This document is a control plan for producing part number 2167241.6. It outlines three key processes: bobbin assembly, coil winding, and automatic assembly. Each process lists the characteristics and parameters that will be controlled, inspected, and the actions to be taken if specifications are not met. The plan identifies equipment, tools, inspection methods, sample sizes, frequencies, and reaction plans to ensure quality control during production. N.D. Tam of YTG Vina.co.,Ltd is identified as the key contact.

Uploaded by

ducthangspkt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views

Isir - (00003)

This document is a control plan for producing part number 2167241.6. It outlines three key processes: bobbin assembly, coil winding, and automatic assembly. Each process lists the characteristics and parameters that will be controlled, inspected, and the actions to be taken if specifications are not met. The plan identifies equipment, tools, inspection methods, sample sizes, frequencies, and reaction plans to ensure quality control during production. N.D. Tam of YTG Vina.co.,Ltd is identified as the key contact.

Uploaded by

ducthangspkt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

CONTROL PLAN

Prototype Pre-launch Production Key Contact/Phone Date(Orig.) Date(Rev.)


N.D.Tam PTT (+84964665109) 30 Oct, 2019 30 Oct, 2019
Control Plan Number CP-B241-00 Rev' contents : Release product in YTG Vina
Part Number/Latest Change Level Core Team Customer Engineering Approval/Date(If Req'd)
2167241.6 N.D.Tam/ T.D.Long/ N.B.Duong/ Kim S.H/ N.V.Hoang/Mr GD
Part Name/Description Supplier/Plant Approval/Date Customer Quality Approval/Date(If Req'd)
SIGMA MONOCOIL YTG Vina.co.,Ltd. _N.D.Tam / 28Nov'19
Supplier/Plant Supplier Code Other Approval/Date(If Req'd) Other Approval/Date(If Req'd)
YTG Vina.co.,Ltd. / 10Nov'19
Charateristics Methods
Part/ Machine, Device, Special Sample
Process Name / Product/Process Evaluation
Process Jig, Tools Char. Reaction Plan
Operation Description No. Product Process Specification/ Measurement Control Method
Number For Mfg. Class. Size Freq.
Tolerance Technique
#01 Bobbin
2EA/Cav
Coil
Resin
Inspection Standards Incoming Inspection Standards Reference n=6 Lot Inspection Report Return or sorting
Terminal
Ring
n=8
Amature

#10 Inserting Terminal into Bobbins Auto Inserting M/C 1 Air Pressure 0.4 ~ 0.6 Mpa pressure gauge 1 First Check Sheet Adjust

2 Appearance No defects Visual 100% 100% Daily Work Report Scrap

#20 Winding Coil Auto Winding M/C 1 Air Pressure 0.5 ~ 0.7 Mpa pressure gauge 1 First Check Sheet Adjust

2 Coil Turns 2,820±1 Turn control panel 1 First Check Sheet Adjust

3 Coil Type 2 EIW - Ø0.26 Label 1 First Check Sheet Adjust

4 Program NO. #110 Winding program 1 First Check Sheet Adjust

First,
5 Tension 175~200g Tension meter n=shaft Daily Work Report Scrap
Middle, End

First,
6 Resistance after wind'g 64.80~68.85Ω Resistance Tester n=shaft Daily Work Report Scrap
Middle, End

7 Appearance No defects Visual 100% 100% Daily Work Report Scrap

Charateristics Methods
Part/ Machine, Device, Special Sample
Process Name / Product/Process Evaluation
Process Jig, Tools Char. Reaction Plan
Operation Description No. Product Process Specification/ Measurement Control Method
Number For Mfg. Class. Size Freq.
Tolerance Technique
#30 Automatic Assembly & Automatic Assembly M/C 1 Air Pressure 0.4~0.6 Mpa pressure gauge 1 First Check Sheet Adjust

Resistance Inspection 2 Welding Parameter Standards Reference 1 First Check Sheet Adjust

SQZ(mS) 500±100 Current(A/set) 2800~3200 2900~3300


Spot HLD(mS) 500±100 Limit(%) 5 -5
MC 1 Time(mS) 30±10 60±10 20±10 35±10 65±10
U1 H1 Co U2 H2

