0% found this document useful (0 votes)
27 views54 pages

Ce8701 LN

Uploaded by

A K
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views54 pages

Ce8701 LN

Uploaded by

A K
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 54

ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

MOHAMED SATHAK AJ COLLEGE OF


ENGINEERING

DEPARTMENT OF CIVIL ENGINEERING

CE8701 ESIMATION COSTING AND VALUATION ENGINEERING


(VII SEMESTER R-2017)

COURSE MATERIAL

COMPILED BY

Mr. NAVANEETHAKRISHNAN M.E.,

ASSISTANT PROFESSOR

DEPARTMENT OF CIVIL ENGINEERING

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 1


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

UNIT I QUANTITY ESTIMATION

1.INTRODUCTION

DEFINITION OF ESTIMATING AND COSTING

Estimating is the technique of calculating or Computing the various quantities and


the expected Expenditure to be incurred on a particular work or project. In case the funds
avilable are less than the estimated cost the work is done in part or by reducing it or
specifications are altered, the following requirement are necessary for preparing an
estimate.

a ) Drawings like plan, elevation and sections of important points.

b) Detailed specifications about workmanship & properties of materials etc.

c) Standard schedule of rates of the current year.

NEED FOR ESTIMATION AND COSTING

1. Estimate give an idea of the cost of the work and hence its feasibility can be
determined i..e whether the project could be taken up with in the funds available or not.

2. Estimate gives an idea of time required for the completion of the work.

3. Estimate is required to invite the tenders and Quotations and to arange contract.

4. Estimate is also required to control the expenditure during the execution of work.

5. Estimate decides whether the proposed plan matches the funds available or not.

PROCEDURE OF ESTIMATING OR METHOD OF ESTIMATING.

Estimating involves the following operations

1. Preparing detailed Estimate.

2. Calculating the rate of each unit of work

3. Preparing abstract of estimate

DATA REQUIRED TO PREPARE AN ESTIMATE

1. Drawings i.e.plans, elevations, sections etc.

2. Specifications.

3. Rates.

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 2


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

DRAWING

If the drawings are not clear and without complete dimensions the preparation of
estimation become very difficult. So, It is very essential before preparing an estimate.

UNITS OF MEASUREMENTS:

The units of measurements are mainly categorised for their nature, shape and size and for
making payments to the contractor and also. The principle of units of measurements
normally consists the following:

a) Single units work like doors, windows, trusses etc., are expressed in numbers.

b) Works consists linear measurements involve length like cornice, fencing, hand rail,
bands of specified width etc., are expressed in running metres (RM)

c) Works consists areal surface measurements involve area like plastering, white washing,
partitions of specified thickness etc., are expressed in square meters (m2 )

d) Works consists cubical contents which involve volume like earth work, cement
concrete, Masonry etc are expressed in Cubic metres.

Sl. No. Particulas of item Units of Measurement Units of payment


I Earth work:
1. Earth work in Excavation Cum Per%cum
2. Earthwork in fillingin Cum Per%cum
foundation trenches
3. Earth work in filling in plinth Cum Per%cum

II Concrete:
1. Lime concretre in foundation Cum Percum
2. Cement concrete in Lintels Cum Percum
3. R.C.C.in slab Cum Percum
4. C.C. or R.C.C. Chujja, Cum Percum
Sunshade
5. L.C. in roof terracing Sqm perSqm
(thickness specified)
6. Cement concrete bed Cum Percum
7. R.C. Sunshade (Specified Cum 1m
Width & Hight

III Damp ProofCource (D.P.C) Sqm Persqm


(Thickness should be mentioned)

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 3


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

IV Brick work:
1. Brickwork in foundation Cum Percum
2. Brick work in plinth Cum Percum
3. Brick work in super structure Cum Percum
4. Thin partition walls Sqm persqm
5. Brick work in arches Cum Percum
6. Reinforced brick work Cum Percum
(R.B.Work)
V Stone Work:
Stone masonry Cum PerCum

VI Roofing
1. R.C.C. and R.B.Slab roof Cum PerCum
(excluding steel)
2. L.C. roof over and inclusive of Sqm persqm
tiles or brick or stone slab etc
(thickness specified)
3. Centering and shuttering form Sqm persqm
work 4. A.C.Sheet roofing Sqm persqm

VII Plastering, points&finishing


1. Plastering-Cement or Lime Sqm persqm
Mortar (thickness and proportion
specified) Sqm persqm
2. Pointing Sqm persqm
3. White washing, colour
washing, cement wash (number
of coats specified) Sqm persqm
4. Distempering (number of coats Sqm persqm
specified)

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 4


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

RULES FOR MEASUREMENT :

The rules for measurement of each item are invaribly described in IS- 1200. However
some of the general rules are listed below.

1. Measurement shall be made for finished item of work and description of each item
shall include materials, transport, labour, fabrication tools and plant and all types of
overheads for finishing the work in required shape, size and specification.

2. In booking, the order shall be in sequence of length, breadth and height or thickness.

3. All works shall be measured subject to the following tolerances.

i) Linear measurement shall be measured to the nearest 0.01m.

ii) Areas shall be measured to the nearest 0.01 sq.m

iii) Cubic contents shall be worked-out to the nearest 0.01 cum

4. Same type of work under different conditions and nature shall be measured separately
under separate items.

5. The bill of quantities shall fully describe the materials, proportions, workmanships and
accurately represent the work to be executed.

6. In case of masonary (stone or brick) or structural concrete, the categories shall be


measured separately and the heights shall be described:

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 5


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

a) from foundation to plinth level

b) from plinth level to First floor level

c) from Fist floor to Second floor level and so on.

