0% found this document useful (0 votes)
409 views2 pages

DSTI Supervisors Daily Safet Task Instruction-AF

This document is a daily checklist for supervisors to ensure safety tasks are completed at a construction project. It includes checking that work areas have safe access and egress, are free of trip and fall hazards, and are cleaned at the start and end of each shift. Supervisors must also ensure hand and power tools are safe to use, excavations are barricaded, fall protections like harnesses have double lanyards, and workers using equipment or working at height have the correct inspections and equipment. The checklist is signed off on a daily basis to document completion of the safety tasks.

Uploaded by

Ian Kibet
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
409 views2 pages

DSTI Supervisors Daily Safet Task Instruction-AF

This document is a daily checklist for supervisors to ensure safety tasks are completed at a construction project. It includes checking that work areas have safe access and egress, are free of trip and fall hazards, and are cleaned at the start and end of each shift. Supervisors must also ensure hand and power tools are safe to use, excavations are barricaded, fall protections like harnesses have double lanyards, and workers using equipment or working at height have the correct inspections and equipment. The checklist is signed off on a daily basis to document completion of the safety tasks.

Uploaded by

Ian Kibet
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

SUPERVISORS DAILY SAFE TASK INSTRUCTION

PROJECT NAME: Project Id:

Responsible Person: Site:

Week: -
Week No___
Frequency - Daily
-
Mon Tue Wed Thu Fri Sat Sun
Actions required
Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA
Safe Access & Egress to all Work Areas
No Trip Slip Fall Hazards
Work Area Clean (Start & End of Shift)
Hand-tools Safe for use
Power-tools Safe for use
Excavations Barricaded
Solid Barricading & Covers (openings/edges)
PPE Available and use Enforced
Double lanyards on all Harnesses
Lanyards attached to all tools used at Height
All Working at Height Equipment Inspected
All Person Sober & Fit for Duty
No Open Electrical Wires
Corrective action taken:

Inspection Date

Inspectors Signature

Page 1 of 1