500 X 2400 - 2400 Flush Door
05
30400
04
01
10 D1B 1000 X 2100 - 2100 Glass Door
LVL + 14700 LVL + 14700
E F.H.C
W= 2100
Shaft
ELE.
Shaft IT Room - 2 FD
UP
12 D2A 900 X 2100 - 2100 Glass Door
T = 300 2500 X 3000
42600
19 21 23 25 27 Electrical 01 03 05 07 09
17
15
29
31 LVL + 14700
Lift
2000 X 2500
Room
4600 X 3400
VOID
COMMERCIAL
34
11
13
13 D3 750 X 2100 - 2100 FRP Door
13 31 15
34
11
09 07 05 03 01
LVL + 14700
Electrical Store
29
27 25 23 21 19
17
W= 2100
14 D4 800 X 1800 - 1800 Fire/Shaft Duct Door
Lift (CN)
4600 X 3000 T = 300
UP 2000 X 2500 R = 150
LVL + 14700
LVL + 14700 19 W2 1800 X 1500 900 2400 Aluminium Window
LVL + 14700 Open Terrace
Open Terrace
Open Terrace
20 W3 1500 X 1500 900 2400 Aluminium Window
Open Terrace
C
B
27 GL1 2400 X As/Site 600 BOB. Str. Glazing
149210
28 GL2 2400 X As/Site 600 BOB. Str. Glazing
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
29 GL3 1200 X As/Site 600 BOB. Str. Glazing
Third Floor Plan Note:- All External Wall Thickness 200 MM. & All Dimension From F.F.L
- - - "Legend" - - -
200mm thk.Solid Block Masonry wall up to Beam/Slab Bottom
Double Skin ply Partition 900 Ht. with Glass up to Beam Bottom
SOUTHERN RAILWAY
- - - "Finishing Schedule" - - - EPC CONTRACTOR :-
Facilities Flooring Skirting Wall Interior Ceiling Wall Exterior DESIGN DIRECTOR :-
(CA/2005/37204)
Office/Ticket Acoustic Ceiling Tile or
Booking Counters
Vitrified Floor Tile 150 High. Vitrified Floor Tile interior Emulsion Paint
Suspend Ceiling M/s .Bridge and Roof Company
Arrival or Departure 40 mm Thik. Flame cut
150 High. Granite
20 mm Thik. Polish Granite Cladding upto Putty with Paint Finish/Acoustic (India) Limited.
Lobby/Corridor Granite with Pattern/Motif 1800 mm High & AboveEmulsion Paint Ceiling Spray/Suspended Ceiling Exterior Wall Cladding
Office/RCT/ with Stone/ Granite Tile,
Vitrified Floor Tile 150 High. Vitrified Floor Tile interior Emulsion Paint Putty with Paint Finish Exterior Glass Facade EPC ARCHITECT:-
Restrooms
with DGU, Exterior EPC CONTRACTOR :-
Electrical Room
Cement Flooring interior Emulsion Paint Fair Face Concrete Emulsion Paint
& AHU Room
Smooth or Texture Paint C.P.& D.S. ASSOCIATES,
Staircase Steps & Plain cut Granite 20 mm Thik. Polish Granite on Riser
150 High. Granite Putty with Paint Finish (An ISO 9001-2008 Certified Company)
Landings 40 mm Thik. & Dado (Wherever Required) ARCHITECTS ENGINEERS,INTERIORS,P.M.C.
Toilet Area Metal Ceiling (600 X 600)
20 mm Thik. Honed Granite 600 X 300 Ceramic tile upto False Ceiling
& Water Proof Gypsum PROJECT TITLE:-
UDAY
A NA
GAR
ROAD
PROPOSED STP
NTS(A0) 2216
SALIM
TANK
AC
BUILDING AC TANK
TRANSFORMER
STOCK YARD
THENPARAMBIL ROAD
BUILDING
RCC TANK
IOC
RCC
RCC
N S DRAWING TITLE:-
OF GCDA - ONLY PARKING AND
ROAD
RCC
AC BUILDING
RCC RCC
CANTEEN
CIRCULATION FACILITIES PROPOSED
AC SHED RCC
STORE SHED
LAND PARCEL-3
AC SHED
= 0.62ACRES(2509 SQM)
AC SHED
KARITHALA
AC WORK RCC
SHOP IOC COMPOUND
AC SHED
PARKING- 82 CARS
3
RCC
G
+1 ACTOILET
ACSHED
EXISTING GCDA BLDG.
