010 - Scaffolding (Erection & Dismantling)

This document summarizes a task risk assessment for scaffolding erection and dismantling work at a project site in Abu Dhabi. It identifies the major hazards of falling materials and falling from heights during loading/unloading and working at height. The current control measures include proper material storage, use of lifting equipment, briefings on manual handling and fall protection. Additional measures suggested are daily toolbox talks and briefings to review control measures before starting work. The residual risks were lowered to medium with the implementation of proper controls and supervision.

Uploaded by

Prem Christian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
449 views6 pages

010 - Scaffolding (Erection & Dismantling)

This document summarizes a task risk assessment for scaffolding erection and dismantling work at a project site in Abu Dhabi. It identifies the major hazards of falling materials and falling from heights during loading/unloading and working at height. The current control measures include proper material storage, use of lifting equipment, briefings on manual handling and fall protection. Additional measures suggested are daily toolbox talks and briefings to review control measures before starting work. The residual risks were lowered to medium with the implementation of proper controls and supervision.

Uploaded by

Prem Christian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

TASK RISK ASSESSMENT

Project Name: Bauer Assembling, Repair and Maintenance Yard


Client : Bauer International FZE 22-444
Consultant : K N International Architects and Engineers LLC

Plot No KHIA5/ P12


Task Description Scaffolding (Erection/Dismantling)

Task Site Location Taweela, Kizad, Abu Dhabi

What would the What is the LIKELIHOOD of an occurrence? Hierarchy of Controls


SEVERITY Improbable Low Medium High Almost
Of an occurrence, be? Can the hazard be Eliminated or removed from the workplace?
1 2 3 4 Certain 5
Minor
Causing minor injuries (e.g. cuts and scratches). No lost Low Low Low Low Med
Can the product or process be substituted for a less hazardous alternative?
time likely other than First Aid treatment. 1 2 3 4 5

Low
Causing significant injuries (e.g. sprains, bruises, Low Low Med Med Med
Can the hazard be Engineered away with guards or barriers?
lacerations, dermatitis). 2 4 6 8 10

Medium
Causing temporary disability (minor fracture, asthma, Low Med Med Med High Can Administrative Controls be adopted
deafness, concussion). 3 6 9 12 15 i.e., procedures, job rotation etc.

High
Causing permanent disability (major fractures, Low Med Med High High Can Personal Protective Equipment & Clothing be worn to safeguard against
amputation, head injuries, eye injuries, poisoning). 4 8 12 16 20 hazards?

Major RISK RATING (Likelihood x Severity)


Causing death to one or more people (fatal injuries, Med Med High High High 1-4 LOW RISK (No further action required)
occupational cancer, fatal disease, fire) 5 10 15 20 25 5-12 MEDIUM RISK (Procedure to be available)
15-25 HIGH RISK (Full time supervision present)

Document No. MNGC-OHS-TRA-010 Rev No. 01 Issue Date – 01/09/2022 Page 1 of 6


TASK RISK ASSESSMENT
Resid
Legal
S. Consequence Risk ual
Task Step Hazard Details L S Current Control Measures Req. L S Additional Control Measures
No Details Rating (Y/N) Risk
Rating
 Ensure material shall be stored & secured
1  Major injury
Loading/ Unloading  Fall of 4 4 16 properly with adequate barricading at the Y 1 4 4
 Impact injuries
material storage area.
 Crush injuries
 Collapse of  Ensure material shall be shifted by means of
 Musculoskelet
the lifting mechanical aid wherever possible.
al injuries
equipment  Ensure adequate manpower shall be
 Manual deployed for the material handling & the
Handling load shall not exceed the capacity of an
individual.
 Control measure/risk assessment shall be
communicated to operatives prior to the
job commencement.
 Operatives to be briefed - manual handling.
 Ensure the OSHAD approved 3rd party
trained competent banksman/operator is
deployed for the loading/ unloading
activity.
 Ensure lifting equipment shall possess valid
load test certificate from OSHAD approved
3rd party.

