0% found this document useful (0 votes)
20 views

EST2592

This document is an estimate from an industrial area workshop for repairs to a Toyota Hiace van for Al Muftah Contracting Company. It lists replacing an evaporator for 350 Qatari Riyals plus 1000 Qatari Riyals in labor charges for a grand total of 1350 Qatari Riyals. The manager and customer signatures are needed to accept the estimate.

Uploaded by

subin sujathan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views

EST2592

This document is an estimate from an industrial area workshop for repairs to a Toyota Hiace van for Al Muftah Contracting Company. It lists replacing an evaporator for 350 Qatari Riyals plus 1000 Qatari Riyals in labor charges for a grand total of 1350 Qatari Riyals. The manager and customer signatures are needed to accept the estimate.

Uploaded by

subin sujathan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ESTIMATION

INDUSTRIAL AREA, STREET 17


Tel.: 44600087,44722812

SHEET NO: EST2592


CUSTOMER NAME: Al Muftah - Contracting Company Oil and Gas
Car Type: TOYOTA Model: HIACE DATE: 23/Aug/2023
Regd. No:133158 COLOR: CHASIS NO:

SL.NO DESCRIPTION QTY MRP TOTAL


1 EVAPORATOR dup 1 350.00 350.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
SPAREPARTS 350.00
DISCOUNT AMOUNT
TOTAL SPAREPARTS 350.00
TORNA
LABOR CHARGE 1,000.00
GRAND TOTAL 1,350.00
N/A : not available

MANAGER SIGNATURE CUSTOMER SIGNATURE


NB: GRAND TOTAL MAYBE CHANGED DEPENDING ON THE SPARE PARTS AND THE ACTUAL WORK DONE

You might also like