0% found this document useful (0 votes)
43 views90 pages

CON - Q1 - Weekly Plan & Report - ALEM - W43

The document contains weekly progress reports for an IT solutions company across multiple weeks. It shows the percentage completion of various tasks each week, with completion rates ranging from 0-100%. It also contains a second employee's weekly plan and report showing tasks assigned with weights and supervisor notes. The third section is a blank weekly plan and report template for employees to fill out.

Uploaded by

Abenezer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views90 pages

CON - Q1 - Weekly Plan & Report - ALEM - W43

The document contains weekly progress reports for an IT solutions company across multiple weeks. It shows the percentage completion of various tasks each week, with completion rates ranging from 0-100%. It also contains a second employee's weekly plan and report showing tasks assigned with weights and supervisor notes. The third section is a blank weekly plan and report template for employees to fill out.

Uploaded by

Abenezer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 90

IRACK IT SOLUTIONS

Quarter 1 Weekly Plan & Report


No week Number Status Supervisor Expected Challenge
1 week 1 60.00%
2 week 2 40.00%
3 week 3 0.00%
4 week 4 100.00%
5 week 5 60.00%
6 week 6 80.00%
7 week 7 50.00%
8 week 8 60.00%
9 week 9 10.00%
10 week 10 60.00%
520.00%
NS
Report
Expected Challenge
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior Network and Security Engineer
NO check box Description Task Weight Supervisor
1 ✘ TRUE preparing compliance table for OMO 5.00%
2 ✘ TRUE BoQ for OMO 25.00%
3 ✘
TRUE Scan and merge all testimonials in one 20.00%
4 ✘
TRUE Merge legal doc in one 5.00%
5 FALSE Support mekia on import license and capital i 10.00%
6 ✘
TRUE preparing for the HCIA exam 5.00%
7 FALSE studying the CCNA course 30.00%
8 FALSE 0.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 60.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
From Nov 21 To Nov 25, 2022
s.com
curity Engineer
Supervisor Task Type Challenge
Training
Pre-Sales
project
Support

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior Network and Security Engineer
NO check box Description Task Weight Supervisor
1 ✘ TRUE Taking the HCIA Exam 40.00%
2 ✘ FALSE studying the CCNA course 60.00%
3 FALSE 10.00%
4 FALSE 10.00%
5 FALSE 10.00%
6 FALSE 10.00%
7 FALSE 10.00%
8 FALSE 10.00%
9 FALSE 10.00%
10 FALSE 10.00%
total (100%) 40.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Nov 27, 2022
s.com
curity Engineer
Supervisor Task Type Challenge
Training
Pre-Sales
project
Support

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior Network and Security Engineer
NO check box Description Task Weight Supervisor
1 FALSE studying the CCNA course 70.00%
2 ✘ FALSE studying LLD design of wollo university 30.00%
3 FALSE 10.00%
4 FALSE 10.00%
5 FALSE 10.00%
6 FALSE 10.00%
7 FALSE 10.00%
8 FALSE 10.00%
9 FALSE 10.00%
10 FALSE 10.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Dec 05 - 09, 2022
s.com
curity Engineer
Supervisor Task Type Challenge
Training
Pre-Sales
project
Support

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior Network and Security Engineer
NO check box Description Task Weight Supervisor

1 TRUE electric wire installation for rooms 1-4 20.00% Habtamu


controlling morale works on some portions
2 ✘
TRUE of rooms 1-4 20.00%

controlling board works on some portions of


3 TRUE the rooms 1-4 10.00%

controlling gypsum works on some portions


4 TRUE of the rooms 1-4 10.00%

controlling civil works in the rooms, such as


5 TRUE plastering the walls with cement. 10.00%
6 TRUE network cable installation for rooms 1-4 30.00%

7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 100.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
OLUTIONS
& REPORT
Date: Dec 18 - 25, 2022
s.com
curity Engineer
Supervisor Task Type Challenge