METHODS OF TAKING OUT QUANTITIES:

The quantities like earth work, foundation concrete, brickwork in plinth and super
structure etc., canbe workout by any of following two methods:

a) Long wall - short wall method

b) Centre line method.

c) Partly centre line and short wall method.

a) Long wall-short wall method:

In this method, the wall along the length of room is considered to be long wall
while the wall perpendicular to long wall is said to be short wall. To get the length of long
wall or short wall, calculate first the centre line lengths of individual walls. Then the
length of long wall, (out to out) may be calculated after adding half breadth at each end to
its centre line length. Thus the length of short wall measured into in and may be found by
deducting half breadth from its centre line length at each end. The length of long wall
usually decreases from earth work to brick work in super structure while the short wall
increases. These lengths are multiplied by breadth and depth to get quantities.

b) Centre line method:

This method is suitable for walls of similar cross sections. Here the total centre
line length is multiplied by breadth and depth of respective item to get the total quantity at
a time. When cross walls or partitions or verandah walls join with mainall, the centre line
length gets reduced by half of breadth for each junction. such junction or joints are
studied caefully while calculating total centre line length.The estimates prepared by this
method are most accurate and quick.

c) Partly centre line and partly cross wall method:

This method is adopted when external (i.e., alround the building) wall is of one
thickness and the internal walls having different thicknesses. In such cases, centre line
method is applied to external walls and long wall-short wall method is used to internal
walls. This method suits for different thicknesses walls and diffeent level of foundations.
Because of this reason, all Engineering departments are practicing this method.

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 6


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

I. Example 1: From the given figure below calculate the detailed and abstract estimate for
the single roomed building (Load bearing type structure) by a) long wall & short wall
method (b) Centre Line Method

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 7


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 8


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 9


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 10


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 11


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 12


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 13


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 14


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 15


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 16


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

FIXING OF RATE PER UNIT OF AN ITEM:

The rate per unit of an item includes the following:

Quantity of material and cost:

The requirement of mateials are taken strictly in accordance with standard data
book(S.D.B). The cost of these includes first cost, freight, insurance and transportation
charges.

ii) Cost of labour: The exact number of labourers required for unit of work and the
multiplied by the wages/ day to get of labour for unit item work.

iii) Cost of equipment (T&P): Some works need special type of equipment, tools and
plant. In such case, an amount of 1 to 2% of estimated cost is provided.

iv) Overhead charges: To meet expenses of office rent, depreciation of equipment


salaries of staff postage, lighting an amount of 4% of estimate cost is allocated.

METHODS OF PREPARATION OF APPROXIMATE ESTIMATE:

Preliminary or approximate estimate is required for studies of various aspects of


work of project and for its administrative approval. It can decide, in case of commercial
projects, whether the net income earned justifies the amount invested or not. The
approximate estimate is prepared from the practical knowledge and cost of similar works.
The estimate is accompanied by a report duely explaining necessity and utility of the
project and with a site or layout plan. A percentage 5 to 10% is allowed for contingencies.
The following are the methods used for preparation of approximate estimates.

a) Plinth area method

b) Cubical contents methods

c) Unit base method.

a) Plinth area method:

The cost of construction is determined by multiplying plinth area with plinth area
rate. The area is obtained by multiplying length and breadth (outer dimensions of
building). In fixing the plinth area rate, carefull observation and necessary enquiries are
made in respect of quality and quantity aspect of materials and labour, type of foundation,
hight of building, roof, wood work, fixtures, number of storeys etc.,

As per IS 3861-1966, the following areas include while calculating the plinth area
of building.

a) Area of walls at floor level.

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 17


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

b) Internal shafts of sanitary installations not exceeding 2.0m2 , lifts, airconditionsing


ducts etc., c) Area of barsati at terrace level:

Barsati means any covered space open on one side constructed on one side
constructed on terraced roof which is used as shelter during rainy season.

d) Porches of non cantilever type.

Areas which are not to include

a) Area of lofts.

b) Unenclosed balconies.

c) Architectural bands, cornices etc.,

d) Domes, towers projecting above terrace level.

e) Box louvers and vertical sunbreakers.

b) Cubical Contents Method:

This method is generally used for multistoreyed buildings. It is more accurate that
the other two methods viz., plinth area method and unit base method. The cost of a
structure is calculated approximately as the total cubical contents (Volume of buildings)
multiplied by Local Cubic Rate. The volume of building is obtained by Length x breadth
x depth or height. The length and breadth are measured out to out of walls excluding the
plinth off set.

The cost of string course, cornice, carbelling etc., is neglected.

The cost of building= volume of buildings x rate/ unit volume.

c) Unit Base Method:

According to this method the cost of structure is determined by multiplying the


total number of units with unit rate of each item. In case schools and colleges, the unit
considered to be as 'one student' and in case of hospital, the unit is 'one bed'. the unit rate
is calculated by dividing the actual expenditure incured or cost of similar building in the
nearby locality by the number of units.

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 18


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 19


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 20


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 21


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 22


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 23


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

UNIT II RATE ANALYSIS AND COSTING

ANALYSIS OF RATES

Definition :

In order to determine the rate of a particular item, the factors affecting the rate of
that item are studied carefully and then finally a rate is decided for that item. This process
of determining the rates of an item is termed as analysis of rates or rate analysis. The rates
of particular item of work depends on the following.

1. Specifications of works and material about their quality, proportion and constructional
operation method.

2. Quantity of materials and their costs.

3. Cost of labours and their wages.

4. Location of site of work and the distances from source and conveyance charges.

5. Overhead and establishment charges

6. Profit

Cost of materials at source and at site of construction.

The costs of materials are taken as delivered at site inclusive of the transport local
taxes and other charges.

Purpose of Analysis of rates:

1. To work out the actual cost of per unit of the items.

2. To work out the economical use of materials and processes in completing the
particulars item.

3. To work out the cost of extra items which are not provided in the contract
bond, but are to be done as per the directions of the department.

4. To revise the schedule of rates due to increase in the cost of material and labour
or due to change in technique.

Cost of labour -types of labour, standard schedule of rates

The labour can be classified in to


NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 24
ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

1) Skilled 1st class

2) Skilled IInd Class

3) un skilled

The labour charges can be obtained from the standard schedule of rates 30% of the skilled
labour provided in the data may be taken as Ist class, remaining 70% as II class. The rates
of materials for Government works are fixed by the superintendent Engineer for his circle
every year and approved by the Board of Chief Engineers. These rates are incorporated in
the standard schedule of rates.

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 25


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 26


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

ROAD ESTIMATION

Introduction:-

Generally all the Civil Engineering projects like roads, railways, earth dams, canal
bunds, buildings etc. involves the earth work.This earth work may be either earth
excavation or earth filling or Some times both will get according to the desired shape and
level.

Basically the volume of earthwork is computed from length, breadth, and depth of
excavation or filling.
NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 27
ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

Lead and Lift:

Lead:

It is the average horizontal distance between the centre of excavation to the centre
of deposition. The unit of lead is 50m.

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 28


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

Lift :

It is the average height through which the earth has to be lifted from source to the
place of spreading or heaping.