SQZ(mS) 500±100 Current(A/set) 3000~3400 3100~3500


Spot HLD(mS) 500±100 Limit(%) 5 -5
MC 2 Time(mS) 30±10 60±10 20±10 35±10 65±10
U1 H1 Co U2 H2
Welding Tip Change
3 Every 20,000 Times counter 1 First Check Sheet Adjust
Frequency

4 Pressure Force 20 ~ 30 Kgf Indicator 1 First Check Sheet Adjust

5 Mater Check Surge Master Surge Tester 1 First Check Sheet Adjust

6 Surge Test 2,040V / Max 10% Surge Tester 100% 100% Daily Work Report Scrap

Resistance Inspection 7 Resistance Inspection 64.80~68.85Ω Resistance Tester 100% 100% Daily Work Report Scrap

8 Visual 100% 100% Daily Work Report Scrap


No defects
Appearance
(In good wire position) First,
9 De-cap n=2 Daily Work Report Scrap
Middle, End

Material(Resin)
#40 Outer Injection Injection Molding M/C 1 100℃±10℃ / Min 4 HR Unitcontroller 1 First Check Sheet Adjust
Dry Temperature

2 Mold Temperature 60℃±10℃ thermometer 1 First Check Sheet Adjust

Injection Mold
3 Injection parameter Reference Display 1 First Check Sheet Adjust
Parameter
Classification Pres (㎪ ) Speed(%) Position
Injection 1 60~70 60~70 20~30
Injection 2 50~60 50~60 15~25
Injection 3 40~50 40~50 15~25
Injection Injection 4 40~50 40~50 15~25
Injection 5 40~50 40~50 15~25
Holding 1 5~10 5~10 Time:1~2s
℃ Holding 2 5~10 5~10 Time:1~2s
NOZZLE Cylinder 1 Cylinder 2 Cylinder 3
Temp.( )
270~285 270~285 270~285 270~285
Heat 1 Heat 2 Mold temp
Hot runner
250~260 250~260 50~70
Time Cooling
Time(s) 1.0~2.0 15~30.0sec
injection time
Purge 70~75mm SuckBack 80~88mm

4 Material PP+GF30% / Black Tag 1 First Check Sheet Adjust

Water Absorption
5 Water Absorption Max 0.05 % 1 First Check Sheet Adjust
Tester

6 Appearance No defects Visual 100% 100% Daily Work Report Scrap

First,
7 Bobbin Inner diameter C Ø12.22 +0.1/-0.12mm Go/No gauge n=cav Daily Work Report Scrap
Middle, End

First,
8 Height 29.6±0.1mm Calipers n=cav Daily Work Report Scrap
Middle, End

#50 Performance Test Performance Tester 1 Air Pressure 0.4~0.6 Mpa pressure gauge 1 First Check Sheet Adjust

2 TML Height 10.15 +0.3/-0mm OK/NG Master 1 First Check Sheet Adjust

3 Resistance Inspection 64.80~68.85Ω OK/NG Master 1 First Check Sheet Adjust

Final Inspection Packing standard 4 Master sample Surge Test 2,040V / Max 10% OK/NG Master 1 First Check Sheet Adjust

Packing 5 Current leakage 1,800V/ 50Hz / Max 0.75mA OK/NG Master 1 First Check Sheet Adjust

6 Earth Insulation Test 500V / Min 10㏁ OK/NG Master 1 First Check Sheet Adjust

7 TML Height 10.15 +0.3/-0mm Linear gauge 100% 100% Daily Work Report Scrap

8 Resistance Inspection 64.80~68.85Ω Resistance Tester 100% 100% Daily Work Report Scrap

9 Surge Test 2,040V / Max 20% Surge Tester 100% 100% Daily Work Report Scrap

10 Current leakage 1,800V/ 50Hz / Max 0.75mA Insulation Tester 100% 100% Daily Work Report Scrap

11 Earth Insulation Test 500V / Min 10㏁ Insulation Tester 100% 100% Daily Work Report Scrap

First,
12 Hole Diameter C Ø12.22 +0.1/-0.12mm Go / No Gauge n=cav Daily Work Report Scrap
Middle, End

13 Appearance No defects Visual 100% 100% Daily Work Report Scrap

14 Packing No defects Packing standard 100% Lot Daily Work Report Scrap

#60 Process: Out going inspection


1 Final Inspection Standard Reference Inspection Report -