Plant Components Functionality Data Collection File
Plant Components Functionality Data Collection File
Bad Bearings
High Vibration Defect Bearings/Gears Failure Conditioning,Misalignment and Vibration Analysis
Gearbox Soft Foot
Mal-Lubrication and Inactive
Overheating Bearings/Gears Failure Cooling fans and Oil analysis
cooling
Bad Bearings
High Vibration Defect Bearings/Gears Failure Conditioning,Misalignment and Vibration Analysis
Pinion Gear Soft Foot
Mal-Lubrication and Inactive
Overheating Bearings/Gears Failure Cooling fans and Oil analysis
cooling
Girth Gear High Vibration Defect Bearings/Gears Failure Misalignment and Looseness Vibration Analysis
12-ML-02 Drive Motor Communication loss Mill unable to run Instrumentation error
Bad Bearings
High Vibration Defect Bearing Failure/Seizure Conditioning,Misalignment
and Soft Foot
Bad Bearings
High Vibration Defect Bearings/Gears Failure Conditioning,Misalignment
12-ML-02 Gearbox and Soft Foot
Overheating Bearings/Gears Failure Mal-Lubrication
Bad Bearings
High Vibration Defect Bearings/Gears Failure Conditioning,Misalignment
12-ML-02 Pinion Gear and Soft Foot
Overheating Bearings/Gears Failure Inactive cooling
Misalignment and
High Vibration Defect Bearings/Gears Failure
Looseness
12-ML-02 Girth Gear
Mal-Lubrication/Faulty
Overheating Gears Failure
grease system
Contaminated Oil and Bad
High Vibration Defect Bearings Failure
12-ML-02 Trunnion Bearings Bearings Condition
Overheating Bearings Failure Mal-Lubrication
Inspection and
Preventive Quarterly
Replacement
150 152 1.5 0.5
Inspection ,retightening
Preventive Quarterly
and Replacement
Contributing Factors to Actions
Availability Identified Gaps/Challenges
Gaps/Challenges Recommended
NA NA NA
NA NA NA
NA NA NA
NA NA NA
91% 91%
NA NA NA
NA NA NA
91% 91%
NA NA NA
NA NA NA
91% 91%
NA NA NA
NA NA NA
91% 91%
Greasing system replacement Defective Proximity Replace Proximity
plan sensor sensor quarterly
NA NA NA
91% 91%
NA NA NA
91% 91% NA NA NA
NA NA NA
91% 91%
Non-optimal Design Broken bolts Redesign anchorage
Run-to-failure
Preventive
Predictive
Weekly
Monthly
Quarterly
Bi-Yearly
Yearly
3years
>3years