MICRO PILE Miq-Makmal-Meyerhoff Formula
MICRO PILE Miq-Makmal-Meyerhoff Formula
27875 P
Imposed load 1 x 3 = 3 kN
TOTAL 4599
Client: LAP
Location: Makmal
Subject: GEOTECHNICAL CAPACITY OF PILES BASED ON BH 7
USING MEYERHOF FORMULAE
File location 'file:///conversion/tmp/activity_task_scratch/711924865.xls'#$pile dsgn_ meyerhoff-size 150
Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
(m) (m) N' of area Ton at depth
Value Soil (m2) (Ton) (Ton) (Ton) LEVEL
1(OGL) 0.00 0.00 0 0.0 1 0.00 0.00 0.00 0.00 0.00 0.000
2 1.50 1.50 4 2.0 1 0.71 0.28 0.28 2.83 1.08 -1.500
3 3.00 1.50 3 3.5 2 0.71 0.42 0.70 1.33 0.79 -3.000
4 4.50 1.50 21 12.0 2 0.71 1.44 2.15 9.28 4.17 -4.500
5 6.00 1.50 27 24.0 2 0.71 2.88 5.03 11.93 6.49 -6.000
6 7.50 1.50 50 38.5 2 0.71 4.63 9.66 22.09 12.19 -7.500
7 9.00 1.50 50 50.0 2 0.71 6.01 15.66 22.09 15.20 -9.000
8 10.50 1.50 50 50.0 2 0.71 6.01 21.67 22.09 18.20 -10.500
9 12.00 1.50 50 50.0 2 0.71 6.01 27.68 22.09 21.20 -12.000
10 13.50 1.50 50 50.0 2 0.71 6.01 33.69 22.09 24.21 -13.500
11 15.00 1.50 50 50.0 2 0.71 6.01 39.70 22.09 27.21 -15.000
12 16.50 1.50 50 50.0 2 0.71 6.01 45.71 22.09 30.22 -16.500
13 18.00 1.50 50 50.0 2 0.71 6.01 51.71 22.09 33.22 -18.000
Geotechnical
Capacity Per
Pile (kN) =
120
100.0 1.0 150 100.00 120.00 1.200 OK!! 7.620 7.120 7.195 0.120 7.075
Client: LAP
Location: Makmal
Subject: GEOTECHNICAL CAPACITY OF PILES BASED ON BH 7
USING MEYERHOF FORMULAE
File location 'file:///conversion/tmp/activity_task_scratch/711924865.xls'#$pile dsgn_ meyerhoff-size150(2)
Layer Depth Thick SPT Nave Type Shaft Qsu (Qsu)sum Qbu Qw
(m) (m) N' of area Ton at depth
Value Soil (m2) (Ton) (Ton) (Ton) LEVEL
1(OGL) 0.00 0.00 0 0.0 1 0.00 0.00 0.00 0.00 0.00 0.000
2 1.50 1.50 4 2.0 1 0.71 0.28 0.28 2.83 1.08 -1.500
3 3.00 1.50 3 3.5 2 0.71 0.42 0.70 1.33 0.79 -3.000
4 4.50 1.50 21 12.0 2 0.71 1.44 2.15 9.28 4.17 -4.500
5 6.00 1.50 27 24.0 2 0.71 2.88 5.03 11.93 6.49 -6.000
6 7.50 1.50 50 38.5 2 0.71 4.63 9.66 22.09 12.19 -7.500
7 9.00 1.50 50 50.0 2 0.71 6.01 15.66 22.09 15.20 -9.000
8 10.50 1.50 50 50.0 2 0.71 6.01 21.67 22.09 18.20 -10.500
9 12.00 1.50 50 50.0 2 0.71 6.01 27.68 22.09 21.20 -12.000
10 13.50 1.50 50 50.0 2 0.71 6.01 33.69 22.09 24.21 -13.500
11 15.00 1.50 50 50.0 2 0.71 6.01 39.70 22.09 27.21 -15.000
12 16.50 1.50 50 50.0 2 0.71 6.01 45.71 22.09 30.22 -16.500
13 18.00 1.50 50 50.0 2 0.71 6.01 51.71 22.09 33.22 -18.000
Geotechnical
Capacity Per
Pile (kN) =
120
190.0 2.0 150 95.00 120.00 1.263 OK!! 7.620 7.120 7.195 0.120 7.075
2 m (steel casing)
3m m
(API) (API)
Calculation
total volume =
total weight =
804.019
weld to extension of casing
804.020 18.8 m
weld to extension of API pipe
rragement at Makmal Gunung Semanggol (Kontrak 1)
m (steel casing)
m (steel casing)
m
(API)
0 m Length of API = 0 m
0 m Length of casing = 0 m
0 nos Nos of piles = 0 nos
0 nos Nos of joint = 0 nos
Calculation in BQ
160 m
10 m2
140 m
20 nos
0.00621
0.00534
0.139 m3
1,090.2 kg 1,100.0 kg
20 nos
20 m
20 m
m ( casing & API
pipe)
m (steel casing)