10
ACWORK
SHOP
ACSHED
DRAIN
AC WORK
SHOP
PLATFORM-6
PLATFORM-6
RCC+1
EXISTING 5M WIDE ROAD AUDITORIUM
G+1
ACSHED
ACWORK RCCBL
SHOP ACSHED TANK
RCCG
TANK
PROPOSED
TANK ROAD 9.0
m WIDE
742
PIPE
LINE
AERA
PRO. TOTAL LENGTH 605 m(26 COACH + 1 ENGINE)
PLATFORM-4 & 5
PRO. TOTAL LENGTH 605 m(26 COACH + 1 ENGINE)
PLATFORM-4 & 5
2
2 WHEELER
16
PARKING
16
PLATFORM-1
PLATFORM-1
1 PROPOSED ROAD 7.0 m WIDE
9 8
METRO
LINEN ROOM EXISTING: LANDSCAPE AREA
PARCEL OFFICE RMS BUILDING
=486.10 Sqm GF -522.40 Sqm) RRI CABIN/ SIGNALLING
TANK
DROP OFF AREA DROP OFF AREA PICK UP AREA
18
124
6
PROPOSED ROAD 5 m WIDE
KSRTC 7
BUILDING UNDER
RUNNING ROOM
7 PICK UP
CROSSING
ROAD
GARAGE
TOWER 1
15 5
17 4
W
RUNNING ROOM (GENTS)
4 UNITS
TYPE - IV 129 A-F
UP
RAMP
BU ROAD
KALATHIPARAM
OF
ROAD
KALATHIP ARAMBIL
ON
JUNCTI
C
B
Platform Edge Platform Edge Platform Edge Platform Edge
CONCOURSE - 1 CONCOURSE - 2
LVL + 9600
Platform - 01
LVL + 9600
- - - "Door Window Schedule" - - -
5000 mm Wide Cantilevered Passage LVL + 9600
5000 mm Wide Cantilevered Passage
Lintel
S.No Type Size Cill Height Remark
G
DD1
Cooler
Water
3675 X 5625 8.6 Sq. Mtr.
2400 X 2950
34
10mm drop
L. Toilet L. Toilet
Cooler
Water
10mm drop
10mm drop
10mm drop
L. Toilet W= 2500 W= 2500
10mm drop
Cooler
Water
10mm drop
D2 D2 D2 26
D2 Baby Care 10mm drop 4870 X 4180 D2
10830 X 13700
10mm drop
10mm drop 10mm drop
10mm drop
LVL + 9600
1945 X 3100 24
4 DD2 1500 X 2400 - 2400 AL. Door
10mm drop
G. Staff Toilet
Feeding Room
Cum Baby Care Lift Lift
VOID
IT Room - 1
3000 X 2500
09 4795 X 4770
7 SD 1200 X 2400 - 2400 Fire Rated Steel Door
L. Staff Toilet 3275 X 3800 2500 X 2000 2500 X 2000
4025 X 3850 FD W= 2500
3375 X 3850 T = 300
R = 150
F 8 D1 1000 X 2400 - 2400 Flush Door
10mm drop
10mm drop
07
05
30400
04
F.H.C ELE. D2 D2
Shaft Shaft FD
W= 2100 UP
T = 300
R = 150
42600
LVL + 9600 01
43000
19 21 23 25 27 Electrical 03 05 07 09
17 29
Lift
2000 X 2500
Room
4600 X 3400 VOID
1st Class Waiting (L)
L. Toilet
3875 X 6900
Toilet
3950 X 6900 1st Class Waiting (General) (AC) 34
11
12 D2A 900 X 2100 - 2100 Glass Door
15 31 LVL + 9600 IT ROOM - 2 (AC) 33320 X 6500 Commercial Commercial Commercial 13
Cloak Room
6725 X 6500 4315 X 6900 8330 X 6500 62.18 Sq. Mtr. 36.11 Sq. Mtr. 99.21 Sq. Mtr.
13 31 15
34
AFC Gates AFC Gates
11
09 07 05 03 01 Electrical Store
Departure Arrival 29
27 25 23 21 19
17
13 D3 750 X 2100 - 2100 FRP Door
LVL + 9600 (CN) W= 2100
Lift
4600 X 3000 T = 300
A UP 2000 X 2500 R = 150 A
D 14 D4 800 X 1800 - 1800 Fire/Shaft Duct Door
GL3 GL3
15 D5 600 X 1800 - 1800 Duct Door
C
B
26 OP 4000 X 2400 - 2400 Opening Area
149210
27 GL1 2400 X As/Site 600 BOB. Str. Glazing
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
Note:- All External Wall Thickness 200 MM. & All Dimension From F.F.L
- - - "Legend" - - -
200mm thk.Solid Block Masonry wall up to Beam/Slab Bottom
Double Skin ply Partition 900 Ht. with Glass up to Beam Bottom
SOUTHERN RAILWAY
- - - "Finishing Schedule" - - - EPC CONTRACTOR :-
Facilities Flooring Skirting Wall Interior Ceiling Wall Exterior DESIGN DIRECTOR :-
(CA/2005/37204)
Office/Ticket Acoustic Ceiling Tile or
Booking Counters
Vitrified Floor Tile 150 High. Vitrified Floor Tile interior Emulsion Paint
Suspend Ceiling M/s .Bridge and Roof Company
Arrival or Departure 40 mm Thik. Flame cut
150 High. Granite
20 mm Thik. Polish Granite Cladding upto Putty with Paint Finish/Acoustic (India) Limited.