Document No. MNGC-OHS-TRA-010 Rev No. 01 Issue Date – 01/09/2022 Page 2 of 6


TASK RISK ASSESSMENT
Resid
Legal
S. Consequence Risk ual
Task Step Hazard Details L S Current Control Measures Req. L S Additional Control Measures
No Details Rating (Y/N) Risk
Rating
2 Working at height Fall of men Fatal/Fracture  Ensure scaffold is erected on a firm/level Conduct tool box talk and
4 4 16 surface. Y 1 4 4 Daily briefing prior to start
 Load calculation for the scaffold design shall of work and point out
important details before
be carried out by a competent person if it
using or working at the
exceeds 10 mts.
scaffolding ( e.g. Don’t use
 Ensure the scaffold shall not be erected scaffolding tag; red colour
beyond the base: height ratio. (1:3) tag indicate don’t use and
 Ensure material shall be stored & secured green colour indicates safe
properly with adequate barricading at the to use)
storage area.
Access points to be
 Ensure scaffold shall not be erected in the
identified clearly and chosen
proximity (10 feet) to the electrical at appropriate positions
overhead lines. where access is most
 Ensure the area shall be barricaded while practical.
performing the erection/dismantling work.
Ensure adequate base plate is provided Access routes to all scaffolds
to be kept clear of
while erecting the scaffold.
obstructions.
 Ensure scaffold is provided with scaff tag by
the Scaffold Inspector. Partially erected or
 Ensure proper access/egress to the work dismantled scaffolding shall
platform is provided not be used and a
 Ensure access ladder shall be provided from prominent warning notice
indicating that the scaffold is
inside the scaffold structure only.
incomplete and not safe to
 Adequate fall edge protection must be
use (Red scaffold tag)
provided.

Document No. MNGC-OHS-TRA-010 Rev No. 01 Issue Date – 01/09/2022 Page 3 of 6


TASK RISK ASSESSMENT
Resid
Legal
S. Consequence Risk ual
Task Step Hazard Details L S Current Control Measures Req. L S Additional Control Measures
No Details Rating (Y/N) Risk
Rating
 Ensure task specific PPEs are provided & shall be posted. The access
worn by the operatives. to the scaffold shall be
 Ensure the operatives working at height are physically blocked and
provided with adequate fall protection unauthorised entry
 Scaffold erectors/inspector shall be trained prevented.
by 3rd party OSHAD approved for the
competency. Manual handling awareness
 Ensure adequate means of access/ egress training.
shall be available during an emergency
 Emergency contact details shall be displayed
at the work area
 Erection/Dismantling of the scaffold shall be
carried out under the close supervision of
the site Foreman.
 Minimise number of operatives in the area.
 Train the workers on manual handling
techniques.
 Ensure good standard of lighting in the
work area.
 Protection from the hazard of falling objects
shall be provided to the top of the scaffold
if this hazard exists.
 Scaffolds shall be barricaded and protected
from accidental collision from moving plant
and machinery.

Document No. MNGC-OHS-TRA-010 Rev No. 01 Issue Date – 01/09/2022 Page 4 of 6


TASK RISK ASSESSMENT
Resid
Legal
S. Consequence Risk ual
Task Step Hazard Details L S Current Control Measures Req. L S Additional Control Measures
No Details Rating (Y/N) Risk
Rating

Document No. MNGC-OHS-TRA-010 Rev No. 01 Issue Date – 01/09/2022 Page 5 of 6


TASK RISK ASSESSMENT
Resid
Legal
S. Consequence Risk ual
Task Step Hazard Details L S Current Control Measures Req. L S Additional Control Measures
No Details Rating (Y/N) Risk
Rating

Legal requirement: OSHAD COP 23.0 / Federal Law 8 of 1980 / Ministerial Order No. 32 of 1982, Ministry of Labour, UAE / Federal Law No. 24 of 1999.
Assessors Name Albert C.G. Reviewed by Eng. Mohammed Fayaz Approved by Eng. Sanal Kumar
Position HSE Advisor Position Project Engineer Position Projects Manager
Signature Signature Signature
Assessment Date 01/09/2022 Review Period 3 months Date of next review 30/11/2022
Reviewed by K N International Architects and Engineers LLC
Name Position Resident Engineer Signature
Date Stamp

Document No. MNGC-OHS-TRA-010 Rev No. 01 Issue Date – 01/09/2022 Page 6 of 6