0% found this document useful (0 votes)
439 views

For Moc - SPP Doc 202 Tables

The document outlines various groups of building types and the applicable percentage fees for design and engineering services. It provides the following key information: - Group I includes industrial and agricultural structures with fees of 5-10% for design and 3-6% for additional services. - Group II includes institutional, commercial and residential buildings with fees of 6% for design and 3.6% for additional services. - Group III includes recreational, medical and research facilities with fees of 7% for design and 4.2% for additional services. - Fees are provided on a sliding scale based on the size of development plans and physical planning projects.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
439 views

For Moc - SPP Doc 202 Tables

The document outlines various groups of building types and the applicable percentage fees for design and engineering services. It provides the following key information: - Group I includes industrial and agricultural structures with fees of 5-10% for design and 3-6% for additional services. - Group II includes institutional, commercial and residential buildings with fees of 6% for design and 3.6% for additional services. - Group III includes recreational, medical and research facilities with fees of 7% for design and 4.2% for additional services. - Fees are provided on a sliding scale based on the size of development plans and physical planning projects.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SPP DOC 202:

Group and GROUP VII Housing Projects involving construction of 1st unit shall be full RPF
Applicable Building Types (and Desriptions)
Percentage several units based on 1 set of drawings Succeeding units shall be charged as a
GROUP I 1. Armories 8. Packaging and Processing DAEDS: 10% percent of 1st RPF:
2. Bakeries Plants DADS: 6% For DAEDS For DADS
DAEDS: 5% 3. Farm Structures 9. Parking Structures Unit 02-10: 50% Unit 02-10: 30%
DADS: 3% 4. Freight Facilities 10. Printing Plants Unit 11-30: 40% Unit 11-30: 24%
5. Hangars 11. Public Markets Unit 31-50: 25% Unit 31-50: 15%
6. Industrial Buildings 12. Service Garages Unit 51 and all succeeding: 15% Unit 51 and all succeeding: 9%
7. Manufacturing / Industrial Plants 13. Simple Loft-Type Structures GROUP VIII Projects involving extensive details such Design for built-in components,
14. Warehouses as: screens, counters, architectural
GROUP II 1. Art Galleries 17. Nursing Homes 15% of PCC interiors and development planning or
2. Banks, Financial Institutions 18. Office Buildings design
DAEDS: 6% 3. Bowling Alleys 19. Parks, Playgrounds GROUP IX For alteration or additions of existing Compensation of services should be
DADS: 3.6% 4. Churches and Religious Facilities 20. Open-air Recreational structure belonging to Group I to V increased by 50%
5. City Halls Facilities 150% of Basic (Total of 150% of the RPF)
6. College Buildings 21. Police Stations Fee
7. Convents, Monasteries and 22. Post Offices 1. Opinions, advice, clarifications or 1. Service as an Expert Witness
Seminaries 23. Private Clubs 2. Explanation on technical matters (regardless if scheduled
8. Correcional, Detention Institution 24. Publishing Plants pertaining to the profession hearing took place or not)
9. Court Houses 25. Race Tracks GROUP X
10. Dormitories 26. Restaurants Rate: Rate:
11. Exhibition Halls, Display 27. Retail Stores Php 1,000/ hr Php 5,000/hr
Structures 28. Schools RPF FOR PHYSICAL PLANNING
12. Fire Stations 29. Shopping Centers
13. Laundries, Cleaning Facilities 30. Specialty Shops AREA RPF AMOUNT
14. Libraries 31. Supermarkets Basic Rate for first 5 hec or less Php 5.00 per sqm Php 250,000.00
15. Motels and Apartelles 32. Welfare Buildings Over 5 – 10 hectares Php 4.00 per sqm Php 250,000.00 +
16. Multi-storey Apartments Php 40,000 per hectare
GROUP III 1. Aquaria 12. Medical Office Facilities, above 5 hec and below 10 hec
2. Atomic Facilities Clinics Over 10 – 50 hectares Php 3.00 per sqm Php 450,000.00 +
DAEDS: 7% 3. Auditoria 13. Mental Institutions Php 30,0000 per hectare
DADS: 4.2% 4. Breweries 14. Mortuaries Above 10 hec and below 50 hec
5. Cold Storage Facilities 15. Observatories Over 50 hectares Php 1.50 per sqm Php 1,650,000.00 +
6. Communication Bldgs. 16. Public Health Centers Php 15,000 per hectare
7. Convention Halls 17. Research Facilities Above 50 hectares
8. Gymnasium 18. Stadia Framework Dev’t Plan 30% of RPF Preliminary Master 20% of RPF
9. Hospitals, Medical Bldgs 19. Theaters and Similar Facilities (FrDP) Dev’t Plan (PMDP)
10. Hotels 20. Veterinary Hospitals Conceptual Master 30% of RPF Detailed Master 20% of RPF
11. Marinas 21. Laboratories Dev’t Plan (CMDP) Dev’t Plan (DMDP)
GROUP IV 1. Residences 2. Small Apartment Houses PAYMENT SCHEDULE
a. Single-detached 3. Townhouses Payment Progression
DAEDS: 10% b. Single-attched (duplex) Milestone
(Percent of fee) (Percent of fee)
DADS: 6% 1. Upon signing of Contract of Services 5% 5%
GROUP V 1. Exposition/Fair Buildings 4. Specialized Decorative Bldgs. 2. Completion of Schematic Design 15% 20%
2. Mausoleums, Memorials, 5. Structures of similar nature of 3. Completion of Design Development 20% 40%
DAEDS: 12% Monuments use 4. Completion of Contract Document 50% 90%
DADS: 7.5% 3. Museums 5. 15 Days after Awarding of Winning Bid Adjustment to fulfill 90%
GROUP VI Repetitive Construction of Buildings and 1st Instance: 100% of PF based on the 90%
Structures 2nd Instance: 50% Winning Bid Price
3rd Instance: 40% 10%
6. Each instance cost as a percent of 4th Instance: 30% (5% for civil liability, 5%
the RPF for the Building Type 7. & all succeeding 6. Upon Completion of Construction 100%
for Periodic Construction
Supervision

You might also like