Design Verification

This document provides a design verification plan and report for flat glass produced by Acme Suppliers. It outlines one test, a ball drop test, to verify the glass meets a 95% durability requirement after being dropped from one meter. The test will be conducted by a test lab on prototype A samples, with a target completion date. The report will authorize the results if the glass is not broken after dropping steel balls from one meter as required.

Uploaded by

saquib
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views

Design Verification

This document provides a design verification plan and report for flat glass produced by Acme Suppliers. It outlines one test, a ball drop test, to verify the glass meets a 95% durability requirement after being dropped from one meter. The test will be conducted by a test lab on prototype A samples, with a target completion date. The report will authorize the results if the glass is not broken after dropping steel balls from one meter as required.

Uploaded by

saquib
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

DESIGN VERIFICATION PLAN AND REPORT

Supplier Name Acme Suppliers Part Number Latest Version/ Changes Revision 00 Part Description Flat Glass

Specification & Method Test Description Acceptance Criteria Test Stage Target Requirements Sample Type Sample Level Actual Results Additional Notes
Specification Provide a brief Specify test targets and/or ED = Engineering Devel't Testing State required probability Describe the A = Prototype (Handmade) List results in terms Describe or
governing test description
of each test. pass/not pass criteria. DV = Design Verification or durability and confidence sample to be B = Prototype (Tooled) of reliability or elaborate on
& test method used PV = Production Validation of meeting acceptance tested (see C = Production Tool (Not Process) probability as appropriate sub-phases
(if applicable). CCT = Continued Compliance Test criteria sample level) D = Production Tool and Process

Test Plan Test Report


Test Specification Acceptance Test Notes Test Timing Est. Sample Timing Sample Pass/ Actual Additional
ID & Test Method Test Description Criteria Phase (Plan) Responsibility Start Comp. Qty Type Act. Comp. No. Level Not Pass Results Notes
247 Ball Drop Test steel balls 95% durability at 95% Miscellaneous notes
Test Lab AS
dropped from a DD/MM/ 1 P Pass Glass not
one meter height
XX time of usage durability related to planned test
YYYY DD/MM/YYY per
establ
P DD/MM/YYYY broken,
Notes Ref. No. NT/FG/BDT

ished found
plan satisfactory

Verification Report Authorization


I affirm that the samples used for verification testing are representative of our parts, and I authorize the use of the des.

Authorized Signature Title Date

QMS-F-0674
Rev. 1 Page 1 of
Doc. No.: GGC/D&D/06 - 00