0% found this document useful (0 votes)
29 views19 pages

5000 Water Tank Seat and Water Distribution House BoQ

This document provides a cost estimate for construction of a main building divided into sub-structure and super-structure sections. The sub-structure includes excavation and earth work, concrete work, and masonry and totals [VALUE]. The super-structure includes further concrete work, block works, roofing, metal work, finishing, and electrical/plumbing works. Concrete work under the super-structure includes reinforced concrete columns, tie beams, and arched concrete lintels.

Uploaded by

menurmoshe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views19 pages

5000 Water Tank Seat and Water Distribution House BoQ

This document provides a cost estimate for construction of a main building divided into sub-structure and super-structure sections. The sub-structure includes excavation and earth work, concrete work, and masonry and totals [VALUE]. The super-structure includes further concrete work, block works, roofing, metal work, finishing, and electrical/plumbing works. Concrete work under the super-structure includes reinforced concrete columns, tie beams, and arched concrete lintels.

Uploaded by

menurmoshe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 19

SUMMARY

Main Building
A SUB STRUCTURE
1 Excavation and Earth work Birr 0.00
2 Concrete Work Birr 0.00
3.Masonry Birr 0.00
Sub Total Birr 0.00

B SUPER STRUCTURE

1 Concrete Work Birr 0.00


2 Block Works Birr 0.00
3 Roofing and Cladding Birr 0.00
4. Metal Work Birr 0.00
5. Finishing Birr 0.00
6. Sanitary and Electrical Works Birr 0.00

Sub Total Birr 0.00


Total Sub & Super One Unit Birr 0.00

1 of 19
ITEM DESCRIPTION OF WORK UNIT QTY UNIT TOTAL
PRICE PRICE

SUB – STRUCTURE

1. Excavation and Earth Work

1.1 Site clearing to remove top soil to an average depth of


20cm starting from N.G.L. m2 26.00 - -
-
1.2 Bulk excavation m3 13.00 - -
-
1.10 Selected borrow fill under hardcore with satisfactory
soil (Selected Material) m3 8.00 - -
-
1.15 cart away surplus excavated material to a suitable pit
as may be found by the contractor and with in the
acceptable range of the city administration. m3 13.00 - -
-
1.16 250mm thick basaltic stone hardcore well rolled,
consolidated and blinded with crushed stone . Hard
core shall be sound approved stone of specified
finishing thickness and placed as directed by the
Engineer and finished blinded with 20mm crushed
aggregate m2 10.40 - -
` -
Total carried to summary - -
-

2 of 19
ITEM DESCRIPTION OF WORK UNIT QTY UNIT TOTAL
PRICE PRICE
-
2. Concrete Work -
-
2.1 50 mm lean concrete quality C-5, with minimum
cement content of 150 kg /m3, of concrete; -
-
Under grade beam m2 3.20 - -
-
Under masonry m2 8.84 - -
-
2.2 Reinforced concrete quality C-25, cast into formworks
and vibrated around rod reinforcement bars.
Formwork and reinforcement bars are measured
separtely. Type of cement to be Ordinary Portland
Cement (OPC). -
-
In 10mm thick ground floor slab m2 9.60 - -
-
In beam m3 0.50 - -
-
2.4 Provide, cut and fix in position sawn structural wood or
steel formwork which ever is appropriate; -
-
for grade beam m2 20.00 - -
-

3 of 19
ITEM DESCRIPTION OF WORK UNIT QTY UNIT TOTAL
PRICE PRICE
2.5 Mild steel reinforcement according to structural
drawings. Price includes cutting, bending, placing in
position, tying wire and concrete spacers. -
-
Dia 6mm deformed bar Kg 270.00 - -
-
Dia 8mm deformed bar Kg 253.16 - -
-
Dia 10mm deformed bar Kg - - -
-
Total carried to summary - -
-

4 of 19
ITEM DESCRIPTION OF WORK UNIT QTY UNIT TOTAL
PRICE PRICE
-
3. Masonry Work -
-
3.1 Construct 50cm thick hard trachytic or equivalent
stone masonry foundation wall for perhepherial
bedded in cement sand mortar ratio 1:3 and middle
platform -
-
A. Below Natural Ground Floor Level (BNGL) m3 20.00 - -
-
Total carried to summary - -
-