Lobby/Corridor Granite with Pattern/Motif 1800 mm High & AboveEmulsion Paint Ceiling Spray/Suspended Ceiling Exterior Wall Cladding
Office/RCT/ with Stone/ Granite Tile,
Vitrified Floor Tile 150 High. Vitrified Floor Tile interior Emulsion Paint Putty with Paint Finish Exterior Glass Facade EPC ARCHITECT:-
Restrooms
with DGU, Exterior EPC CONTRACTOR :-
Electrical Room
Cement Flooring interior Emulsion Paint Fair Face Concrete Emulsion Paint
& AHU Room
Smooth or Texture Paint C.P.& D.S. ASSOCIATES,
Staircase Steps & Plain cut Granite 20 mm Thik. Polish Granite on Riser
150 High. Granite Putty with Paint Finish (An ISO 9001-2008 Certified Company)
Landings 40 mm Thik. & Dado (Wherever Required) ARCHITECTS ENGINEERS,INTERIORS,P.M.C.
Toilet Area Metal Ceiling (600 X 600)
20 mm Thik. Honed Granite 600 X 300 Ceramic tile upto False Ceiling
& Water Proof Gypsum PROJECT TITLE:-
UDAY
A NAGA
R RO
NTS(A0)
AD
PROPOSED STP
2216
SALIM
AD
UD
AY
A
NA
GA
R
RO
TANK
AC
BUILDING AC TANK
TRANSFORMER
STOCK YARD
THENPARAMBIL ROAD
BUILDING
RCC TANK
IOC
RCC
RCC
N S DRAWING TITLE:-
OF GCDA - ONLY PARKING AND
ROAD
RCC
AC BUILDING
RCC RCC
CANTEEN
CIRCULATION FACILITIES PROPOSED
LAND PARCEL-3
AC SHED RCC
STORE SHED
AC SHED
AC SHED
= 0.62ACRES(2509 SQM)
KARITHALA
AC WORK RCC
SHOP IOC COMPOUND
AC SHED
PARKING- 82 CARS
3
RCC
G
+1 ACTOILET
ACSHED
EXISTING GCDA BLDG.
ACWORK
SHOP
ACSHED
AC WORK
SHOP
DRAIN
PLATFORM-6
10
PLATFORM-6
RCC+1
EXISTING 5M WIDE ROAD AUDITORIUM
G+1
ACSHED
AC
WORK RCCBL
SHOP ACSHED TANK
RCCG
PROPOSED
TANK
TANK
ROAD 9.0
m WIDE
742
PIPE
LINE
AERA
PRO. TOTAL LENGTH 605 m(26 COACH + 1 ENGINE)
PLATFORM-4 & 5
PRO. TOTAL LENGTH 605 m(26 COACH + 1 ENGINE)
PLATFORM-4 & 5
2
2 WHEELER
16PARKING
16
2
PRO. TOTAL LENGTH 605 m(26 COACH + 1 ENGINE)
PLATFORM-2 & 3
PRO. TOTAL LENGTH 605 m(26 COACH + 1 ENGINE)
AC
SHED
PLATFORM-1
PLATFORM-1
1 PROPOSED ROAD 7.0 m WIDE
9 8
METRO
LINEN ROOM EXISTING: LANDSCAPE AREA
PARCEL OFFICE RMS BUILDING
=486.10 Sqm GF -522.40 Sqm) RRI CABIN/ SIGNALLING
ROAD 7.0
12 UNITS TYPE I 131 A-L TYPE I 134 A-L
TANK G+2 (12x42=504 Sqm) 12 UNITS 6 UNITS 4 UNITS 12 UNITS 12 UNITS
G+2 (12x42=504 Sqm) G+2(6x62=372 Sqm) G+1(4x62=248 Sqm) TAX
ENTRY EXIT
PROPOSED
G+2(12x42=504 Sqm) G+2(12x42=504 Sqm) GF (4 x 30 = 120 Sqm)
TYPE - IV
TANK
DROP OFF AREA DROP OFF AREA PICK UP AREA
18
124
6
PEDESTRIAN
PROPOSED ROAD 5 m WIDE
BUILDING UNDER
CROSSING
CONSTRUCTION AREA MANAGER'S OFFICE
TOWER 2 POINT LADIES
GARAGE
TOWER 1
15 5
4
W
TYPE III 108 A-D TYPE III 111 A-D
TYPE II
113 A-D TYPE II 114 A-D TYPE II 115 A-D
17 TOURIST BUS BAY
RUNNING ROOM (GENTS)
4 UNITS 4 UNITS
4 UNITS 4 UNITS 4 UNITS 4 UNITS G+1(4 x 60=240 Sqm) G+1(4x60=240 Sqm)