Habtamu project

project

project

project

project
project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior Network and Security Engineer
NO check box Description Task Weight Supervisor
1 FALSE Studying the HCIP Course 30.00%
2 ✘ FALSE electric wire installation for rooms 5&6 10.00%
3 ✘
TRUE network cable
Controlling installation
morale works for rooms
in some 5&6
portions 20.00%
4 ✘
TRUE of rooms 1-4 20.00%
✘ controlling board works on some portions of
5 TRUE rooms 1-4 10.00%

controlling gypsum works on some portions


6 TRUE of the rooms 1-4 10.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 60.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
OLUTIONS
& REPORT
Date: Dec 25, 2022 - Jan 01, 2023
s.com
curity Engineer
Supervisor Task Type Challenge
Training
ed due to some other civil works,
projectlike reconstructing the windows and demolishing the ceramics in the room, which were need
project
project

project

project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior Network and Security Engineer
NO check box Description Task Weight Supervisor
1 FALSE electric wire installation in room 6 10.00%
2 ✘ FALSE network cable installation in room 6 10.00%
✘ completing some activities left for rooms
3 TRUE one throughmorale;
controlling four and gypsum work for 40.00%

4 TRUE rooms five and six 30.00%
5 ✘
TRUE getting back to Addis Ababa 10.00%
6 FALSE 0.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 80.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
OLUTIONS
& REPORT
Date: Jan 02-04,2032
s.com
curity Engineer
Supervisor Task Type Challenge
project
project

project
project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior Network and Security Engineer
NO check box Description Task Weight Supervisor
completing Nutanix sizing associate
1 ✘ TRUE training. 40.00%
2 ✘ FALSE Studying the HCIP Course 10.00%
✘ studying the manuals
adding some forthe
designs of thetwo
devices
class that
rooms
3 TRUE will be deployed at Wollo University.
to the Wollo University LLD that are not yet 10.00%
4 FALSE included. 40.00%
5 FALSE 0.00%
6 FALSE 0.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 50.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Jan 16-21,2023
s.com
curity Engineer
Supervisor Task Type Challenge
Training
Training

project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior Network and Security Engineer
NO check box finalizing some designs ofTask
Description the two Weight Supervisor
classrooms for the Wollo University LLD
1 ✘ TRUE that are not yet included. 30.00%
2 ✘ TRUE to go to wollo university site 10.00%
✘ studying for the Comvault Technical Sales
3 TRUE Professional (SE) certification 20.00%
4 FALSE revising and understanding WU LLD 20.00%
5 FALSE studying for the sophos security training 20.00%
6 FALSE 0.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 60.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Jan 23 - 29,2023
s.com
curity Engineer
Supervisor Task Type Challenge
project

training
project
training

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior Network and Security Engineer
NO check box Description Task Weight Supervisor
1 ✘ TRUE revising and understanding WU LLD 5.00%
2 ✘ FALSE Studying the HCIP Course 5.00%
wollo university SCR project civil and
3 FALSE electrical item sourcing 10.00%
4 FALSE woldia university award 5.00%
5 FALSE OFAG AV bid response 10.00%
6 ✘ TRUE network cable installation in room 6 5.00%
7 FALSE finalizing some activities left for room 5 5.00%
controlling electric wire installation for
8 FALSE rooms 6 through 10 10.00%
network cable installation for rooms 6
9 FALSE through 10 40.00%
controlling morale, gypsum, board and
10 some civil works for rooms 5 through 10 5.00%
total (100%) 10.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Jan 30 - Feb 04 2023
s.com
curity Engineer
Supervisor Task Type Challenge
project
Training

project
Support
project
project
project

project

project

project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor
✘ Collect performa invoice for WU HDMI
1 TRUE cable 20.00%
2 ✘ FALSE finalizing TP for OFAG 10.00%
3 FALSE Finalizing TC for
Finalizing the OFAG
wiring diagrams of the tasks 10.00%
4 ✘
TRUE to be deployed on OFAG 20.00%
5 FALSE Studying the HCNP course 10.00%
6 FALSE NSE4 training 10.00%
7 ✘
TRUE preparing furniture PO 20.00%
8 FALSE 0.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 60.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Feb 20 - Feb 24,2023
s.com
urity engineer
Supervisor Task Type Challenge

project
project
project
project
training
training
project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

1 TRUE finalizing TP for OFAG 10.00%


2 ✘ FALSE Studying the HCNP course 10.00%
3 ✘
TRUE Finalizing TC for OFAG 10.00%
4 FALSE NSE4 training 20.00%
5 FALSE Studying the HCNP course 10.00%
6 FALSE finalizing some documents left for OFAG 10.00%
✘ finalizing project management document for
7 ✘ TRUE OFAG 10.00%
finalizing the project schedule for OFAG
8 TRUE using pmp software 20.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 50.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Feb 27 - Mar 03,2023
s.com
urity engineer
Supervisor Task Type Challenge

project
training
project
training
training
training

project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor
✘ finalize OFAG Bid response printing for
1 TRUE Convergence 20.00%
✘ understand basic Networking (VLAN,
2 FALSE Routing, NAT) concepts. 5.00%
3 TRUE Finalizing OFAG TC for Irack 5.00%