5 of 19
ITEM DESCRIPTION OF WORK UNIT QTY UNIT TOTAL
PRICE PRICE
-
B . SUPER – STRUCTURE -
-
1. Concrete Work -
-
1.1 Reinforced concrete quality C-25, cast into formworks
and vibrated around rod reinforcement bars.
Formwork and reinforcement bars are measured
separtely. Type of cement to be Ordinary Portland
Cement (OPC). -
-
In Elevation columns m3 0.55 - -
-
In top tie beam m3 0.69 - -
-
In Arched Concrete Lintels (C-20 Concrete) m3 0.95 - -
-
1.3 Provide, cut and fix in position sawn structural wood or

steel formwork which ever is appropriate; -


-
In Elevation columns m2 32.00 - -
-
In top tie beam m2 30.00 - -
-
In wudu cubes m2 - - -
-
1.4 Mild steel reinforcement according to structural
drawing. Price includes cutting, bending, placing in
position , tying wire, concrete spacers and
reinforcement bar chairs. -
-
Dia 8mm deformed bar ( stirrup) Kg 130.00 - -
-
Dia 10 mm deformed bar Kg 110.00 - -
-
Total carried to summary - -
-

6 of 19
ITEM DESCRIPTION OF WORK UNIT QTY UNIT TOTAL
PRICE PRICE
2. Block Work -
-
2.1 Construct 20cm thick class C hollow concrete block
(PKG) wall bedded in cement sand mortar (1:3) mix
ratio. Both sides left for plastering. m2 47.68 - -
-
Total carried to summary - -
-
3. Roofing -
-
A G-28 galvanized corrugated iron sheet roofing fixed to 5 x 7
cm zigba purlins at c/c 90cm and Ø 8-10 cm eucalyptus
trusses. Each truss shall be firmly fixed with Ø 6mm plain
bars to concrete tie beam and column, all done according
to roof truss drawing. Unit price includes G-28 flat metal
roof ridge cover and 3 coats of wood preservative paint
to all truss members and roof purlins. Horizontal
projection of roof area shall be taken for measurement.
Purlins & roof trusses shall be measured separately m2 21.85 - -
-
-
B Metal Sheet gutter ml 10.00 - -
-
C PVC Down Pipe sia 75mm ml 12.00 - -
-
Total carried to summary - -
-

7 of 19
ITEM DESCRIPTION OF WORK UNIT QTY UNIT TOTAL
PRICE PRICE
4. Metal Works -
-
4.1 Supply and fix 90cm door made of LTZ profile, m2 1.89 - -
-
Total carried to summary - -
-

8 of 19
ITEM DESCRIPTION OF WORK UNIT QTY UNIT TOTAL
PRICE PRICE
5. Finishing & Painting -
-
5.1 Prepare, supply and apply two coats of Portland
cement plaster -
-
To all hollow block wall surface m² 47.68 - -
Ceramic wall tiles 200*300*8 mm m² 9.60 - -
5.2 3cm thick cement screed a ratio of 1:3.cement sand
mix . m2 69.40 - -
-
5.3 Apply three coats of plastic emulsion paint. Price shall

include pre - cleaning & preparation of the surface. -


-
a) To all vertical wall surface. m² 69.40 - -
-
Total carried to summary - -
-
6. Saniatry and Electrical Works -
-
ELEVATED WATER TANK -
6.1 Supply and install approved quality Glass Reinforced
Plastic or Equivalent elevated water tank on concrete
support as shown on the Sanitary drawing and site
plan. Exact location to be determined on site. Piping
should be made as per the detail drawing (5,000 liter
fibre glass) -
-
Price shall include all the necessary pipes, fittings and
connections and Wudu/Ablution Pipes pcs 1.00 - -
-
REGULAR LIGHT FITTINGS -
6.2 Light fittings as per the approval of the Architect. Price
shall include wiring, junction boxes ,conduits and all
necessary accessories. pcs 4.00 - -
Solar panels pcs 8.00 -