G+1(4x60=240 Sqm) MLCP- G+5
13 16
G+1 (4 x 68 = 272 Sqm) G+1 (4 x 68 = 272 Sqm) G+1 (4 x 68 = 272 Sqm) G+1 (4 x 68 = 272 Sqm)
MAHAKAVI G
RAMP UP
BU ROAD
KALATHIPARAM
OF
KALATHIP ARAMBIL ROAD
CTION
S JUN
B
BABY CARE & FEEDING
8830x5500
C
Platform Edge Platform Edge Platform Edge Platform Edge
Platform - 01
Cooler
Water
S.H S.H
2400 X 2950
34
D2
10mm drop
D2
3 DD1 2000 X 2400 - 2400 AL. Door
G. Toilet L.TOILET 30
1200 mm Wide Plumbing Shaft
W= 2500 W= 2500
3725 X 9650 3675 X 9650 T = 300 UP UP T = 300 28 L. Toilet
R = 150 R = 150
G. Toilet 3880 X 4180
4 DD2 1500 X 2400 - 2400 AL. Door
10mm drop
26
4870 X 4180 D2
24
Janitor
22
Luggage Rack at
2000 X 2250
20400 x 13700
W= 2500 W= 2500 Open Terrace LVL + 19200
UP T = 300 T = 300 UP D6
Luggage Rack at
R = 150 R = 150 V3 V3 V3 V3 V3 V3
200 MM
01 03 04 05 07 09 11 13 16 19 20 22 24 26 28 30 32 34 34 32 30 28 26 24 22 20 19 16 13 11 09 07 05 04 03 01
19 FD V3 V3 1200 mm Wide Duct
6 SD1 2000 X 2400 - 2400 Fire Rated Steel Door
DN
Lift Lift
10mm drop
10mm drop
VOID
Office
10mm drop
09 4795 X 4770
Lift Lift
D1 1000 X 2400 - 2400 Flush Door
10mm drop
G. Staff Toilet
H.Toilet FD
2500 X 2000 2500 X 2000
W= 2500 8
2625 X 1875 2220 X 2400 IT Room - 1 T = 300
3000 X 2500 R = 150
F
DD1 DD1 DD1 DD1
07
9 D1A 1500 X 2400 - 2400 Flush Door
05
30400
04
PD
11 D2 900 X 2400 - 2400 Flush Door
DD1 D4 DD1 DD1 DD1 DD1 DD1 DD1 DD1 DD1 DD1
E F.H.C ELE. D2
12 D2A 900 X 2100 - 2100 Glass Door
Shaft Shaft FD
W= 2100 IT Room - 2
DN
T = 300 2500 X 3000
R = 150 L.TOILET
42600
LVL + 19200
43000
Electrical 01 03 05 07 09
17
19 21 23 25 27
29
Lift
2000 X 2500
Room VOID
3300 X 6120
34
11 13 D3 750 X 2100 - 2100 FRP Door
4600 X 3400 S.H
15 31 LVL + 19200 13
TTE REST ROOMS FOR
13 LADIES- 16 BEDS 31 15
11
34
L.TOILET
D2
3300 X 4700
S.H
16 HD 1200 X 2400 - 2400 Handicap Toilet Door
LVL + 14700
19 W2 1800 X 1500 900 2400 Aluminium Window
LVL + 14700
B
27 GL1 2400 X As/Site 600 BOB. Str. Glazing
C
28 GL2 2400 X As/Site 600 BOB. Str. Glazing
- - - "Legend" - - -
200mm thk.Solid Block Masonry wall up to Beam/Slab Bottom
Double Skin ply Partition 900 Ht. with Glass up to Beam Bottom
SOUTHERN RAILWAY
- - - "Finishing Schedule" - - - EPC CONTRACTOR :-
Facilities Flooring Skirting Wall Interior Ceiling Wall Exterior DESIGN DIRECTOR :-
(CA/2005/37204)
Office/Ticket Acoustic Ceiling Tile or
Booking Counters
Vitrified Floor Tile 150 High. Vitrified Floor Tile interior Emulsion Paint
Suspend Ceiling M/s .Bridge and Roof Company
Arrival or Departure 40 mm Thik. Flame cut
150 High. Granite
20 mm Thik. Polish Granite Cladding upto Putty with Paint Finish/Acoustic (India) Limited.