4 FALSE NSE4 training 5.00%


5 ✘
TRUE finalize OFAG Bid response for Irack 15.00%
finalizing some OFAG documents left for
6 FALSE Irack 10.00%

finalizing project management document for


7 ✘ TRUE OFAG 20.00%
finalizing the OFAG project schedule for
8 TRUE Irack using pmp software 15.00%
9 TRUE Install GNS3 and add IOS images 5.00%

Design Layer 3 Network and Configure


VLAN, Interfaces, Routing and NAT in
10 FALSE GNS3 10.00%
total (100%) 80.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Mar 06 - 10,2023
s.com
urity engineer
Supervisor Task Type Challenge

project

training
project
training
project

project

project

project
training

training

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

1 FALSE Sign woldia university contract 20.00%


2 ✘ FALSE Finalizing woldia university LLD and NIP 30.00%
3 FALSE NSE4 training 10.00%
4 FALSE working on assigned pre-sales tasks 10.00%
5 FALSE wollo university Electric lock installation 20.00%
6 TRUE Networking lab practice 10.00%
7 FALSE 0.00%

8 FALSE 0.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 10.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Mar 13 - 17,2023
s.com
urity engineer
Supervisor Task Type Challenge

project
project
training
Pre-Sales
project
training

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

1 FALSE Sign woldia university contract 10.00%


2 ✘ FALSE Finalizing woldia university LLD and NIP 30.00%
3 FALSE NSE4 training 10.00%
4 FALSE working on assigned pre-sales tasks 5.00%
5 FALSE wollo university Electric lock installation 10.00%
6 FALSE Networking lab practice 30.00%
7 FALSE HCNP training 5.00%
8 FALSE 0.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Mar 20 - 24,2023
s.com
urity engineer
Supervisor Task Type Challenge

project
project
training
Pre-Sales
project
training
training

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

1 FALSE Networking lab practice on GNS 3 25.00%


2 ✘ FALSE working on woldia university LLD and NIP 30.00%
3 FALSE NSE4 training 30.00%
4 FALSE working on assigned pre-sales tasks 5.00%
5 FALSE wollo university Electric lock installation 10.00%
6 FALSE 0.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Mar 27 - 31,2023
s.com
urity engineer
Supervisor Task Type Challenge

training
I went to Wollo on Monday to deliver the attachment and receipt.
project
I went to Wollo on Monday to deliver the attachment and receipt.
training
Pre-Sales
project
training

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor
configuration practice for the firewall and
1 FALSE servers on GNS 3 25.00%
2 ✘ FALSE working on woldia university LLD and NIP 30.00%
3 FALSE NSE4 training 30.00%
4 FALSE working on assigned pre-sales tasks 15.00%
5 FALSE 0.00%
6 FALSE 0.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Apr 03 - 07,2023
s.com
urity engineer
Supervisor Task Type Challenge

I went to MAUproject
to deliver the paper and I was working on wollo university poject nodes
project
training
Pre-Sales

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor
checking the contuinity of each data cables
1 FALSE using multimeter for rooms 1 - 5 10.00%

2 FALSE labeling each data cables for rooms 1 - 5 20.00%
finalizing wollo university data nodes for
3 FALSE rooms 1 - 3 the sockets installation for rooms
controlling 40.00%
4 FALSE 1-5 5.00%
mounting the electric lock holder for the
5 FALSE electric lock system for rooms 1–10. 25.00%
6 FALSE 0.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Apr 10-14,2023
s.com
urity engineer
Supervisor Task Type Challenge

project

project

project
project

project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor
configuration practice for the firewall and
1 FALSE servers on GNS 3 15.00%

2 FALSE NSE4 training 20.00%
3 FALSE working
studying on
theassigned pre-salesoftasks
implementation Wollo 20.00%
4 FALSE University Project devices. 45.00%
5 FALSE 0.00%
6 FALSE 0.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Apr 10-14,2023
s.com
urity engineer
Supervisor Task Type Challenge

I training
was purchasing some items for the Wollo University project.