The unit of lift is 2.00m for first lift and one extra lift for every 1.0m. for example when
earth is to be lifted for 4.5m, Four lifts are to be paid to the contractor.

i.e. Upto2.0- 1 lift

1.0 - 1 Lift

1.0 - 1 lift

Total 04 lifts 0.5 - 1 lift

Calculation of earth work for Roads:

case 1) volume of earth work in banking or in cutting having "no longitudinal slope".

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 29


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

Case 2:

When the ground is in longitudinal slope or the formation has uniform gradient
for a length the earth work may be calculated by the following methods.

1. By Mid Section or Mid Cordinate method.

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 30


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 31


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 32


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 33


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 34


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

UNIT III SPECIFICATIONS, REPORTS AND TENDERS


SPECIFICATIONS

a) General Specifications:

This gives the nature, quality, class and work and materials in general terms to be used
in various parts of wok. It helps no form a general idea of building.

b) Detailed Specifications:

These gives the detailed description of the various items of work laying down the
Quantities and qualities of materials, their proportions, the method of preparation
workmanship and execution of work.

RATES:

For preparing the estimate the unit rates of each item of work are required.

1. For arriving at the unit rates of each item.

2. The rates of various materials to be used in the construction.

3. The cost of transport materials.

4. The wages of labour, skilled or unskilled of masons, carpenters, Mazdoor,

etc., LUMPSUM:

While preparing an estimate, it is not possible to workout in detail in case of petty


items. Items other than civil engineering such items are called lumpsum items or
simply L.S.Items. The following are some of L.S. Items in the estimate.

2. Water supply and sanitary arrangements.

3. Electrical installations like meter, motor, etc.,

4. Architectural features.

5. Contingencies and unforeseen items.

Ingeneral, certain percentage on the cost of estimation is alloted for the above L.S.Items.

Even if subestimates prepared or at the end of execution of work, the actual cost should
not exceed the L.S.amounts provided in the main estimate.

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 35


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

WORK CHARGED ESTABLISHMENT:

During the construction of a project considerable number of skilled supervisors, work


assistance, watch men etc., are employed on temporary basis. The salaries of these
persons are drawn from the L.S. amount alloted towards the work charged establishment.
that is, establishment which is charged directly to work. an L.S.amount of 1½ to 2% of
the estimated cost is provided towards the work charged establishment. EXERC
Measurement of Materials and Works

Detailed Specifications Of Excavations, Filling And Backfilling Scope of Work The scope
for work covered under this specifications pertain to excavation of foundations, trenches,
pits and over areas, in all sorts of soil, soft and hard rock, correct to dimensions given in the
drawing including shoring, protections of existing underground utilities of any, such as
water lines, electric cables etc. dewatering and shoring if necessary, stacking the useful
materials as directed within the lead specified, refilling around the foundation and into the
plinth with selected useful excavated earth and disposing off the surplus earth / materials
within specified lead and finishing the surface to proper levels, slopes and camber etc. all
complete.

Site Clearance:
Before the earth work is started the area coming under cutting and filling shall be
cleared of all obstruction, loose stones, shrubs, rank vegetation, grass, bushes and rubbish
removed up to a distance of 150 metres outside the periphery of the area under clearance.
This work is deemed to be included in the earthwork item rate and no separate payment will
be admissible.

Roots and Vegetation clearance:


The roots of trees if any shall be removed to a minimum depth of 60 cm below ground
level or a minimum of 30 cm below formation level whichever is lower and the hollows
filled up with earth leveled and rammed. This work is deemed to be included in the
earthwork items and no separate payment will be admissible for the work. Any material
obtained from the site will be the property of the Government of India and the useful
materials as decided by the Engineer-in-charge will be conveyed and properly stacked as
directed within the lead specified.

Setting out and making profiles:


Masonry or concrete pillars will be erected at suitable points in the area to serve as
benchmarks for the execution of the work. These benchmarks shall be connected with
G.T.S. or any other permanent benchmark approved by the Engineer-in-charge. Necessary
profiles with pegs, bamboos and strings or Burjis shall be made to show the correct
formation levels before the work is started. The contractor shall supply labour and materials
for setting out and making profiles and Burjis for the work at his own cost and the same
shall be maintained during the excavation work. The Department will show grid co-ordinate
or other reference points. It shall bethe responsibility of the contractor to set out center lines
correctly with reference to the drawings and install substantial reference marks. Checking of
such alignment by the Department will not absolve the contractor from his responsibility to
execute the work strictly in accordance with the drawings.

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 36


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

Excavation:
\ The contractor shall notify the Engineer-in-charge before starting excavation and
before the ground is disturbed, to enable him to take existing level for the purpose of
measurements. The ground levels shall be taken at 5 to 15 metres intervals in uniformly
sloping ground and at closer distance where local mounds, pits, or undulations are met with,
as directed by the Engineer-in-charge. Exceeding

Explain report on estimate for the construction of residential building.

Report On Estimates for the Construction of Residential Building. The detailed estimate for
construction of a residential building for the Executive Engineer at Udaynagar has been
prepared in compliance of S.E.’s letter no……………. dated…………………..

There is no building for the residence of the Executive Engineer at Udaynagar and he has to
live in a rented building with meager accommodation at a very high rent. It has, therefore,
been proposed to construct a residential building for the Executive Engineer. The head of
the accounts will be 50 civil original works, building.

The estimate provides for the following accommodation:


One drawing room, one dining room, three bed rooms, one guest room, and the necessary
store kitchen, baths, front and back verandahs and motor garage per plan enclosed.

A site has already been selected having a land of 60 m 30 m (200 100’) for the construction
of the building having good soil and proper drainage and this much of land has to be
acquired. The building shall be oriented to face north direction.

The building shall have lime concrete foundation and first class brick masonry with lime
mortar up to plinth level and the superstructure shall be of first class brick work in cement
mortar, 1 :6 Lintels shall be of R.B. work and roof shall be R.C.C with lime concrete terrace
finishing.

The drawing and dining rooms shall have mosaic floor and other rooms 2.5 cm(1‛) c.c. floor
over 7.5 cm (3‛) lime concrete. Inside and outside walls shall be 12 mm (1/2 ‚) cement line
plastered 1:1:6, and ceiling shall be 6 mm (1/2‛) cement plastered 1:3. Inside of drawing and
dining rooms shall be colour washed and inside of remaining rooms shallbe white washed
and outside wall be colour washed.

