Carbon Steel Pipe Price List Indonesia
Carbon Steel Pipe Price List Indonesia
All Above Prices Indonesian Rupiahs equals/Ton, All Above Prices only for Indonesia
Delivery Time: READY TO DISPACTH WITH IN 15 TO 20 DAYS FROM NHAVA SHEVA PORT INDIA
LENGTH: 5 TO 8 OR 9 TO 12 METER LONG
ORIGIN OF MATERIAL: INDIA / KOREA / EUROPE
PAYMENT TERMS: 20% ADVANCE & BALANCE AFTER INSPECTION / LC AT SIGHT
CERTIFICATE: 3.1 / 3.2 (INSPCETION & TESTING CHARGES WILL BE EXTRA)
All Above Prices Indonesian Rupiahs equals/Ton, All Above Prices only for Indonesia
Delivery Time: READY TO DISPACTH WITH IN 15 TO 20 DAYS FROM NHAVA SHEVA PORT INDIA
LENGTH: 5 TO 8 OR 9 TO 12 METER LONG
ORIGIN OF MATERIAL: INDIA / KOREA / EUROPE
PAYMENT TERMS: 20% ADVANCE & BALANCE AFTER INSPECTION / LC AT SIGHT
CERTIFICATE: 3.1 / 3.2 (INSPCETION & TESTING CHARGES WILL BE EXTRA)
Schedule 20 – 80
SIZE" SIZE NB SCH 20 SCH 30 SCH 40 SCH 60 SCH 80
1/2 15 3,70,88,026 3,70,88,026
3/4 20 3,70,88,026 3,70,88,026
1 25 2,55,16,562 2,55,16,562
1.25 32 2,55,16,562 2,55,16,562
1.5 40 2,22,52,816 2,22,52,816
2 50 2,15,11,055 2,15,11,055
2.5 65 2,15,11,055 2,15,11,055
3 80 2,15,11,055 2,15,11,055
3.5 90 2,15,11,055 2,15,11,055
4 100 2,15,11,055 2,15,11,055
5 125 2,15,11,055 2,15,11,055
6 150 2,15,11,055 2,15,11,055
8 200 2,29,94,576 2,15,11,055 2,15,11,055 2,22,52,816 2,15,11,055
10 250 2,29,94,576 2,15,11,055 2,15,11,055 2,22,52,816 2,15,11,055
12 300 2,32,91,280 2,22,52,816 2,25,49,520 2,34,39,633 2,25,49,520
14 350 2,32,91,280 2,22,52,816 2,25,49,520 2,34,39,633 2,25,49,520
16 400 2,67,03,379 2,52,19,858 2,44,78,097 2,55,16,562 2,44,78,097
18 450 3,18,95,703 3,11,53,942 2,96,70,421 3,11,53,942 2,96,70,421
20 500 3,18,95,703 3,11,53,942 2,96,70,421 3,11,53,942 2,96,70,421
22 550 4,45,05,631 4,22,80,350 3,63,46,266 3,56,04,505
24 600 3,70,88,026 3,59,01,209 3,26,37,463 3,63,46,266 3,26,37,463
All Above Prices Indonesian Rupiahs equals/Ton, All Above Prices only for Indonesia
Delivery Time: READY TO DISPACTH WITH IN 15 TO 20 DAYS FROM NHAVA SHEVA PORT INDIA
LENGTH: 5 TO 8 OR 9 TO 12 METER LONG
INSPCETION & TESTING CHARGES WILL BE EXTRA
ORIGIN OF MATERIAL: INDIA / KOREA / EUROPE
PAYMENT TERMS: 20% ADVANCE & BALANCE AFTER INSPECTION / LC AT SIGHT
CERTIFICATE: 3.1 / 3.2
Distributor of ASTM A106 grade B seamless pipes in Schedule 40/ 60, check the price list and stock
sizes
All Above Prices Indonesian Rupiahs equals/Ton, All Above Prices only for Indonesia
Delivery Time: READY TO DISPACTH WITH IN 15 TO 20 DAYS FROM NHAVA SHEVA PORT INDIA
LENGTH: 5 TO 8 OR 9 TO 12 METER LONG
INSPCETION & TESTING CHARGES WILL BE EXTRA
ORIGIN OF MATERIAL: INDIA / KOREA / EUROPE
PAYMENT TERMS: 20% ADVANCE & BALANCE AFTER INSPECTION / LC AT SIGHT
CERTIFICATE: 3.1 / 3.2
Stock sizes of carbon steel Length Carbon steel pipe schedule chart
seamless pipe in Indonesia
Brands we stock