training
project
project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor
configuration practice for the firewall and
1 FALSE servers on GNS 3 20.00%

2 FALSE working on assigned pre-sales tasks 30.00%
studying the configuration of Wollo
3 FALSE University Project devices. 50.00%
4 FALSE 0.00%
5 FALSE 0.00%
6 FALSE 0.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Apr 24-28,2023
s.com
urity engineer
Supervisor Task Type Challenge

training

training

Pre-Sales

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

1 FALSE finalize EDRMC bid response 50.00%



2 FALSE working on assigned pre-sales tasks 30.00%
studying the configuration of Wollo
3 FALSE University Project devices. 10.00%
4 FALSE to go to wollo university 5.00%
5 FALSE finalize review and update LLD of WU 5.00%
6 FALSE 0.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: May 1-5,2023
s.com
urity engineer
Supervisor Task Type Challenge

project

Pre-Sales

project
project
project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor
Crimping and testing each data cables for
1 FALSE rooms 1 through 10 25.00%

2 FALSE working on assigned pre-sales tasks 5.00%
labeling and testing each data cables for
3 FALSE rooms 6 through 10 20.00%
4 FALSE maglock installation for rooms 1 through 5 25.00%
checking each power switches and wall
5 FALSE sockets 5.00%
installing and testing each node for rooms 1
6 FALSE through 5 20.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: May 15-19,2023
s.com
urity engineer
Supervisor Task Type Challenge

project

Pre-Sales

project
project

project

project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

punching down into a patch panel and


testing them for the last 5 classrooms (45
1 FALSE cables) 50.00%

2 FALSE working on assigned pre-sales tasks 5.00%
maglock installation including the USB cable
3 FALSE for all rooms (10) 30.00%
4 FALSE finalizing other remaining tasks on the site 15.00%
5 FALSE 0.00%
6 FALSE 0.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: May 29- June 03,2023
s.com
urity engineer
Supervisor Task Type Challenge

project

Pre-Sales

project
project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

punching down into a patch panel and


testing them for the last 5 classrooms (45
1 FALSE cables) 50.00%

2 FALSE working on assigned pre-sales tasks 5.00%
maglock installation including the USB cable
3 FALSE for all rooms (10) 30.00%
4 FALSE finalizing other remaining tasks on the site 15.00%
5 FALSE 0.00%
6 FALSE 0.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: June 05- June 10,2023
s.com
urity engineer
Supervisor Task Type Challenge

project

Pre-Sales

Weproject
weren't sure whether we could extend the USB cables or not.
project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

1 FALSE Installing the USB cable for the maglock 20.00%


Drilling the wall and placing the already
✘ installed UTP cable for the exit button of the
2 FALSE maglock 10.00%
installing the remaining data cables (46) on
installing
the ground each data
floor andcables (47)the
placing onfiber
the second
cable
3 FALSE floor for the WU expansion project
in the rack room as per the client's request 30.00%
4 FALSE for the WU expansion project. 15.00%
configuring the LCD display board for all
5 FALSE classrooms (10) 10.00%

controlling the electricians, whether they are


6 FALSE installing the power sockets properly or not. 10.00%
7 FALSE working on assigned pre-sales tasks 2.00%
finalizing other remaining tasks for the
8 FALSE smart classroom project 3.00%
9 FALSE 0.00%
10 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: June 12- June 18,2023
s.com
urity engineer
Supervisor Task Type Challenge

project the usb cable is not delivered to us

project

project
project

of time to read about its configuration


project since we were working on data cable installation for the ground and second floors

project
Pre-Sales

project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

1 FALSE Installing the USB cable for the maglock 20.00%


✘ installing 100 data nodes for the first and
2 FALSE second floors for the expansion project 35.00%
reinstalling the maglock for the two rooms
3 FALSE in order to make
configuring it fitdisplay
the LCD with theboard
door for all 5.00%
4 FALSE classrooms(10) 15.00%

controlling the electricians, whether they are


5 FALSE installing the power sockets properly or not. 10.00%
6 FALSE working on assigned pre-sales tasks 2.00%
finalizing other remaining tasks on the smart
7 FALSE classroom and expansion project 3.00%
travelling to MAU to see the site on
8 FALSE Thursday 10.00%
9 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: June 19- June 25,2023
s.com
urity engineer
Supervisor Task Type Challenge