Doors and windows shall be 4.5 cm 13 4" thick teak wood with chaukhat o sal wood and
enamel painted. All work shall be strictly as per detailed P.W.D. Specification.

The estimate has been prepared at P.W.D Schedule of rates, and for non-schedule items
on analysis of rates. The foundation has been designed for a safe load of 9 tonne per sq m
(8 ton per sq ft) and the R.C.C roof has been designed for a safe load of 150 kg per sq m (30
1bs per sq ft) with 1400 kg per sqcm (20000 1bs per sq in) as sage tensile stress of steel and
50 kg sq cm (750 1bs per sq in) as safe compressive stress of concrete.

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 37


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

All designs and calculations have been included in the estimate. Plans and drawings
and site plans are also enclosed with the estimate.

Provision has been made for electrification and sanitary and water supply works and 20% of
the estimated cost of the building works ahs been included for these works. As there is no
sewer line in the area a septic tank shall have to be constructed for which lump sum
provision of Rs.700,00 has been made in the estimate.

Provision for compound with a gate in the front and barbed wire fencing on the sides and
back, and approach road have also been made in the estimate.

A statement of important materials as cement, steel, coal, etc., which shall have to be
arranged by the department is also enclosed with the estimate. A rent statement is also
enclosed.

The work shall be carried on contract by inviting tenders. The work shall be completed
within six months from the date of start.

Explain report on estimate fix construction of a culvert.

Report on Estimate for Construction of a Culvert:


The estimate has been prepared for the construction of an arch culvert of 3m span in 15 km-
300 m on Lucknow –Daulatpur road. The road at this point is flooded almost every year
during the rainy reason, causing flood and damages in the area. During the last
inspection the Executive Engineer has asked to prepare an estimate and this estimate has
been prepared in compliance of E.E’s letter no ………….dated …………….. the cost of
construction will be met from 50 civil work special repairs.

The culvert has been designed for I.R.A Class a loading. The catchment area has been
determined from the 2.5 cm (1‛) map of the area, which comes to 1200 acres, and the
water way has been calculated by the Talbot formula a –cA 3 4 , where a = waterway in sq.
ft , a= Catchment area in acres, and c= constant and has been taken as 0.2. All
calculation and design have been enclosed with the estimate.

The soil has been tested and has been found to be good, and ordinary spread foundation will
be sufficient. The foundation shall be of cement concrete 1:4:8 and abutments, wing
walls and parapets shall be of brick masonry in 1:5 cement mortar, the arch work shall be of
brick masonry in 1:3 cement mortar. Exposed surfaces shall be cement pointed 1:2. all
works shall be as per detailed P.W.D Specifications.

The estimate has been prepared at P.W.D Schedule of Rates. A statement of materials,
cement, bricks, coal, etc., required for the construction , has been enclosed with he estimate.
The work shall be executed on contract by inviting tenders and the work shall be started
after the rainy season and shall be completed within four month’s time.

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 38


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

UNIT IV CONTRACTS

CONTRACTS

Agreements between two entities, creating an enforceable obligation to do, or to refrain


from doing, a particular thing. Nature and Contractual Obligation The purpose of a
contract is to establish the agreement that the parties have made and to fix their rights
and duties in accordance with that agreement. The courts must enforce a valid contract
as it is made, unless there are grounds that bar its enforcement.

Statutes prescribe and restrict the terms of a contract where the general public is affected.
The terms of an insurance contract that protect a common carrier are controlled by
statute i n order to safeguard the public by guaranteeing that there will be financial
resources availa ble in the event of an accident.

The courts may not create a contract for the parties. When the parties have no express or
i mplied agreement on the essential terms of a contract, there is no contract. Courts are
only empowered to enforce contracts, not to write them, for the parties. A contract, in
order to be enforceable, must be a valid. The function of the court is to enforce
agreements only if t hey exist and not to create them through the imposition of such terms
as the court considers reasonable.

It is the policy of the law to encourage the formation of contracts between competent
parties for lawful objectives. As ageneral rule, contracts by competent persons, equitably
mad e, are valid and enforceable. Parties to a contract are bound by the terms to which
they hav e agreed, usually even if the contract appears to be improvident or a bad
bargain, as long as it did not result from Fraud, duress, or Undue Influence.

The binding force of a contract is based on the fact that it evinces a meeting of minds of
t wo parties in Good
Faith. A contract, once formed, does not contemplate a right of a party to reject it.
Contrac ts that were mutually entered into between parties with the capacity to contract
are binding

CONTRACT FOR LABOUR, MATERIAL, DESIGN, CONSTRUCTION

LABOUR CONTRACT

In labour contract the contractor undertakes contract for the labour portion. All materials
for the construction are arranged and supplied at the site of work by the department or
owner, the labour contractor engages labour and gets the work done according to
specifications. The contract is on item rate basis for labour portion only and contractor is
paid for the quantities of work done on measurement of the different items of work at the
stipulated rate in the contract agreement. Materials for scaffolding, centering and
stuttering and other similar materials are supplied by the department' or owner,

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 39


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

contractor may also use his own materials for scaffolding, centering and shuttering, etc.,
if provided in the agreement. Contractor uses his own tools for working, but plants and
machineries are arranged by the department or owner. An agreement with all conditions
of contract, rates, bill of quantities, etc., is prepared before the works given out to the
contractor. This system of contract is not generally adopted in the Government
department. Private buildings are however constructed by labour contract system which
is less trouble some.

MATERIAL CONTRACT

In material contract the contractor undertakes contract for the material portion. All
materials for the construction are arranged and supplied at the site of work by the
contractor, the material contractor engages material land gets the work done according to
specifications. The contract is on item rate basis for material portion only and contractor
is paid for the quantities of material the different items of work at the stipulated rate in
the contract agreement. Materials for scaffolding, centering and stuttering and other
similar materials are supplied by the contractor, contractor may also use his own
materials for scaffolding, centering and shuttering, etc., if provided in the agreement.
Contractor are arranged the tools and plants and machineries. An agreement with all
conditions of contract, rates, etc., is prepared before the works given out to the
contractor. This system of contract is not generally adopted in the Private buildings are
however constructed by material contract system which is less trouble some.