Total carried to summary -

9 of 19
ENGINEER'S COST ESTIMATE

FOR

WATER RESERVOUIR BUILDING

CLIENT:
CONSULTANT:
LOCATION:

AUGUST- 2022

10 of 19
SUMMARY

Main Building
A SUB STRUCTURE
1 Excavation and Earth work Birr 9,361.80
2 Concrete Work Birr 97,118.70
3.Masonry Birr 51,251.20
Sub Total Birr 157,731.70

B SUPER STRUCTURE

1 Concrete Work Birr 82,127.76


2 Block Works Birr 37,190.40
3 Roofing and Cladding Birr 45,195.50
4. Metal Work Birr 8,528.70
5. Finishing Birr 57,441.30
6. Sanitary and Electrical Works Birr 58,360.00

Sub Total Birr 288,843.66


Total Sub & Super One Unit Birr 446,575.37

11 of 19
ITEM DESCRIPTION OF WORK UNIT QTY UNIT TOTAL
PRICE PRICE

SUB – STRUCTURE

1. Excavation and Earth Work

1.1 Site clearing to remove top soil to an average depth of


20cm starting from N.G.L. m2 26.00 22.50 585.00
-
1.2 Bulk excavation m3 13.00 187.50 2,437.50
-
1.10 Selected borrow fill under hardcore with satisfactory
soil (Selected Material) m3 8.00 243.00 1,944.00
-
1.15 cart away surplus excavated material to a suitable pit
as may be found by the contractor and with in the
acceptable range of the city administration. m3 13.00 67.06 871.78
-
1.16 250mm thick basaltic stone hardcore well rolled,
consolidated and blinded with crushed stone . Hard
core shall be sound approved stone of specified
finishing thickness and placed as directed by the
Engineer and finished blinded with 20mm crushed
aggregate m2 10.40 338.80 3,523.52
` -
Total carried to summary - 9,361.80
-

12 of 19
ITEM DESCRIPTION OF WORK UNIT QTY UNIT TOTAL
PRICE PRICE
-
2. Concrete Work -
-
2.1 50 mm lean concrete quality C-5, with minimum
cement content of 150 kg /m3, of concrete; -
-
Under grade beam m2 3.20 252.00 806.40
-
Under masonry m2 8.84 252.00 2,227.68
-
2.2 Reinforced concrete quality C-25, cast into formworks
and vibrated around rod reinforcement bars.
Formwork and reinforcement bars are measured
separtely. Type of cement to be Ordinary Portland
Cement (OPC). -
-
In 10mm thick ground floor slab m2 9.60 705.60 6,773.76
-
In beam m3 0.50 5,040.00 2,520.00
-
2.4 Provide, cut and fix in position sawn structural wood or
steel formwork which ever is appropriate; -
-
for grade beam m2 20.00 446.60 8,932.00
-

13 of 19
ITEM DESCRIPTION OF WORK UNIT QTY UNIT TOTAL
PRICE PRICE
2.5 Mild steel reinforcement according to structural
drawings. Price includes cutting, bending, placing in
position, tying wire and concrete spacers. -
-
Dia 6mm deformed bar Kg 270.00 145.00 39,150.00
-
Dia 8mm deformed bar Kg 253.16 145.00 36,708.86
-
Dia 10mm deformed bar Kg - 145.00 -
-
Total carried to summary - 97,118.70
-

14 of 19
ITEM DESCRIPTION OF WORK UNIT QTY UNIT TOTAL
PRICE PRICE
-
3. Masonry Work -
-
3.1 Construct 50cm thick hard trachytic or equivalent
stone masonry foundation wall for perhepherial
bedded in cement sand mortar ratio 1:3 and middle
platform -
-
A. Below Natural Ground Floor Level (BNGL) m3 20.00 2,562.56 51,251.20
-
Total carried to summary - 51,251.20
-

