Rates of Material Including Lead and Conveynace Charges For The Year 2021-22

1. The document lists rates for various construction materials for the year 2021-22, including rates per cubic meter or tonne for items like stone, sand, gravel and metal of different sizes. 2. It provides information on the lead distance in kilometers for transporting each material, the initial rate, and additional charges for crushing, blasting, and conveyance. 3. Standard deductions are made for initial lead charges based on the lead distance, to calculate the total rate per cubic meter or tonne for each construction material.

Uploaded by

vamsi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
100 views2 pages

Rates of Material Including Lead and Conveynace Charges For The Year 2021-22

1. The document lists rates for various construction materials for the year 2021-22, including rates per cubic meter or tonne for items like stone, sand, gravel and metal of different sizes. 2. It provides information on the lead distance in kilometers for transporting each material, the initial rate, and additional charges for crushing, blasting, and conveyance. 3. Standard deductions are made for initial lead charges based on the lead distance, to calculate the total rate per cubic meter or tonne for each construction material.

Uploaded by

vamsi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Rates of Material including lead and conveynace charges for the Year 2021-22

MACHINE Deduct
SSR
S. DESCRIPTION OF THE Lead in INITIAL CRUSHING BLASTING initial lead TOTAL RATE
Item UNIT Conveyance
NO MATERIAL Kms RATE CHARGES @ CHARGES charges of IN Rs.
No.
25% 1 Km

1 33.f 40 mm SS 5 metal Cum 18.00 280.24 505 126.25 70.00 -34.24 947.26

2 33.d 20 mm SS 5 metal Cum 18.00 280.24 870 217.50 70.00 -34.24 1403.51

3 33.e 25 mm SS 5 metal Cum 18.00 280.24 830 207.50 70.00 -34.24 1353.51

4 33.b 10 mm SS 5 metal Cum 18.00 280.24 657 164.25 70.00 -34.24 1137.26

5 33.a 6 mm SS 5 metal Cum 18.00 280.24 505 126.25 70.00 -34.24 947.26

6 34 Gravel Cum 10.00 166.18 98 -- -- -35.56 228.62

7 36.b Sand for Concrete (Rock sand) Cum 18.00 280.24 590 -- -- -34.24 836.01

8 36.b Sand for Concrete (River sand) Cum 66.00 879.11 600 -- -- -35.56 1443.55

9 36.c Sand for filling, blindage Cum 66.00 879.11 600.00 -- -- -35.56 1443.55
10 33.c 12 mm SS 5 metal Cum 18.00 280.24 781 195.25 70.00 -34.24 1292.26
11 22.g RR masonary (Granite) Cum 18.00 280.24 239 -- 70.00 -34.24 555.01
12 23.a CR masonary (Granite) Cum 18.00 280.24 249 -- 70.00 -34.24 565.01
Stone boulder of size 150 mm size
13 18.00 280.24 90 -- 70.00 -34.24 406.01
33.z3 Cum
Stone boulder of size 150-200mm
14 18.00 280.24 146 -- 70.00 -34.24 462.01
22.d.iii size Cum
15 18.00 280.24 148 -- 70.00 -34.24 464.01
22.d.iv Stone boulder of size 300 mm size Cum
Stone dust (HBG stone chips 2.36
16 18.00 280.24 524 131 -- -34.24 901.01
35.b mm and below) Cum
17 36.a Sand for mortar Cum 1139.78 -- -- 1139.78
18 HYSD steel (Fe-500) MT 57000 57000.00
19 Structural steel MT 70000 70000
20 Cement MT 5600 5600
21 P.C drawn wire/H.T wire 4mm) MT 62000 62000

SOR 2021-22 (15%) Page: 189 R.M.R.


22 40 -45 mm metal (Hand broken) Cum 18 280.24 520 70.00 -34.24 836.01
23 Stone boulders of size 150mm Cum 18 280.24 90 ---- 70.00 -34.24 406.01

SOR 2021-22 (15%) Page: 190 R.M.R.