DESIGN CONTRACT

Design and Build procurement works on the basis that the main contractor is
responsible for undertaking both the design and construction work on a project, for an
agreed lump-sum price. Design and build projects can vary depending on the extent of
the contractor’s design responsibility and how much initial design is included in the
employer’s requirements.
Nevertheless, the level of design responsibility and input from the contractor is much
greater on design and build projects than a traditional contract with a contractor’s
designed portion. Adequate time must be allowed to prepare the employer’s
requirements (the employer usually appoints consultants to facilitate this), as well as
time for the contractor to prepare their proposal and tender price. It is vital that the
proposal matches all of the employer’s requirements before any contract is entered into.
The employer has control over any design elements of the project that are included in
their requirements, but once the contract is let responsibility over design passes to the
contractor, so the employer has no direct control over the contractor’s detailed design.
The contractor can carry out the design in a number of ways. Often they will appoint
their own consultants or use their own in-house team. It is also common practice for the
contractor to take on the employer’s consultants and continue to use them to complete
the detailed design under what is known as a novation agreement. Other Features of
Design and Build Procurement As design and construction can be carried out in

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 40


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

parallel, the overall programme time of design and build projects can be shorter.
However this depends on how much design the contractor is responsible for There is
reasonable certainty over costs because the contract price is known at the outset.
Provided the employer does not order changes during the construction of the work,
the contractor will be obliged (subject to the conditions) to complete the project for the
contract sum. If the employer does require design or specification changes during the
construction period, the contractor advises as to the effect this may have on costs or
additional time needed. Design and Build is a relatively low risk procurement option for
the employer, in terms of cost and time. There can be a risk related to design and quality,
particularly if the employer’s requirements were not properly gathered and if insufficient
time went into examining the contractor’s proposal.

CONSTRUCTION CONTRACTS

A variety of factors make a construction contract different from most other types of
contracts. These include the length of the project, its complexity, its size and the fact that
the price agreed and the amount of work done may change as it proceeds. The structure
may be a new building on virgin ground. It may involve the demolition of an existing
building and its full reconstruction. It could involve partial demolition and rebuilding, or
the refurbishment and extension of an existing building or structure.
This may be mostly below ground (in which case it is engineering) or above ground
(in which case it is building). Building, however, includes foundations and other
underground works. A building contract can consist of activities and services carried out
both above and below ground. n entire contract for the sale of goods and work and labour
for a lump sum price payable by instalments as the goods are delivered and the work
done. Decisions have to be made from time to time about such essential matters as the
making of variation orders, the expenditure of provisional and prime cost sums and
extension of time for the carrying out of the work under the contract.’
It is important to realize that Lord Dip lock was referring to a contract made using a
standard form of building contract. Such contracts usually make provision for interim
payments at regular intervals as the work proceeds, whereas a contract that is described as
entire is a product of the common law. It may make provision for stage payments, but in
essence, it requires the contractor to complete all its work before any entitlement to
payment arises.

CONTRACT PROBLEMS

Contract problems can arise if unclear terms and conditions are set out in the
documentation, or the responsibilities for the contractor or other party aren't clearly
defined. Resultantly, either party might not be willing to fulfill their side of the
agreement, leading to possible problems.

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 41


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

DRAFTING OF CONTRACT DOCUMENTS BASED ON IBRD / MORTH


STANDARD BIDDING DOCUMENTS IBRD

This Standard Bidding Document for Procurement of Goods has been prepared for
use in contracts financed by the International Bank for Reconstruction and Development
(IBRD) and the International Development Association (IDA) to be used for the
procurement of goods through International Competitive Bidding (ICB) in the projects
that are financed in whole or in part by the World Bank.
They are consistent with the January 2011 Guidelines for Procurement of Goods,
Works and NonConsulting services under IBRD Loans and IDA Credits & Grants by
World Bank Borrowers.
These Bidding Documents for Procurement of Goods, assumes that no
prequalification has taken place before bidding. To obtain further information on
procurement under World Bank-assisted projects or for question regarding the use of this
SBD, contact:

PART 1 – BIDDING PROCEDURES

Section I. Instructions to Bidders (ITB) This Section provides information to help


Bidders prepare their bids. Information is also provided on the submission, opening, and
evaluation of bids and on the award of Contracts. Section I contains provisions that are
to be used without modification.
Section II. Bid Data Sheet (BDS) This Section includes provisions that are specific
to each procurement and that supplement Section I, Instructions to Bidders.
Section III. Evaluation and Qualification Criteria This Section specifies the criteria
to determine the lowest evaluated bid and the qualifications of the Bidder to perform the
contract.
Section IV. Bidding Forms This Section includes the forms for the Bid Submission,
Price Schedules, Bid Security, and the Manufacturer’s Authorization to be submitted
completed by the Bidder and submitted as part of his Bid.
Section V. Eligible Countries This Section contains information regarding eligible
countries.
Section VI. Bank Policy – Corrupt and Fraudulent Practices This Section provides
the Bidders with the reference to the Bank’s policy in regard to corrupt and fraudulent
practices applicable to this process.

PART 2 – SUPPLY REQUIREMENTS

Section VII. Schedule of Requirements This Section includes the List of Goods and
Related Services, the Delivery and Completion Schedules, the Technical Specifications
and the Drawings that describe the Goods and Related Services to be procured.

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 42


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

PART 3 – CONDITIONS OF CONTRACT AND CONTRACT FORMS

Section VIII. General Conditions of Contract (GCC) This Section includes the
general clauses to be applied in all contracts. The text of the clauses in this Section shall
not be modified.
Section IX. Special Conditions of Contract (SCC) This Section consists of Contract
Data and Specific Provisions which contains clauses specific to each contract. The
contents of this Section modify or supplement, but not over-write, the General
Conditions and shall be prepared by the Purchaser.
Section X. Contract Forms This Section contains forms which, once completed,
will form part of the Contract. The forms for Performance Security and Advance
Payment Security, when required, shall only be completed by the successful Bidder after
contract award. Attachment: Invitation for Bids An “Invitation for Bids” form is
provided at the end of the Bidding Documents for information.

