0% found this document useful (0 votes)
145 views

Itp Bop

This document is an inspection test plan for repairing turbine auxiliary valves. It outlines the work to be done on the Forwarding Pump B Discharge Valve from December 2023 to February 2024. The plan details the pre-shutdown, shutdown/outage, and recommissioning work tasks. It assigns inspectors and outlines the control activities like inspection, testing, and sign-offs required for each task.

Uploaded by

Agung Nugroho
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
145 views

Itp Bop

This document is an inspection test plan for repairing turbine auxiliary valves. It outlines the work to be done on the Forwarding Pump B Discharge Valve from December 2023 to February 2024. The plan details the pre-shutdown, shutdown/outage, and recommissioning work tasks. It assigns inspectors and outlines the control activities like inspection, testing, and sign-offs required for each task.

Uploaded by

Agung Nugroho
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 80

PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-01


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) AOGAA12AA002
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Forwarding Pump B Discharge Valve
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-02


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) AOGAA11AA002
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Forwarding Pump A Discharge Valve
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-03


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) AOGAA11AA002
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Check Valve Forwarding Pump A
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-04


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) AOGAA12AA002
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Check Valve Forwarding Pump B
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-05


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) 10PAB11AA003
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Port Venting Discharge Header CWP
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-06


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) 10PAA11AA007
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Inlet MOV Travveling Screen A
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-07


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) 10PAA12AA007
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Inlet MOV Travveling Screen B
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-08


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) 10PAA13AA007
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Inlet MOV Travveling Screen C
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-09


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) 10PAA11AA002
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Traveeling Screen Wash Pump Inlet Vlv A
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-10


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) 10PAA12AA002
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Traveeling Screen Wash Pump Inlet Vlv B
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-11


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) 10PAA13AA002
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Traveeling Screen Wash Pump Inlet Vlv C
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-12


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) 10PAA11AA004
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Traveeling Screen Wash Pump Outlet Vlv A
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-13


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) 10PAA12AA004
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Traveeling Screen Wash Pump Outlet Vlv B
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-14


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) 10PAA13AA004
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Traveeling Screen Wash Pump Outlet Vlv C
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-15


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) 10PAA11AA005
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Screen Wash Pump A Discharge Isolation Vlv
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-16


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) 10PAA12AA005
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Screen Wash Pump B Discharge Isolation Vlv
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-17


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) 10PAA13AA005
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Screen Wash Pump C Discharge Isolation Vlv
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-18


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) 10PAB11AA001
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Discharge Isolation Venting Port Valve CWP A
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-19


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) 10PAB12AA001
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Discharge Isolation Venting Port Valve CWP B
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-20


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) 10PAB13AA001
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Discharge Isolation Venting Port Valve CWP C
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-21


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) A0GCF21AP001
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION BWRO HPP A
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-22


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) A0GCF22AP001
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION BWRO HPP B
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-23


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) A0GCL11AP001
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION New pit pump A
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-24


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) A0GCL12AP001
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION New pit pump B
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-25


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) A0GTA62AP001
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Intermediate pump B
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-26


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) A0QCL43AP001
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Impact dosing valve no. 4 (south side forebay)
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-27


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) A0GAD01AA001
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION SW treated basin A outlet valve
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-28


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) A0GAD02AA001
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION SW treated basin B outlet valve
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-29


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) A0GMF21AP001
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Transfer pump A
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-30


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) A0GMF31AP001
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Reuse pump A1
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-31


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) A0GMF32AP001
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Reuse Pump A2
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-32


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) A0LDF21AA004
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Booster valve inlet mixedbed A
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-33


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) A0GHE01AA501
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Service water relief valve (near booster fan)
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-34


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) A0GHE01AA502
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Service water relief valve (near dewatering house)
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-35


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO)
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Discharge Fire Fighting near H2 Plant
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-36


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) A0SGA41AA003
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Relief Valve back to Tank
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-37


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) LBA0GCP42AP002
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION BWRO Cleaning Pump
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-38


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) LBA0GCP42AP002
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION BWRO Cleaning Pump
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-39


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) 10LDF11AA003
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION Prefilter A Booster Valve
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager
PT Lestari Banten Energi

INSPECTION TEST PLAN


Responsible Person Issue Date Revision No : File No : PAGE
TS/Planning 01/11/2022 1 R01WTS08020 1 OF 1

A ITP REFERENCE NO MTB-ITP-2023-115-40


WORK ORDER NUMBER 4100015259
EQUIPMENT NUMBER (KKS NO) 10LDF20AA053
EQUIPMENT DESCRIPTION INSPECT & REPAIR TURBINE AUX VALVES
ACTIVITY DESCRIPTION High Speed Mixbed Bypass valve manual isolation valve B
WORK DURATION/ DATE December 2023 - February 2024

B Inspection by Section Name of Inspectors Control Activity


1. Maintenance Engineer 1. Rudi KT W: Witness M : Modification
2. Maintenance Supervisor 2. Sugeng/Warisman C : Calibration I : Inspect
3. Contractor 3. Agung Nugroho S : Setting V : Verification
4. Operation 4 R : Repair/ Replace N : NDT
5. Condition Monitoring 5 T : Testing (Function) X : Performed
6. Others (Scaffolding/Insulation/Cladding) 6

C Pre Shutdown Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
1 Pre-inspection I I X
Receive and mark control number (KKS/Stamp)
2 I I X
at local site.
3 Strip, clean, and inspect. I I X
4
5

D Shutdown/ Outage Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Disassembly valve actuator (motorized /
1 pneumatic), *During this process the vendors will be I I X
accompany with LBE personnel.

2 Valve Inspection and Repair (Cleaning process) I I X,R

3 Valve Inspection and Repair (NDT inspection) I I X,N


4 Inspect and check all trims parts condition. I,W I,W X
Lapping for seat, disc, and other parts as
5 I,W I,W X,R
appropriated.
6 Polish and run out spindle. I,W I,W X
Recondition all broken parts to the dimension as
7 I,W I,W X
standards
Conduct blue contact check for finalize the
8 I,W I,W X
contact/sealing point
Replace and Install new soft kits parts (gasket,
9 I,W I,W X,R
packing, bonnet seal, etc.)
Re - Assembly the Valve assemble and Re-install
10 I,W I,W,C X,S
Valve actuator
Re-setting and adjust valve position (Close or
11 open) to its actuator stroke appropriatly and I,W I,W,C X,S
tighly.
It should be able operated smootly and
12 I I,C
appropriatly during stroking test.
13 Painting as existing color I I X

E Recommissioning Work Control Activities Signatures


Task
Task Description 1 2 3 4 5 6 LBE Sign Contr Sign Date
No
Inspect and check condition valve during tsrt-up
1 I,T I,T I,T
(check lekakage / passing)
2
3
4
5

FINAL CONDITION
F Final Result

Measurement (Standard) Value (as found)

CLOSE OUT SIGNATURES


Department/
G Name Name Designation Signature Date
Company
Performed By
LBE/ Contractor
Checked By
LBE Supervisor
Verified By
LBE Engineer
Approved By
LBE Manager

You might also like