project the usb cable is not delivered to us

project

project I goes to MAU


project

project
Pre-Sales

project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

1 FALSE Installing the USB cable for the maglock 5.00%


✘ installing the remaining 38 nodes on smart
2 FALSE classroom project 20.00%
reinstalling the maglock for the two rooms
3 FALSE in order to make
configuring it fitdisplay
the LCD with theboard
door for all 5.00%
4 FALSE classrooms(10) 5.00%

controlling the electricians, whether they are


5 FALSE installing the power sockets properly or not. 10.00%
6 FALSE working on assigned pre-sales tasks 2.00%
finalizing other remaining tasks on the smart
7 FALSE classroom and expansion project 3.00%
mounting the devices for smart classroom if
8 FALSE they are delivered to us 50.00%
9 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: June 26- July 2 ,2023
s.com
urity engineer
Supervisor Task Type Challenge

We have installed the 4 cables,


projectand we will install the remaining 6 cables next week if they are delivered to us.

project

project
project

project
Pre-Sales

project

the devices weren't delivered to us

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

Installing the remaining USB cables(6) for


1 FALSE the maglock 5.00%
✘ placing each installed wall socket properly
2 FALSE on the expansion project 20.00%
reinstalling the maglock for the two rooms
3 FALSE in order to make
configuring it fitdisplay
the LCD with theboard
door for all 5.00%
4 FALSE classrooms(10) 5.00%
oversee the electricians and ensure they are
5 FALSE properly installing the power sockets 10.00%
6 FALSE working on assigned pre-sales tasks 2.00%
finalizing other remaining tasks on the smart
7 FALSE classroom and expansion project 3.00%
mounting the devices for smart classroom if
8 FALSE they are delivered to us 30.00%
arranging the tables and chairs on the smart
9 FALSE classrooms 20.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: July 3 - 8 ,2023
s.com
urity engineer
Supervisor Task Type Challenge

project

project

project
project

project
Pre-Sales

project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

mounting all active devices in the remaining


1 FALSE three classrooms 40.00%
✘ installing mic cables for the two large
2 FALSE classrooms 10.00%
finalizing other remaining tasks on the
3 FALSE mounting
installing sesssion
the remaining 38 nodes on the 15.00%
4 FALSE expansion project 15.00%
5 FALSE arranging the cables inside the rack room 15.00%

oversee the electrician and ensure he is


properly installing the power sockets for all
6 FALSE smart classrooms 5.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: July 10 - 17,2023
s.com
urity engineer
Supervisor Task Type Challenge

project

project

project
project
project

Pre-Sales

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor
punching smart classroom nodes, specially
the two UTP cables per class that help the
NMP and other smart classroom active
1 FALSE devices get internet 10.00%
✘ placing rack and punching each cables of the
2 FALSE smart classroom and expansion project 10.00%
configuring each device in a smart
3 FALSE classroom if they get internet 50.00%
4 FALSE card reader functionality test 15.00%

finalizing other remaining tasks in the smart


classroom project including mounting all
5 FALSE interactive displays 10.00%

6 FALSE asking the WU ICT staff for rack and switch 5.00%

out of plan, we have punched the each


cables of the expansion project (176) and
also six rooms from the smart classrooms
7 FALSE (54) 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: July 17 - 23,2023
s.com
urity engineer
Supervisor Task Type Challenge

project

project

Weproject
have done some configuration that didn't need internet access
project the devices didn't get internet

project

we got the rack, but we didn't get the switches yet


Pre-Sales

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

Testing each punched expansion project


1 FALSE nodes 30.00%
✘ finalizing the remaining configurations for
2 FALSE the devices 30.00%
crimping the remaining 36 nodes of the
3 FALSE expansion project 10.00%
4 FALSE card reader functionality test 15.00%
finalizing other remaining tasks in the smart
5 FALSE classroom project 10.00%
6 FALSE asking the WU ICT staff for switch 5.00%
out of plan, we have also crimped 43 (5m
7 FALSE patch cords) 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: July 24- 30,2023
s.com
urity engineer
Supervisor Task Type Challenge

project

idn't configure the devices for the remaining classrooms because we couldn't have our laptops due to the entrance exam.
project

project
We couldn't test it because there is no internet on campus.
project

project
Pre-Sales They gave us only one for testing purposes.