Lobby/Corridor Granite with Pattern/Motif 1800 mm High & AboveEmulsion Paint Ceiling Spray/Suspended Ceiling Exterior Wall Cladding
Office/RCT/ with Stone/ Granite Tile,
Vitrified Floor Tile 150 High. Vitrified Floor Tile interior Emulsion Paint Putty with Paint Finish Exterior Glass Facade EPC ARCHITECT:-
Restrooms
with DGU, Exterior EPC CONTRACTOR :-
Electrical Room
Cement Flooring interior Emulsion Paint Fair Face Concrete Emulsion Paint
& AHU Room
Smooth or Texture Paint C.P.& D.S. ASSOCIATES,
Staircase Steps & Plain cut Granite 20 mm Thik. Polish Granite on Riser
150 High. Granite Putty with Paint Finish (An ISO 9001-2008 Certified Company)
Landings 40 mm Thik. & Dado (Wherever Required) ARCHITECTS ENGINEERS,INTERIORS,P.M.C.
Toilet Area Metal Ceiling (600 X 600)
20 mm Thik. Honed Granite 600 X 300 Ceramic tile upto False Ceiling
& Water Proof Gypsum PROJECT TITLE:-
UDAY
A NA
GAR
ROAD
PROPOSED STP
NTS(A0) 2216
SALIM
TANK
AC
BUILDING AC TANK
TRANSFORMER
STOCK YARD
THENPARAMBIL ROAD
BUILDING
RCC TANK
IOC
RCC
RCC
N S DRAWING TITLE:-
OF GCDA - ONLY PARKING AND
ROAD
RCC
AC BUILDING
RCC RCC
CANTEEN
CIRCULATION FACILITIES PROPOSED
AC SHED RCC
STORE SHED
LAND PARCEL-3
AC SHED
= 0.62ACRES(2509 SQM)
AC SHED
KARITHALA
AC WORK RCC
SHOP IOC COMPOUND
AC SHED
PARKING- 82 CARS
3
RCC
G
+1 ACTOILET
ACSHED
EXISTING GCDA BLDG.
10
ACWORK
SHOP
ACSHED
DRAIN
AC WORK
SHOP
PLATFORM-6
PLATFORM-6
RCC+1
EXISTING 5M WIDE ROAD AUDITORIUM
G+1
ACSHED
ACWORK RCCBL
SHOP ACSHED TANK
RCCG
TANK
PROPOSED
TANK ROAD 9.0
m WIDE
742
PIPE
LINE
AERA
PRO. TOTAL LENGTH 605 m(26 COACH + 1 ENGINE)
PLATFORM-4 & 5
PRO. TOTAL LENGTH 605 m(26 COACH + 1 ENGINE)
PLATFORM-4 & 5
2
2 WHEELER
16
PARKING
16
PLATFORM-1
PLATFORM-1
1 PROPOSED ROAD 7.0 m WIDE
9 8
METRO
LINEN ROOM EXISTING: LANDSCAPE AREA
PARCEL OFFICE RMS BUILDING
=486.10 Sqm GF -522.40 Sqm) RRI CABIN/ SIGNALLING
TANK
DROP OFF AREA DROP OFF AREA PICK UP AREA
18
124
6
PROPOSED ROAD 5 m WIDE
KSRTC 7
BUILDING UNDER
RUNNING ROOM
7 PICK UP
CROSSING
ROAD
GARAGE
TOWER 1
15 5
17 4
W
RUNNING ROOM (GENTS)
4 UNITS
TYPE - IV 129 A-F
UP
RAMP
BU ROAD
KALATHIPARAM
OF
ROAD
KALATHIP ARAMBIL
ON
JUNCTI
42600 42600
4 DD2 1500 X 2400 - 2400 AL. Door
43000 43000
9000 30400
Truss As per
Structural Details
9700 29700
5 DD3 1200 X 2400 - 2400 AL. Door
TERRACE FLOOR
F.F.LVL. +23700
TERRACE FLOOR
F.F.LVL. +23700
11 D2 900 X 2400 - 2400 Flush Door
4500
13 D3 750 X 2100 - 2100 FRP Door
Truss As per
Structural Details
FOURTH FLOOR FOURTH FLOOR
F.F.LVL. +19200 RPF BARRACK CORRIDOR OPEN TERRACE F.F.LVL. +19200 TTE REST ROOM CORRIDOR L. Toilet H.Toilet
14 D4 800 X 1800 - 1800 Fire/Shaft Duct Door
4500
16 HD 1200 X 2400 - 2400 Handicap Toilet Door
THIRD FLOOR THIRD FLOOR
F.F.LVL. +14700 COMMERCIAL CORRIDOR F.F.LVL. +14700 COMMERCIAL CORRIDOR L. Toilet H.Toilet
5100
5 METERS OF 19 W2 1800 X 1500 900 2400 Aluminium Window