15 of 19
ITEM DESCRIPTION OF WORK UNIT QTY UNIT TOTAL
PRICE PRICE
-
B . SUPER – STRUCTURE -
-
1. Concrete Work -
-
1.1 Reinforced concrete quality C-25, cast into formworks
and vibrated around rod reinforcement bars.
Formwork and reinforcement bars are measured
separtely. Type of cement to be Ordinary Portland
Cement (OPC). -
-
In Elevation columns m3 0.55 5,040.00 2,772.00
-
In top tie beam m3 0.69 5,040.00 3,497.76
-
In Arched Concrete Lintels (C-20 Concrete) m3 0.95 5,040.00 4,788.00
-
1.3 Provide, cut and fix in position sawn structural wood or

steel formwork which ever is appropriate; -


-
In Elevation columns m2 32.00 585.00 18,720.00
-
In top tie beam m2 30.00 585.00 17,550.00
-
In wudu cubes m2 - 585.00 -
-
1.4 Mild steel reinforcement according to structural
drawing. Price includes cutting, bending, placing in
position , tying wire, concrete spacers and
reinforcement bar chairs. -
-
Dia 8mm deformed bar ( stirrup) Kg 130.00 145.00 18,850.00
-
Dia 10 mm deformed bar Kg 110.00 145.00 15,950.00
-
Total carried to summary - 82,127.76
-

16 of 19
ITEM DESCRIPTION OF WORK UNIT QTY UNIT TOTAL
PRICE PRICE
2. Block Work -
-
2.1 Construct 20cm thick class C hollow concrete block
(PKG) wall bedded in cement sand mortar (1:3) mix
ratio. Both sides left for plastering. m2 47.68 780.00 37,190.40
-
Total carried to summary - 37,190.40
-
3. Roofing -
-
A G-28 galvanized corrugated iron sheet roofing fixed to 5 x 7
cm zigba purlins at c/c 90cm and Ø 8-10 cm eucalyptus
trusses. Each truss shall be firmly fixed with Ø 6mm plain
bars to concrete tie beam and column, all done according
to roof truss drawing. Unit price includes G-28 flat metal
roof ridge cover and 3 coats of wood preservative paint
to all truss members and roof purlins. Horizontal
projection of roof area shall be taken for measurement.
Purlins & roof trusses shall be measured separately m2 21.85 1,310.00 28,623.50
-
-
B Metal Sheet gutter ml 10.00 1,314.00 13,140.00
-
C PVC Down Pipe sia 75mm ml 12.00 286.00 3,432.00
-
Total carried to summary - 45,195.50
-

17 of 19
ITEM DESCRIPTION OF WORK UNIT QTY UNIT TOTAL
PRICE PRICE
4. Metal Works -
-
4.1 Supply and fix 90cm door made of LTZ profile, m2 1.89 4,512.54 8,528.70
-
Total carried to summary - 8,528.70
-

18 of 19
ITEM DESCRIPTION OF WORK UNIT QTY UNIT TOTAL
PRICE PRICE
5. Finishing & Painting -
-
5.1 Prepare, supply and apply two coats of Portland
cement plaster -
-
To all hollow block wall surface m² 47.68 380.00 18,118.40
Ceramic wall tiles 200*300*8 mm m² 9.60 1,370.74 13,159.10
5.2 3cm thick cement screed a ratio of 1:3.cement sand
mix . m2 69.40 210.00 14,574.00
-
5.3 Apply three coats of plastic emulsion paint. Price shall

include pre - cleaning & preparation of the surface. -


-
a) To all vertical wall surface. m² 69.40 167.00 11,589.80
-
Total carried to summary - 57,441.30
-
6. Saniatry and Electrical Works -
-
ELEVATED WATER TANK -
6.1 Supply and install approved quality Glass Reinforced
Plastic or Equivalent elevated water tank on concrete
support as shown on the Sanitary drawing and site
plan. Exact location to be determined on site. Piping
should be made as per the detail drawing (5,000 liter
fibre glass) -
-
Price shall include all the necessary pipes, fittings and
connections and Wudu/Ablution Pipes pcs 1.00 57,000.00 57,000.00
-
REGULAR LIGHT FITTINGS -
6.2 Light fittings as per the approval of the Architect. Price
shall include wiring, junction boxes ,conduits and all
necessary accessories. pcs 4.00 340.00 1,360.00
Solar panels pcs 8.00 -

Total carried to summary 58,360.00