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

1 FALSE crimping 230 patch cords 25.00%


doing some other activities that don’t
✘ require internet access, such as podium
2 FALSE work. 25.00%

Re-punching the 46 cables from the rack


side, we have
supporting punched
and workingallwith
of the
thecables, but
electrician
some of them are not functioning properly
in order to complete the power issues on
3 FALSE due
time,toincluding
the fault installing
on the patch
thepanel.
remaining 10.00%
4 FALSE sockets on the expansion project. 15.00%
finalizing other remaining tasks in the smart
5 FALSE classroom project 10.00%
6 FALSE asking the WU ICT staff for switch 5.00%
7 FALSE As built document preparation 10.00%
8 FALSE 0.00%
9 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: July 31- Aug 6,2023
s.com
urity engineer
Supervisor Task Type Challenge

project

project

project
project

project
Pre-Sales

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

Preparing Smart classroom LLD for Samara


1 FALSE university 20.00%

2 FALSE preparing CCTV LLD for Samara University 30.00%
site survey at Samara university starting
3 FALSE from Tuesday 50.00%
4 FALSE 0.00%
5 FALSE 0.00%
6 FALSE 0.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Sep 18- 23,2023
s.com
urity engineer
Supervisor Task Type Challenge

project

project it is in progress

project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

Preparing Smart classroom LLD for Samara


1 FALSE university 10.00%

2 FALSE preparing CCTV LLD for Samara University 20.00%
Preparing site survey report and design for
3 FALSE SU project 50.00%
giving clarification(presentation) about the
project to the Samara University vice
4 FALSE president. 20.00%
5 FALSE 0.00%
6 FALSE 0.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Sep 25- 29,2023
s.com
urity engineer
Supervisor Task Type Challenge

project

project it is in progress

project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

1 FALSE Preparing SCS design for samara university 20.00%



2 FALSE Finalizing CCTV LLD for Samara University 30.00%
3 FALSE finalizing device distribution table 10.00%

4 FALSE finalizing Google earth fiber and cctv design 20.00%


5 FALSE Finalizing BOM for the CCTV 20.00%
6 FALSE 0.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Sep 25- 29,2023
s.com
urity engineer
Supervisor Task Type Challenge

project

project Some parts are still in progress


project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

Placing each bullet camera in visio for


1 FALSE improved visisbility 10.00%
inserting the camera distribution screenshots
✘ into the LLD anf finalizing the camera
2 FALSE distribution design 30.00%

Determining the length of FTP cable


required for the outdoor PTZ cameras,
calculating the length of UTP cable required,
and determining the length of power cable
needed for the bullet cameras situated along
3 FALSE the campus fence. 10.00%
Including the camera installation and
4 FALSE activation process in the LLD. 30.00%
Updating the LLD based on the provided
5 FALSE comments and suggestions 20.00%
6 FALSE 0.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Oct 9- 13,2023
s.com
urity engineer
Supervisor Task Type Challenge

project

project it is in progress

project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor
Determining the length of FTP cable
required
Includingfor
thethe outdoor
camera PTZ cameras,
installation and
1 FALSE activation process in the LLD.cable required,
calculating the length of UTP 20.00%
and determining the length of power cable
✘ needed for the bullet cameras situated along
2 FALSE the campus fence. 10.00%
Determining the amount of fiber cores,
3 FALSE which are going to be spliced 5.00%
Finalizing the LLD based on the provided
4 FALSE comments and suggestions 10.00%
Working on the floor designs for the indoor
5 FALSE dome and fisheye cameras 55.00%
6 FALSE 0.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Oct 16- 20,2023
s.com
urity engineer
Supervisor Task Type Challenge

project

project

project

it is in progress

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

Updating the Samara University LLD based


1 FALSE on provided comments and suggestions 30.00%

2 FALSE Studying chapter one of the CCNA course 10.00%

Determining the length of FTP cable


required for the outdoor PTZ cameras,
calculating the length of UTP cable required,
and determining the length of power cable
needed for the bullet cameras situated along
3 FALSE the campus fence 10.00%

4 FALSE Updating BOM for SU project 10.00%


5 FALSE Preparing SPG document for SU 25.00%
6 FALSE Preparing supplementary materials for SU 15.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Oct 23- 27,2023
s.com
urity engineer
Supervisor Task Type Challenge

project

Training

project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor
To go to Samara University and finalize the
remaining site survey for CCTV, especially
for the one-card system at Samara
1 FALSE University starting from Monday. 70.00%
Updating SU supplementary materials
✘ document based on provided comments and
2 FALSE suggestions 5.00%
Updating the design in LLD based on the
3 FALSE provided comment 5.00%
Updating SU-SPG document based on
4 FALSE provided comments and suggestions 5.00%
Collecting the award letter for the samara
5 FALSE university project 15.00%
6 FALSE 0.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Oct 30 - Nov 3,2023
s.com
urity engineer
Supervisor Task Type Challenge

project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Junior network and security engineer
NO check box Description Task Weight Supervisor

