Project List NPG 03022023

The document lists 56 proposed infrastructure projects across various sectors like transportation, energy and manufacturing. The total project cost of all projects is estimated to be over Rs. 5 lakh crore with individual project costs ranging from Rs. 225 crore to Rs. 49,241 crore. The projects involve development of rail lines, highways, metro rail systems, gas pipelines, ports and manufacturing clusters to be undertaken by different central government ministries and departments.

Uploaded by

david smacker
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
109 views5 pages

Project List NPG 03022023

The document lists 56 proposed infrastructure projects across various sectors like transportation, energy and manufacturing. The total project cost of all projects is estimated to be over Rs. 5 lakh crore with individual project costs ranging from Rs. 225 crore to Rs. 49,241 crore. The projects involve development of rail lines, highways, metro rail systems, gas pipelines, ports and manufacturing clusters to be undertaken by different central government ministries and departments.

Uploaded by

david smacker
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Annexure -I

List of Projects recommended by Network Planning Group


(as on 03.02.2023)

Proponent
S. Project Cost
Project Ministry/
No. (Rs. in crore)
Dept.

Development of Integrated Manufacturing Cluster NICDC 1265.37


(IMC) at Khurpia Farm, Udham Singh Nagar District
1
in Uttarakhand
2 Development of Integrated Manufacturing Cluster NICDC 1367.72
(IMC) at Rajpura, District Patiala, Punjab
3 6 lane Elevated Corridor along with development of MoRTH 12.752
existing 4 lane road at ground level from Aroor to
ThuravoorThekku section of NH – 66
4 New 6-Lane H.L./Extra Dosed Cable Bridge on MoRTH 2860.05
River Ganga Parallel to Western Side of Existing
Digha-Sonepur Rail-Cum Road Bridge at Patna in
Bihar on EPC mode
5 ATF Pipeline from Malkapur Terminal to MoPNG To be
Hyderabad International Airport finalized at
DPR stage
6 Langtala Jodhpur Pali Natural Gas MoPNG 1900
Pipeline(LJPPL)
7 Gurdaspur -Jammu-Srinagar-Natural Gas Pipeline MoPNG 6931
(GJSPL)
8 Taranga Hill - Abu Road New Line Project MoR 2798.16

9 Extension of Naupada - Gunupur Single BG line MoR 1165.89


up to Theruvali, East Coast Railway (73.623 KM)
10 Una –Kunna New Rail line (40.7 Km) MoR 3360.64

11 Doubling of Katihar – Kumedpur section and Katihar MoR 942.64


– Mukuria section on North East Frontier Railway
(64.14 km)
12 Doubling between Gorakhpur Cantt.-Valmikinagar MoR 1120
Proponent
S. Project Cost
Project Ministry/
No. (Rs. in crore)
Dept.

on North Eastern Railway (95.95Km)


13 Gauge conversion of Pachora-Jamner with MoR 955.40
extension uptoMalkapur (Bodwad) of Central
railway (84.34Km)
14 Metro from HUDA City Centre to Cyber City with MoHUA 5960
Spur to Dwarka
15 Delhi-Gurugram-SNB RRTS Project MoHUA 37987

16 DMRTS Phase-IV – three corridors i.e., Lajpat MoHUA 13,011.25


Nagar-Saket G Block, Inderlok-Indraprastha and
Rithala-Narela
17 Thane Integral Ring Metro Project MoHUA 10412.61
18 Visakhapatnam Port Logistics Park – (MMLH cum MoPNG 225
FTWZ)
19 Swargate - Katraj Metro Rail Project (Extension of MoHUA 3668.04
Corridor-1 of Pune Metro Phase -1) towards South
20 PCMC - Nigdi Metro Rail Project (Extension of MoHUA 3668.04
Corridor-1 of Pune Metro Phase -1) towards North
21 Dehradun Metro Neo Project MoHUA 1852.74

22 Noida Extension line (Noida Sector-51 to Greater MoHUA 2456


Noida
23 Doubling of Agthori – Kamakhya including 2nd Rail MoR 1473.77
Bridge at Saraighat (7.062 km)
24 Doubling of Billi-Chunar section on North Central MoR 1423.96
Railway (101.58Km)
25 Doubling of track between Turavur - MoR 1262.14
Ambalappuzhain Southern Railway (45.86 km)
26 Gauge Conversion of Nathdwarda- MoR 968.92
DevgarhMadariya (82.542Km) of NW Railway
27 New Railway Line Between Kalyan to Murbad via MoR 836.12
Ambivli (28 Km)
28 Doubling Between Guntur - Bibinagar Stations MoR 2853.23
29 4-laning of Ambala-Kala Amb section of NH-72 to MoRTH 1182.77
Proponent
S. Project Cost
Project Ministry/
No. (Rs. in crore)
Dept.