MORTH

1.This Tender Document (“Tender Document”) is being issued by The Automotive


Research Association of India ( ARAI ) on behalf of Ministry of Road Transport&
Highways (MoRTH) for the selection of a successful bidder for delivery, installation,
integration of systems and system checking, testing and commissioning of Vehicle
Inspection Equipment’s at the Centers, supply of special tools, and requisite software for
smooth operation of the Centers. Design, construction & civil work of equipment
foundations including allied services like test shed tri mix flooring, epoxy coating for the
flooring, conducting for cables including 3 phase & Single phase cables &drainage,
compressor piping will also be scope of the bidder. The suitable exhaust gas handling
system is to be selected & supplied, installed & commissioned by the bidder. Bidder
should also provide fresh air ducting for all underbody inspection pits. Further, these
Centers should also be operated, initially for a period of 24 months, after the Centers are
commissioned which includes, but not limited to, regular maintenance of the
equipment’s, providing all necessary consumables. The Bidder should be responsible for
Operating the Centers with Technicians, Supervisors and operators for complete in-
use vehicle tests, including all tests mentioned in CMVR. Additional tests, if any,
required by the executing agency for ensuring optimum safety and emission performance
of inuse vehicles shall also be per formed. (The above is hereinafter collectively referred
to as the “Works”).

2. The information contained in this Tender Document is being provided for the
limited purposes of enabling the interested parties (“Bidders”) to submit a binding
proposal (“Bid”) for performing, executing and implementing the Works and for no
other purpose. In no circumstances shall executing agencies, or their employees,
advisers, consultants, contractors, servants and/or agents incur any liability arising out of
or in respect of the issue of this Tender Document, or the selection procedure.

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 43


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

3. The possession of the Tender Document or use in any manner contrary to any
applicable law is expressly prohibited. The Bidders shall inform themselves and shall
observe any applicable legal requirements.

4. The information does not purport to be comprehensive or to have been


independently verified. Nothing in this Tender Document shall be construed as legal,
financial or tax advice. MoRTH will not be liable for any costs, expenses, however so
incurred by the Bidders in connection with the preparation and submission of the Bids.

5. MoRTH reserves the right to amend this Tender Document and any information
contained herein at any time to the Bidders. The amendment document shall be notified
through website and such amendments shall be binding on those concerned.

6. Nothing in this Tender Document is, nor shall be relied upon as, a promise or
representation as to MoRTH ultimate decision in relation to the selection process of the
successful Bidder for the execution of the Contract (defined hereinafter). The Bidder(s)
shall not, therefore, assume that they will have the opportunity to revise their Bids
following submission except as provided in this Tender Document, without assigning
any reason whatsoever. However, MoRTH reserves the right to change the basis of or
the procedures (including the timetable) relating to the bidding process, reject any, or all,
of the Bids, not to invite a Bidder to proceed further, not furnish a Bidder with additional
information nor otherwise to negotiate with a Bidder at any time. MoRTH does not
undertake to accept the lowest or indeed any Bid, without assigning any reason.

7. No person other than the one authorized by MoRTH to give any information or
to make any representation not contained in this Tender Document and, if given or made,
any such information or representation shall not be relied upon as having been so
authorized.

8. Canvassing in any form shall result in rejection of the bid.

9. The applicant shall be deemed to have duly considered all terms of this Invitation
for the bid document and acknowledge that it intends to submit bid offer in accordance
with the provisions of this document having accepted the terms and conditions as have
been incorporated herein and / or that may be incorporated by MoRTH through any
Addendum/s.

10. This Tender Document is confidential and personal to each Bidder. The Bidders
shall note that they are required to sign and submit as part of the Technical Bid, as
provided in “Form b) Letter of Undertaking” of this Tender Document, a Letter of
Undertaking to MoRTH which, inter alia, prohibits disclosure of any information as
therein defined to any person or body corporate except as permitted by such Letter of
Undertaking. The Bidders shall promptly return this Tender Document to MoRTH upon

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 44


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

request and shall not use the same for any purpose whatsoever other than for submission
of the Bid to MoRTH for the Works. Any failure to furnish or comply with the terms of
the Letter of Undertaking shall entitle MoRTH to disqualify the relevant Bidder.

12. MoRTH its employees, advisers, consultants, contractors, servants, agents do


not accept any responsibility for the legality, validity, effectiveness, adequacy or
enforceability of any documentation executed, or which may be executed, in relation to
the Works. MoRTH or the other executing agencies shall enter into a contract
individually, with the successful Bidder for performance, execution and implementation
of the Works (“Contract”). No legal or other obligation shall arise between the
successful Bidder and MoRTH and / or executing agencies unless and until the Contract
has been formally executed by MoRTH and / or executing agencies and the successful
Bidder and any conditions precedent to the effectiveness of the Contract have been
fulfilled. MoRTH reserves the right not to proceed with the bidding process and to
cancel the selection procedure, or any part thereof, at any time.

13. Nothing in this Tender Document shall constitute the basis of the Contract
which may be concluded in relation to performance, execution and implementation of
the Works nor shall such documentation/information be used in construing the Contract.
Each Bidder must rely on the terms and conditions contained in the Contract, when, and
if, finally executed, subject to such limitations and restrictions which may be specified in
such Contract. Any reference to this Tender Document in the Contract with MoRTH or
any correspondence between MoRTH and the Bidder shall not be construed as this
Tender Document forming part of such contract.

14. The Bidder is prohibited from any form of collusion or arrangement by a Bidder
(or its advisers or consultants) in an attempt to influence the selection and award process.
Giving or offering of any gift, bribe or inducement or any attempt to any such act on
behalf of the Bidder towards any officer / employee of MoRTH or to any other person in
a position to influence the decision of MoRTH or any other person associated with the
bidding process, for showing any favour in relation to this Bid or any other contract,
shall render the Bidder to such liability / penalty as MoRTH may deem including but not
limited to rejection of the Bid and forfeiture of the Earnest Money Deposit.

15. Laws of the Republic of India are applicable to this Tender Document. The
courts at New Delhi shall have exclusive jurisdiction in relation to any disputes arising
from this Tender Document.

16. Each Bidder’s acceptance of delivery of this Tender Document constitutes its
agreement to, and acceptance of, the terms set forth in this Disclaimer. By acceptance of
this Tender Document, the recipient agrees that this Tender Document and any
information herewith supersedes document(s) or earlier information, if any, in relation to
the subject matter hereof.

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 45


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

17. All documents and communication will be in English only. Any document
which is submitted in any other language, other than English will be acceptable only if
accompanied by self- certified English translated version. MoRTH will have the right to
verify the same independently.