1 FALSE Studying chapter two of the CCNA course 20.00%


✘ SD for Smart city with Dahua smart city
2 FALSE solution 50.00%
Updating the design in LLD based on the
3 FALSE provided comment 10.00%
Updating SU-SPG document based on
4 FALSE provided comments and suggestions 10.00%

Updating SU supplementary materials


document based on provided comments and
5 FALSE suggestions 5.00%
Wollo University ATP submition and
6 FALSE Payment collection. 5.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Nov 6 - 10,2023
s.com
urity engineer
Supervisor Task Type Challenge

project

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department network and security engineer
NO check box Description Task Weight Supervisor

1 FALSE Studying at least 40% of the CCNA course 75.00%


✘ SD for Smart city with Dahua smart city
2 FALSE solution 25.00%
3 FALSE 0.00%

4 FALSE 0.00%
5 FALSE 0.00%
6 FALSE 0.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Nov 6 - 10,2023
s.com
ngineer
Supervisor Task Type Challenge
course. I couldn't accomplish
the 40% plan due to a family
situation.

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department network and security engineer
NO check box Description Task Weight Supervisor

Updating and finalizing the SU LLD based


1 FALSE on Mulugeta’s comments and suggestions. 40.00% Mulugeta
✘ Updating the SPG and supplementary
2 FALSE material documents 15.00%
SD for Smart city with Dahua smart city
3 FALSE solution 10.00%
Semara university Advance payment
4 FALSE collection 10.00%
5 FALSE finalize SCR ATP 15.00%
6 FALSE SU support AP troubleshooting 10.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Nov 27 - Dec 01, 2023
s.com
ngineer
Supervisor Task Type Challenge

Mulugeta

In progress

In progress

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Network and security engineer
NO check box Description Task Weight Supervisor

Reviewing Data center solutions of different


1 FALSE vendors 30.00% Mulugeta

2 FALSE SU support AP troubleshooting 25.00% Mulugeta
SD for Smart city with Dahua smart city
3 FALSE solution 15.00%
Semara university Advance payment
4 FALSE collection 10.00%
Updating the SPG and supplementary
5 FALSE material documents 10.00%
Updating and finalizing the SU LLD based
6 FALSE on Mulugeta’s comments and suggestions. 10.00%

Unplanned task 1 (finalizing DBE


7 FALSE installation and implementation document) 0.00%
Unplanned task 2 (Submitting the extended
8 FALSE DBE bid) 0.00%

Unplanned task 3 (Checking whether the


sample LED sign of wollo university is
ready or not and then ordering it for the
9 FALSE remaining 9 classrooms as well ) 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Dec 4- 8, 2023
s.com
engineer
Supervisor Task Type Challenge

Mulugeta

Mulugeta

In progress

W
Spent Notes
-
-
Floor, 2nd
37
CONVERGENCE IT SOLUTIO
WEEKLY PLAN & REPOR
Employee Name Alem G/selassie
Employee Id [email protected]
Department Network and security engineer
NO check box Description Task Weight Supervisor

reviewing the selected data center vendors


1 FALSE and initiating communication with them 40.00% Mulugeta

2 FALSE SU support AP troubleshooting 30.00% Mulugeta
Finalizing SD for Smart city with Dahua
3 FALSE smart city solution 30.00%

4 FALSE 0.00%
5 FALSE 0.00%
6 FALSE 0.00%
7 FALSE 0.00%
8 FALSE 0.00%
9 FALSE 0.00%
total (100%) 0.00%
BUDGET OVERVIEW
Category Spent
- -
-
Adwa St. 4 Kilo, NibBldg. Ground Floor, 2nd
Office # 02 P.O.Box:- 15637
Addis Ababa, Ethiopia.
Tel: +251111704577
www.iracktech.com
SOLUTIONS
& REPORT
Date: Dec 11- 15, 2023
s.com
engineer
Supervisor Task Type Challenge

Mulugeta

Mulugeta

W
Spent Notes
-
-
Floor, 2nd
37