Shahzadpur and Part of New NH-7 from


Shahzadpur to Kala Amb in Haryana and Punjab on
Hybrid Annuity Mode under NH(O)
30 Construction of Four Lane Highway from Gazipur- MoRTH 3554.28 (for
Ballia-UP/Bihar State Border (Greenfield) section of all four
NH-31. Package 1, 2, 3, 4. packages)
31 Improvement and Up-gradation of Existing Road to MoRTH 2307.47
4–lane with Paved Shoulder from Start of
Shahjahanpur bypass to Start of Shahabad bypass
(88.750 to 123.650 km) and start of Shahabad
Bypass to End of Hardoi Bypass (123.650 to
175.080 km)
32 Improvement & Up-gradation of NH-734 section of MoRTH 1794.13
Moradabad - Thakurdwara - Kashipur including
Moradabad & Kashipur bypasses in UP,
Uttarakhand: Package-I: Moradabad Bypass
33 Gorakhpur-Siliguri Corridor MoRTH 27545.0

34 Bareilly – Gorakhpur Corridor MoRTH 26486.0

35 Indo Nepal Border – Haldia Corridor MoRTH 30233.0

36 Lalsot – Kishangarh – Jodhpur Corridor MoRTH 10700.0

37 Pune – Ahmednagar – Aurangabad Corridor MoRTH 12229.0

38 Pune – Bengaluru Expressway MoRTH 49241.0

39 JNPT – Chowk Road Corridor MoRTH 1642.0

40 Southern part of Hyderabad Regional Ring Road MoRTH 2659.0

Development of Container Terminal at Tuna-Tekra, MoPSW


41 4243.64
Deendayal Port on BOT Basis Under PPP Mode

Development of Multipurpose Cargo (other than MoPSW


Container/Liquid) Berth Off Tuna Tekra at Gulf of
42 1719.22
Kutch at Kandla on Build, Operate and Transfer basis

Mandi Dabwali – Panipat (Connecting Amritsar MORTH


43 14302.00
Bhatinda Jamnagar & Ambala Kotputli with NH44)
Proponent
S. Project Cost
Project Ministry/
No. (Rs. in crore)
Dept.

Chennai - Trichy – Tuticorin EXP (Chennai – Trichy MORTH


44 30502.00
EXP &Thajavur (Pilaiyarpatti) – Tuticorin)

45 (Jhansi) - Lakhnadon - Raipur MORTH 14832.00

46 Samba – Mansar – Udhampur (with link to Domel) MORTH 3682.00

47 (Ludhiana) – Shamli – Bareilly with spur to Dasna MORTH 18540.00

48 Hyderabad - Bengaluru MORTH 15000.00

49 Hyderabad - Nagpur MORTH 12647.00

Doubling of existing single line between Sabarmati MOR


50 ‘D’ Cabin –Sarkhej (20.10 kms) and New Double line 2822.44
between Sarkhej - Dholera (Km 89.34)

Gauge Conversion of Samlaya-Timba Road (53.53 MOR


51 670.17
km.) of Western Railway

Provision of Automatic Signaling with CTC in New MOR


52 Jalpaiguri – Guwahati (via Rangiya) & Katihar – 542.43
Mukuria sections under HDN route of NF Railway

Part Detailed Estimate (Modified) for Construction of MOR


BG Double Line between Lumding and Furkating
53 (KM 191/130 to 331/130) (140.00 km) in connection 2123.70
with Lumding-Tinsukia Jn-Dibrugarh (381 km) DL
Project.

Proposed doubling between Mudkhed&Dhone MOR


stations via Mahbubnagar excluding Mwdchal –
Mahbubnagar including Bypass at Dhone – 4686.09
54 417.88km (Originally sanctioned as Akola-Dhone DL
626Km)

Development of Trunk Infrastructure Components for NICDC


55 Dighi Port Industrial Area (DPIA)- 5796.68 Acre 5410.04
under Delhi Mumbai Industrial Corridor (DMIC)

Development of Integrated Manufacturing Cluster at NICDC


Palakkad node under extension of Chennai
56 3815.46
Bengaluru Industrial Corridor (CBIC) to Kochi via
Coimbatore
Proponent
S. Project Cost
Project Ministry/
No. (Rs. in crore)
Dept.

Access controlled 4L with PS from Mysore to MoRTH


57 3470
Kushalnagara section of NH-275

Marwar Industrial Cluster (MIC) formerly known as NICDC


58 922
Jodhpur-Pali-Marwar Industrial Area

New Railway Line between Barbil – Nayagarh – MoR


59 Barsun (181 Kms) 8839.91

New BG line between Jalna to Jalgaon station in MoR


60 Central Railway (174 Kms) 5804.37

Proposed Quadrupling between Samakhiyali and MoR


61 Gandhidham(53.00 Kms) 1429.56

Construction of 4-Lane Access Controlled MoRTH


Greenfield Highway section (Warangal-Khammam)
from Oorugonda village at Design Ch. 112.240 Km
to V. Venkatayapalem village at Design Ch. 220.480 14,055
62 Km (total length 108.24 Km) as a part of Nagpur-
Vijaywada corridor, under other Economic Corridor
NH(O) programme on Hybrid Annuity Mode in the
State of Telangana
New line between Barejadi Nandej (Geratpur)- MoR
63 Sanand (38.20 KM) 961.67

Abbreviations:

NICDC: National Industrial Corridor Development Corporation


MoRTH: Ministry of Road Transport and Highways
MoPNG: Ministry of Petroleum and Natural Gas
MoR: Ministry of Railways
MoHUA: Ministry of Housing and Urban Affairs
MoPSW: Ministry of Ports, Shipping and Waterways