SECOND FLOOR CANTILEVERED SECOND FLOOR
F.F.LVL. +9600 COMMERCIAL 1ST CLASS WAITING (M) CORRIDOR CORRIDOR F.F.LVL. +9600 COMMERCIAL CORRIDOR L. Toilet H.Toilet
5000
20 W3 1500 X 1500 900 2400 Aluminium Window
4500
4500
21 W4 1200 X 1500 900 2400 Aluminium Window
FIRST FLOOR
F.F.LVL. +5100 COMMERCIAL CORRIDOR
FIRST FLOOR
F.F.LVL. +5100 CORRIDOR L. Toilet Rest Room 22 V1 1800 X 600 1800 2400 Ventilator
5100
24 V2A 1200 X 1500 900 2400 Ventilator
Platform - 1
450
300
GROUND FLOOR
FINISHED PLATFORM .LVL. ± 00 FORECOURT LFB AFC Gates PAID CONCOURSE 10000
GROUND FLOOR
FINISHED PLATFORM .LVL. ± 00
9 METER WIDE ROAD
FIRE STAIRCASE CORRIDOR LIFT SHAFT L. Toilet H.Toilet 25 V3 600 X 600 1800 2400 Ventilator
9 METER WIDE ROAD
ACCESS ROAD LEVEL
ACCESS ROAD LEVEL
F.F.LVL. - 450
F.F.LVL. - 450 50 mm Thik. Floor 50 mm Thik. Floor 50 mm Thik. Floor 50 mm Thik. Floor
75 mm Paver block
100 mm Thick PCC
150 mm Thick Sand Filling
Rammed Earth
100 mm Thick PCC
150 mm Thick Sand Filling
Rammed Earth
Track Side
75 mm Paver block
100 mm Thick PCC
100 mm Thick PCC
150 mm Thick Sand Filling
Rammed Earth
PIT
100 mm Thick PCC
150 mm Thick Sand Filling
Rammed Earth
26 OP 4000 X 2400 - 2400 Opening Area
150 mm Thick Sand Filling 150 mm Thick Sand Filling
Rammed Earth Rammed Earth
"Section - B-B" "Section - B-B" "Section - A-A" "Section - A-A" 27 GL1 2400 X As/Site 600 BOB. Str. Glazing
Note:- All External Wall Thickness 200 MM. & All Dimension From F.F.L
- - - "Legend" - - -
200mm thk.Solid Block Masonry wall up to Beam/Slab Bottom
Double Skin ply Partition 900 Ht. with Glass up to Beam Bottom
SOUTHERN RAILWAY
- - - "Finishing Schedule" - - - EPC CONTRACTOR :-
Facilities Flooring Skirting Wall Interior Ceiling Wall Exterior DESIGN DIRECTOR :-
(CA/2005/37204)
Office/Ticket Acoustic Ceiling Tile or
Booking Counters
Vitrified Floor Tile 150 High. Vitrified Floor Tile interior Emulsion Paint
Suspend Ceiling M/s .Bridge and Roof Company
Arrival or Departure 40 mm Thik. Flame cut
150 High. Granite
20 mm Thik. Polish Granite Cladding upto Putty with Paint Finish/Acoustic (India) Limited.
Lobby/Corridor Granite with Pattern/Motif 1800 mm High & AboveEmulsion Paint Ceiling Spray/Suspended Ceiling Exterior Wall Cladding
Office/RCT/ with Stone/ Granite Tile,
Vitrified Floor Tile 150 High. Vitrified Floor Tile interior Emulsion Paint Putty with Paint Finish Exterior Glass Facade EPC ARCHITECT:-
Restrooms
with DGU, Exterior EPC CONTRACTOR :-
Electrical Room
Cement Flooring interior Emulsion Paint Fair Face Concrete Emulsion Paint
& AHU Room
Smooth or Texture Paint C.P.& D.S. ASSOCIATES,
Staircase Steps & Plain cut Granite 20 mm Thik. Polish Granite on Riser
150 High. Granite Putty with Paint Finish (An ISO 9001-2008 Certified Company)
Landings 40 mm Thik. & Dado (Wherever Required) ARCHITECTS ENGINEERS,INTERIORS,P.M.C.