18. A High Level Committee ( HLC ) is appointed by the MoRTH for their
assistance to take final decisions on all important matters pertaining to this project. The
committee consists of –
(i) Representative of ARAI – Chairperson
(ii) Representative of CIRT – Member
(iii) Representative of ICAT – Member
(iv) Representative of Transport Department, Odisha – Member
(v) Representative of Transport Department, Maharashtra - Member

19. Arbitration: The disputes or differences, arising from this Invitation for bid
document or in any manner connected therewith shall be subject to the following dispute
resolution mechanism
(i) Any dispute shall initially be referred to the designated Senior Management of
the parties for amicable settlement. Parties shall nominate two persons each from their
Senior Management within ten days of a dispute arising.
(ii) If no amicable settlement is arrived at within 30 days, then any party may refer
the dispute to a Sole Arbitrator to be nominated by the MoRTH. The place of arbitration
shall be New Delhi. All arbitration proceedings shall be conducted in English and in
accordance with the provisions of the Arbitration and Conciliation Act 1996 as amended
from time to time.
(iii) The Arbitration award will be final and binding upon the parties, and each
party will bear its own costs of arbitration and equally share the fees of the arbitral
tribunal unless the arbitral tribunal decides otherwise.
(iv) All disputes shall be subject to the exclusive jurisdiction of Courts at New
Delhi only.

20. Governing Law

ARBITRATION :

Arbitration is a procedure in which a dispute is submitted, by agreement of the parties,


to one or more arbitrators who make a binding decision on the dispute. In choosing
arbitration, the parties opt for a private dispute resolution procedure instead of going to court.

Its principal characteristics are:

 Arbitration is consensual

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 46


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

Arbitration can only take place if both parties have agreed to it. In the case of future disputes
arising under a contract, the parties insert an arbitration clause in the relevant contract. An
existing dispute can be referred to arbitration by means of a submission agreement between
the parties. In contrast to mediation, a party cannot unilaterally withdraw from arbitration.

The parties choose the arbitrator(s)

Under the WIPO Arbitration Rules, the parties can select a sole arbitrator together. If they
choose to have a three-member arbitral tribunal, each party appoints one of the arbitrators;
those two persons then agree on the presiding arbitrator. Alternatively, the Center can suggest
potential arbitrators with relevant expertise or directly appoint members of the arbitral
tribunal. The Center maintains an extensive roster of arbitrators ranging from seasoned
dispute-resolution generalists to highly specialized practitioners and experts covering the
entire legal and technical spectrum of intellectual property.

Arbitration is neutral

In addition to their selection of neutrals of appropriate nationality, parties are able to choose
such important elements as the applicable law, language and venue of the arbitration. This
allows them to ensure that no party enjoys a home court advantage.

Arbitration is a confidential procedure

The WIPO Rules specifically protect the confidentiality of the existence of the arbitration,
any disclosures made during that procedure, and the award. In certain circumstances, the
WIPO Rules allow a party to restrict access to trade secrets or other confidential information
that is submitted to the arbitral tribunal or to a confidentiality advisor to the tribunal.

The decision of the arbitral tribunal is final and easy to enforce

Under the WIPO Rules, the parties agree to carry out the decision of the arbitral tribunal
without delay. International awards are enforced by national courts under the New York
Convention, which permits them to be set aside only in very limited circumstances. More
than 165 States are party to this Convention.

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 47


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

UNIT V VALUATION

1. A property fetches a net income of Rs.900.00 deducting all outgoings. Workout the
capitalized value of the property if the rate of interest is 6% per annum.
Year’s purchase = 100/6 = 16.67
Capitalized value of the property = net income x Y.P
= 900 x 16.67 = Rs.15003.00

2. Find the plinth area required for the residential accommodation for an assistant
Engineer in the pay scale of Rs.400.00 to 1,000 per month.

Average pay = 400+1000 /2 = Rs.700/month

Average month rent @10% of salary = 700.00/10 = Rs.70.00

Average annual rent 70.00 x 12 = Rs. 840.00

Capital cost of the building @ 6% interest = 840 x 100 / 6 = Rs.14000.00

Plinth area required @ Rs.150.00 per sq.m of

plinth area = 14000/150 = 93.33sq.m

Normally the quarters for the assistant engineer should be constructed at the cost of
Rs.14000.00 having plinth area of 93.33 sq.m.

But due to the increase in the cost of construction, this may be increased by 100% and
the capital cost of construction may be fixed as Rs.28,000.00 and the approximate plinth
areas of 93.33

Methods for calculating depreciation

Straight line Method


Constant percentage method Sinking Fund Method Quantity Survey Method Straight
Line Method In this method, it is assumed that the property losses its value by the same
amount every year. A fixed amount of the original cost is deducted every year, so that at
the end of the utility period, only the scrap value is left.
Annual Depreciation, D = (original cost of the asset – Scrap Value)/life in years

Constant Percentage Method or Declining balance Method


In this method, it is assumed that the property will lose its value by a constant

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 48


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

percentage of its value at the beginning of every year.


Annual Depreciation, D = 1-(scrap value/original value)1/life in year

Quantity Survey Method


In this method, the property is studied in detail and loss in value due to life, wear and
tear, decay, and obsolescence etc, worked out. Each and every step is based is based on
some logical grounds without any fixed percentage of the cost of the property. Only
experimental valuer can work out the amount of depreciation and present value of a
property by this method.

3. Govt. accommodation is built at the cost of Rs. 60,000/- . The water supply and

sanitary and electrical installation expenditure is Rs. 15000/-. Calculate the standard

rend of the building if the following rate of return are fixed: 6% on construction cost.

1 1/2 % towards maintenance of buildingwork, 4 1/2 % on installation expenditure. v.

4% on maintenance of installation. Rs. 120/- as property tax per year Cost of land is be

neglected.

Solution:

(a) (i) Return on construction cost = = Rs. 3600/-

(ii) Return on installation cost = = Rs. 675/-

(iii) Cost of maintenance of building = = Rs. 900/-

(iv) Cost of maintenance of installations = = Rs. 600/-

(v) Property tax = Rs. 120/-Gross return = Rs.5895/- Standard rent = Gross rent/12 = =

Rs. 491.25 P.M. (Per Month).

c) Standard rent is also equal to 6% of capital value

Capital value Construction cost = Rs. 60,000.00

Installation cost = Rs. 15,000.00 Total = Rs. 75000.00

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 49


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

Standard rent = = 4500/- per year

Methods of Valuation of Buildings and Properties

Following are the different methods of valuations of the property:

1. Rental Method of Valuation


2. Direct comparison with capital value
3. Valuation based on profit
4. Valuation based on cost
5. Development method of valuation
6. Depreciation method of valuation

1. Rental Method of valuation

In this method, net income from the building is calculated by deducting all the outgoings

from gross rent. Year’s purchase (Y.P.) value is calculated by assuming a suitable rate of

interest prevailing in the market. For example, consider a rate of interest as 5%, the Year’s

Purchase = 100/5 = 20 years.

