0% found this document useful (0 votes)
67 views

Construction Notes Revised

The document provides construction notes for a project, including: 1. General notes stating that construction notes and details apply to all drawings, and contractors must verify dimensions and coordinate with other contractors. 2. Concrete notes specifying minimum compressive strengths and maximum aggregate sizes for different elements, as well as reinforcement requirements. 3. Masonry notes including requirements for concrete masonry units, reinforcement, and grout. 4. A note indicating the foundation design was based on an assumed soil bearing capacity.

Uploaded by

Kessler Biatingo
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views

Construction Notes Revised

The document provides construction notes for a project, including: 1. General notes stating that construction notes and details apply to all drawings, and contractors must verify dimensions and coordinate with other contractors. 2. Concrete notes specifying minimum compressive strengths and maximum aggregate sizes for different elements, as well as reinforcement requirements. 3. Masonry notes including requirements for concrete masonry units, reinforcement, and grout. 4. A note indicating the foundation design was based on an assumed soil bearing capacity.

Uploaded by

Kessler Biatingo
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

CONSTRUCTION NOTES

A. GENERAL

1. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS


UNLESS OTHERWISE SHOWN OR NOTED. MODIFY TYPICAL DETAILS AS
DIRECTED TO MEET SPECIAL CONDITIONS.
2. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL
STRUCTURAL STEELS, MISCELLANEOUS IRON, PRE-CAST CONCRETE ETC.
SHALL BE SUBMITTED FOR ENGINEER’S APPROVAL BEFORE FABRICATION.
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE ALL WORK IS TO BEGIN
CHECK WITH
MECHANICAL AND ELECTRICAL CONTRACTORS FOR CONDUITS PIPE SLEEVES,
ETC., TO BE EMBEDDED IN CONCRETE.
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE
SHORING & BRA-
CINGS OF THE STRUCTURE FOR ALL LOADS THAT MAYBE IMPOSED DURING
CONSTRUCTION.

B. CONCRETE AND REINFORCEMENT

1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE LATEST


NATIONAL BUILDING CODE OF THE PHILIPPINES AND NSCP 2015.
2. ALL CONCRETE SHALL DEVELOP A MIN. COMPRESSIVE STRENGTH AT THE END
OF TWENTY EIGHT (28) DAYS W/ CORRESPONDING MAXIMUM SIZE
AGGREGATE & SLUMPS AS FOLLOWS.

LOCATION MINIMUM MAXIMUM SIZE MAXIMUM


COMPRESSIVE OF AGREGGATES SLUMP
STRENGTH AT 28
DAYS
FOUNDATION 20.7 MPA (3000 ¾ IN. (19 MM) 4 IN. (100 MM)
FOOTING PSI)
COLUMNS 20.7 MPA (3000 ¾ IN. (19 MM) 4 IN. (100 MM)
PSI)
BEAMS, SLABS 20.7 MPA (3000 ¾ IN. (19 MM) 4 IN. (100 MM)
PSI)
SLAB ON GRADE 20.7 MPA (3000 ¾ IN. (19 MM) 4 IN. (100 MM)
PSI)
3. ALL REINFORCING BARS SHALL CONFORM TO ASTM A615 GRADE 275 FOR
DIAMETER ALL REINFORCING BARS.
4. IN GENERAL, THE LATEST EDITION OF ACI-315, MANUAL OF STANDARD
PRACTICE DETAILING REINFORCED CONCRETE STRUCTURES SHALL BE
ADHERED TO UNLESS OTHERWISE SHOWN OR NOTED.
5. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS.
SUSPENDED SLABS----------------------------------------------------------
---------------¾ IN. (19 MM)
SLAB ON GRADE------------------------------------------------------------
----------------1- 1/2 IN. (40MM)
WALLS ABOVE GRADE-------------------------------------------------------
--------------1 IN. (25MM)
BEAMS STIRRUPS AND COLUMN TIES-----------------------------------------
--------1 -1/2 IN. (40MM)
WHERE CONCRETE IS EXPOSED TO
EARTH BUT POURED AGAINST FORMS----------------------------------------
------- 2 IN. (50 MM)
WHERE CONCRETE IS DEPOSITED
DIRECTLY AGAINST EARTH---------------------------------------------------
------------3 IN. (75MM)
6. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN
ACCORDANCE W/ TABLE 1 (TABLE OF LAP SPLICE & ANCHORAGE LENGTH)
UNLESS OTHERWISE SHOWN ON DRAWINGS, SPLICES SHALL BE STAGGERED
WHENEVER POSSIBLE.
7. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY
POSITIONED & SECURED IN PLACE PRIOR TO PLACING OF CONCRETE.
8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS,
STOOLS, EQUIPMENT'S AND MECHANICAL BASES THAT ARE REQUIRED BY THE
ARCHITECTURAL, ELECTRICAL, AND MECHANICAL DRAWINGS.
9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN
CONSECUTIVE DAYS IMMEDIATELY AFTER POURING BY THE USE OF WET
BURLAP FOG SPRAYING, CURING COMPOUNDS OR OTHER APPROVED
METHODS.
10. STRIPPING OF FORMS AND SHORES:
FOUNDATION---------------------------------------------------------------
----------------24 HRS
SUSPENDED SLAB EXCEPT WHEN
ADDITIONAL LOADS ARE IMPOSED-------------------------------------------
---------8 DAYS
WALLS----------------------------------------------------------------------
------------------18 HRS
BEAMS----------------------------------------------------------------------
-----------------14 DAYS
C. MASONRY AND CONCRETE BLOCKS
1. ALL NON-LOAD BEARING TYPE CONCRETE BLOCKS SHALL HAVE A UNIT WEIGHT
NOT TO EXCEED 80 PCF. FOR LOAD BEARING TYPE, TYPE CONCRETE BLOCKS, A
MINIMUM COMPRESSIVE STRENGTH OF 6.90 MPA SHALL BE DEVELOPED.
2. PROVIDE 1-∅16 VERTICAL BARS AT CORNERS, INTERSECTIONS, END OF WALLS
AND EACH SIDE OF OPENINGS.
3. LINTEL BEAMS SHALL BEAR AT LEAST 8 INCHES (200 MM) ON EACH SIDE OF
MASONRY WALL OPENING.
4. WALL REINFORCEMENTS SHALL BE AS FOLLOWS.
WALL THICKNESS VERTICAL HORIZONTAL
REINFORCEMENT REINFORCEMENT
8 IN. (200MM) Ø12@400MM Ø10@600MM
6 IN. (150MM) Ø10@400MM Ø10@600MM
4 IN. (100MM) Ø10@400MM Ø10@600MM
5. REINFORCING BARS SHALL BE LAPPED A MINIMUM OF 40 BAR DIAMETERS WHERE
SPLICE DOWELS FROM FOOTING OR SLABS SHALL EXTEND INTO THE BLOCK WALL
A MINIMUM OF 40 BAR DIAMETERS, AND DOWELS TO MATCH.
6. ALL CELLS CONTAINING REINFORCING BARS OR INSERTS SHALL BE SOLIDLY
FILLED WITH CONCRETE GROUT (REFER TO SPECIFICATIONS).
D. FOUNDATION
1. FOUNDATION DESIGN WAS BASED ON ASSUMED SOIL BEARING CAPACITY OF
70KPA