Toilet Area Metal Ceiling (600 X 600)
20 mm Thik. Honed Granite 600 X 300 Ceramic tile upto False Ceiling
& Water Proof Gypsum PROJECT TITLE:-
UDAY
A NA
GAR
ROAD
PROPOSED STP
NTS(A0) 2216
SALIM
TANK
AC
BUILDING AC TANK
TRANSFORMER
STOCK YARD
THENPARAMBIL ROAD
BUILDING
RCC TANK
IOC
RCC
RCC
N S DRAWING TITLE:-
OF GCDA - ONLY PARKING AND
ROAD
RCC
AC BUILDING
RCC RCC
CANTEEN
CIRCULATION FACILITIES PROPOSED
AC SHED RCC
STORE SHED
LAND PARCEL-3
AC SHED
= 0.62ACRES(2509 SQM)
AC SHED
KARITHALA
AC WORK RCC
SHOP IOC COMPOUND
AC SHED
PARKING- 82 CARS
3
RCC
G
+1 ACTOILET
ACSHED
EXISTING GCDA BLDG.
10
ACWORK
SHOP
ACSHED
DRAIN
AC WORK
SHOP
PLATFORM-6
PLATFORM-6
RCC+1
EXISTING 5M WIDE ROAD AUDITORIUM
G+1
ACSHED
ACWORK RCCBL
SHOP ACSHED TANK
RCCG
TANK
PROPOSED
TANK ROAD 9.0
m WIDE
742
PIPE
LINE
AERA
PRO. TOTAL LENGTH 605 m(26 COACH + 1 ENGINE)
PLATFORM-4 & 5
PRO. TOTAL LENGTH 605 m(26 COACH + 1 ENGINE)
PLATFORM-4 & 5
2
2 WHEELER
16
PARKING
16
PLATFORM-1
PLATFORM-1
1 PROPOSED ROAD 7.0 m WIDE
9 8
METRO
LINEN ROOM EXISTING: LANDSCAPE AREA
PARCEL OFFICE RMS BUILDING
=486.10 Sqm GF -522.40 Sqm) RRI CABIN/ SIGNALLING
TANK
DROP OFF AREA DROP OFF AREA PICK UP AREA
18
124
6
PROPOSED ROAD 5 m WIDE
KSRTC 7
BUILDING UNDER
RUNNING ROOM
7 PICK UP
CROSSING
ROAD
GARAGE
TOWER 1
15 5
17 4
W
RUNNING ROOM (GENTS)
4 UNITS
TYPE - IV 129 A-F
UP
RAMP
BU ROAD
KALATHIPARAM
OF
ROAD
KALATHIP ARAMBIL
ON
JUNCTI
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
149210
30000 30000 30000 30000 30000
150000
7400 1800 8850 965 10185 875 3725 4800 1305 3495 3900 2580 120 3700 2700 2725 875 3345 5145 960 1145 8020 1145 960 5145 3345 875 2725 2700 3700 320 2380 3900 4025 775 4800 3725 875 10600 9305 1895 7410
2000 mm Wide
Slab Projection. 5 DD3 1200 X 2400 - 2400 AL. Door
TERRACE FLOOR
F.F.LVL. +23700
LVL. -12575 LVL. -12575 LVL. -12575 LVL. -12575 LVL. -12575 LVL. -12575 LVL. -12575 LVL. -12575 LVL. -12575 LVL. -12575
6 SD1 2000 X 2400 - 2400 Fire Rated Steel Door
LVL. -10375
FOURTH FLOOR
8 D1 1000 X 2400 - 2400 Flush Door
F.F.LVL. +19200
F.F.LVL. +14700 LVL. +3000 LVL. +3000 LVL. +3000 LVL. +3000
200 mm Wide
Slab Projection.