The net income multiplied by the year's purchase gives the capitalized value or the valuation

of the property. This method is used only when the rent is known or probable rent is

determined by enquiries.

2. Direct Comparison with Capital Value

When the rental value is not known, this method of direct comparison with the capital value

of a similar property of the locality is used. In this case, the valuation of the property is

fixed by direct comparison with the valuation or capitalized value of similar property in

the locality.

3. Valuation based on Profit

This method of valuation is suitable for commercial properties such as hotels, restaurants,

shops, offices, malls, cinemas, theaters etc. for which the valuation depends on the profit.

In such cases, the net annual income is used from the valuation after deducting all the

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 50


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

outgoings and expenses from the gross income. The valuation of building or property is

found by multiplying the net income by year’s purchase. The valuation, in this case, can

be too high in comparison with the actual cost of construction.

4. Valuation based on Cost

In this case, the actual cost of construction of the building or the cost incurred in possessing

the building is considered as the basis to determine the valuation of the property. In this

case, necessary depreciation is allowed and points of obsolescence are considered.

5. Development method of valuation

This method is suitable for properties which are under the developmental stage. For example,

if a large place of land is to be divided into plots after provision for roads and other

amenities, this method is used. The probable selling price of the plots, the area required for

amenities and other expenditures for development is considered for valuation.

Development method of valuation is also used for properties or buildings which are required

to be renovated by making alterations, additions, improvements etc. The value is

calculated based on the anticipated net income generated from the building after

renovation work is complete.

The net income multiplied by year’s purchase gives the valuation of the property. The actual

cost of the property with a total cost of renovation shall be compared with the anticipated

value of the property to decide if the renovation is justified.

6. Depreciation Method of Valuation

Based on the depreciation method, the valuation of the buildings is divided into four parts:

1. Walls
2. Roofs
3. Floors

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 51


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

4. Doors and windows

Cost of each part at the present rate is calculated based on detailed measurement. The life of

each part is calculated by the formula:

D = P [(100 – rd)/100)]n

where,

D = depreciated value

r = rate

d = depreciation

n = age of building in years

rd values are considered as per following table:

Life of Building rd

100 years 1.0

75 years 1.3

50 years 2.0

25 years 4.0

20 years 5.0

The valuation calculated is exclusive of the cost of land, amenities, water supply, electrical

and sanitary fittings etc. and is used only for buildings which are well maintained. If it is not

well maintained, then suitable deductions are considered in the valuation calculated above.

The present values of the land, amenities, water supply, electrical and sanitary fittings should

be added to find the valuation of the property.

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 52


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

Mortgages

A mortgage is a type of loan used to purchase or maintain a home, land, or other


types of real estate. The borrower agrees to pay the lender over time, typically in a series of
regular payments that are divided into principal and interest. The property then serves
as collateral to secure the loan.

Types of Mortgages

Fixed-Rate Mortgages
The standard type of mortgage is fixed-rate. With a fixed-rate mortgage, the interest
rate stays the same for the entire term of the loan, as do the borrower's monthly payments
toward the mortgage. A fixed-rate mortgage is also called a traditional mortgage.

Adjustable-Rate Mortgage (ARM)


With an adjustable-rate mortgage (ARM), the interest rate is fixed for an initial term, after
which it can change periodically based on prevailing interest rates. The initial interest rate is
often a below-market rate, which can make the mortgage more affordable in the short term
but possibly less affordable long-term if the rate rises substantially.

Interest-Only Loans
Other, less common types of mortgages, such as interest-only mortgages and payment-
option ARMs, can involve complex repayment schedules and are best used by sophisticated
borrowers. These types of loans may feature a large balloon payment at its end.

Reverse Mortgages
As their name suggests, reverse mortgages are a very different financial product. They are
designed for homeowners age 62 or older who want to convert part of the equity in their
homes into cash.

Difference between Mortgage and Lease:

1. Meaning:

Mortgage is nothing but a legal agreement by which a bank, building society


(creditor), etc lends money at interest in exchange for taking title of the debtor’s property,
with the condition that the conveyance of title by the debtor to the creditor becomes void
once the debt is fully paid off.While a lease is a contractual arrangement calling for the lessee
(user) to pay the lessor (owner) for use of an asset. Property, buildings and vehicles are
common assets that are leased. Industrial or business equipment is also leased.

2. Parties:

The mortgage is an agreement between two parties, (i.e. the lender and the borrower)
the borrower gives assurance to the lender to transfer the right to the immovable property for
the security purpose. While under a lease agreement is a contract between two parties, the

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 53


ESTIMATION COSTING AND VALUATION ENGINEERING CE8701

less or and the lessee. The less or is the legal owner of the asset; the lessee obtains the right to
use the asset in return for regular rental payments.

3. Purpose:

Under Mortgage, the mortgaging bank has an interest - and a primary lien - on the
property; it is technically of the borrower. He owns it. His name is on the deed. While Lease,
is merely renting of property. Lessees do not own it and the deed does not have name on it.

4. Consideration:

In Mortgage consideration in terms of Mortgage money is given. While on the other


hand, in Lease consideration in terms of Lease Rent is given.

5. Essential Documents:
The terms and condition of the Mortgage is prescribed under “Mortgage deed.” While
on the other hand, all the terms and conditions of the Lease are given under the deed known
as “Lease Deed.”

6. Rights Assigned:
If borrower so decide, he can sell a mortgaged property. The mortgage balance will be
paid off at the closing transaction, but the right to sell is borrower’s alone. And once the
mortgage is paid, the bank's interest in the property ceases to exist, so if borrower pay off the
mortgage he own the property free and clear, although he will still have to pay property taxes.
But on the other hand, lessee cannot simply decide to sell a property because it is merely a
lease. He can, perhaps, sell a remainder interest in a long term lease, without the property
owner's consent, as long as the wording of the lease conveyed that right to Lessee.

NAVANEETHA KRISHNAN C,, Dept. of Civil, MSAJCE Page 54