11 D2 900 X 2400 - 2400 Flush Door
FIRST FLOOR
F.F.LVL. +5100
LVL. +3000 LVL. +3000 LVL. ±00 LVL. ±00 LVL. ±00 LVL. ±00 LVL. ±00 LVL. ±00 LVL. ±00 LVL. ±00 LVL. +3000 LVL. +3000
16 HD 1200 X 2400 - 2400 Handicap Toilet Door
Stone Cladding
LVL. -14600 LVL. -14000
Note:- All External Wall Thickness 200 MM. & All Dimension From F.F.L
- - - "Legend" - - -
200mm thk.Solid Block Masonry wall up to Beam/Slab Bottom
Double Skin ply Partition 900 Ht. with Glass up to Beam Bottom
SOUTHERN RAILWAY
- - - "Finishing Schedule" - - - EPC CONTRACTOR :-
Facilities Flooring Skirting Wall Interior Ceiling Wall Exterior DESIGN DIRECTOR :-
(CA/2005/37204)
Office/Ticket Acoustic Ceiling Tile or
Booking Counters
Vitrified Floor Tile 150 High. Vitrified Floor Tile interior Emulsion Paint
Suspend Ceiling M/s .Bridge and Roof Company
Arrival or Departure 40 mm Thik. Flame cut
150 High. Granite
20 mm Thik. Polish Granite Cladding upto Putty with Paint Finish/Acoustic (India) Limited.
Lobby/Corridor Granite with Pattern/Motif 1800 mm High & AboveEmulsion Paint Ceiling Spray/Suspended Ceiling Exterior Wall Cladding
Office/RCT/ with Stone/ Granite Tile,
Vitrified Floor Tile 150 High. Vitrified Floor Tile interior Emulsion Paint Putty with Paint Finish Exterior Glass Facade EPC ARCHITECT:-
Restrooms
with DGU, Exterior EPC CONTRACTOR :-
Electrical Room
Cement Flooring interior Emulsion Paint Fair Face Concrete Emulsion Paint
& AHU Room
Smooth or Texture Paint C.P.& D.S. ASSOCIATES,
Staircase Steps & Plain cut Granite 20 mm Thik. Polish Granite on Riser
150 High. Granite Putty with Paint Finish (An ISO 9001-2008 Certified Company)
Landings 40 mm Thik. & Dado (Wherever Required) ARCHITECTS ENGINEERS,INTERIORS,P.M.C.
Toilet Area Metal Ceiling (600 X 600)
20 mm Thik. Honed Granite 600 X 300 Ceramic tile upto False Ceiling
& Water Proof Gypsum PROJECT TITLE:-
UDAY
A NA
GAR
ROAD
PROPOSED STP
NTS(A0) 2216
SALIM
TANK
AC
BUILDING AC TANK
TRANSFORMER
STOCK YARD
THENPARAMBIL ROAD
BUILDING
RCC TANK
IOC
RCC
RCC
N S DRAWING TITLE:-
OF GCDA - ONLY PARKING AND
ROAD
RCC
AC BUILDING
RCC RCC
CANTEEN
CIRCULATION FACILITIES PROPOSED
AC SHED RCC
STORE SHED
LAND PARCEL-3
AC SHED
= 0.62ACRES(2509 SQM)
AC SHED
KARITHALA
AC WORK RCC
SHOP IOC COMPOUND
AC SHED
PARKING- 82 CARS
3
RCC
G
+1 ACTOILET
ACSHED
EXISTING GCDA BLDG.
10
ACWORK
SHOP
ACSHED
DRAIN
AC WORK
SHOP
PLATFORM-6
PLATFORM-6
RCC+1
EXISTING 5M WIDE ROAD AUDITORIUM
G+1
ACSHED
ACWORK RCCBL
SHOP ACSHED TANK
RCCG
TANK
PROPOSED
TANK ROAD 9.0
m WIDE
742
PIPE
LINE
AERA
PRO. TOTAL LENGTH 605 m(26 COACH + 1 ENGINE)
PLATFORM-4 & 5
PRO. TOTAL LENGTH 605 m(26 COACH + 1 ENGINE)
PLATFORM-4 & 5
2
2 WHEELER
16
PARKING
16
PLATFORM-1
PLATFORM-1
1 PROPOSED ROAD 7.0 m WIDE
9 8
METRO
LINEN ROOM EXISTING: LANDSCAPE AREA
PARCEL OFFICE RMS BUILDING
=486.10 Sqm GF -522.40 Sqm) RRI CABIN/ SIGNALLING
TANK
DROP OFF AREA DROP OFF AREA PICK UP AREA
18
124
6
PROPOSED ROAD 5 m WIDE
KSRTC 7
BUILDING UNDER
RUNNING ROOM
7 PICK UP
CROSSING
ROAD
GARAGE
TOWER 1
15 5
17 4
W
RUNNING ROOM (GENTS)
4 UNITS
TYPE - IV 129 A-F
UP
RAMP
BU ROAD
KALATHIPARAM
OF
ROAD
KALATHIP ARAMBIL
ON
JUNCTI