Bill of Materials
Bill of Materials
LOCATION :LOT 26, BLOCK 16, STA, LUCIA SUBDIVISION, BO, BUENAVISTA.
GENERAL TRIAS, CAVITE, PHILIPPINES
PREPARED BY:
LOCATION : LOT 26, BLOCK 16, STA, LUCIA SUBDIVISION, BO, BUENAVISTA.
NOTE: This estimate is for Owner's guidance prior to the start of construction in order to ascertain budget
for construction only. Cost is based on current market price.
SUMMARY
Prepared by:
REYNALDO M. RAMOS & ASSOCIATES
architects designers planners
1/4
I.CONRETE AND MASONRY
2/4
VI.FLOOR FINISH/WALL FINISH
3/
4
IX. LABOR COST 45% OF
ITEM I TO VIII P 2,494,845.00
XI. CONSULTANTS
PROFESSIONAL FEE (CPF): 10% OF (SPPCC) P 803,894.50
4/
4
SPECIFICATIONS
LOCATION : LOT 26, BLOCK 16, STA, LUCIA SUBDIVISION, BO, BUENAVISTA.
PREPARED BY:
SPECIFICATIONS
1.0 DEFINITIONS
Works to be executed under the specifications shall consist of furnishing of all materials,
labor and all necessary construction performance which included clearing, grading
and back filling, construction of the building or structure, Installation of the plumbing
and electrical system, painting and other operation necessary for the
complete construction of the structures, accordance with
the foregoing specifications, plans and drawings.
3.00 LOCATIONS
The building shall be stalked out to grades established by the Architect, according to the
plan set. The Contractor shall store materials and conduct the work in such manner as to
preserve all works set up by the necessitated by the negligence of the labor contractor
shall be borne at his own expense.
The contractor shall make all necessary excavation for foundation to grades indicated on
the drawings without extra compensation. The footing appearing on the plan is designed
for 200lbs per inch bearing power. If this safe bearing power is not obtained at the job site,
the footing design must be altered accordingly.
5.02 Class "A" (1:2:4 MIX) - shall be used for all concrete footings and columns.
1/
6
5.03 Class "B" (1:2/2:5) - shall be sued for all concrete slab and other concrete works.
5.04 MORTAR (1:3 MIX) - shall be used for plastering
6.01 All exterior wall shall be 5 inch concrete hollow blocks good round bars below
sill and above window head horizontally or B-Panel.
6.02 All interior non-load bearing concrete wall be 4 inch concrete hollow blocks,
good brand, reinforce with 3/8" round bar at 40" vertically, 3/8" round bars below window
will and above window head horizontally
or
6.03 All interior concrete wall of living area shall be plastered and painted.
6.04 All internal dry wall shall be 6mm thk gypsum board / hardiflex
7.0 FLOORING
7.05 Toilet & Bath 1.2- Non clip ceramic floor tiles size 6x300x300mm (wall glazed ceramic
tiles size: 6x200x200mm)
7.06 Staircase- Stair run is 300mm & rise is 160mm (non-slid ceramic floor tile.)
7.07 All Bedrooms - Cement screed floor finish is bonded screed. It is directly
connected to the concrete subfloor (substrate) with an adhesive.
Layer with 15x600x600mm polished marble). for future development
8.0 DOORS
8.02 Solid Carved Panel Tanguile Door(40x1000x2100mm) hardwood .To all bedroom
and other doors (Painted finish)
8.03 Marine Plywood Door - For all new toilet & bath doors
8.04 Powder coated sliding aluminum door with White tinted light green panel to
enlarged living.
2/
6
9.00 STAIRCASE RAILING
Stainless steel Handrail and Mid Vertical post with three (3) nos. of 25mm SS horizontal-
vertical railings (with Escutcheon).
10.0 CEILING
10.01 Internal Ceiling - to use Gypsum Board Tray Ceiling & Pine Lining
Boards on aluminum grids with 30mm recessed
gap-painted.
11.00 SCREEN
12.00 WINDOWS
All windows as indicated on the plan shall be powder coated windows panel
with 6mm thick tinted light green glass panel (refer to window schedule).
13.00 LUMBER
14.01 To use rectangular hollow (RHS)/ for roof trusses rafters and purlins section
15.0 ROOFING
15.01 Metal Roofing system-refer to manufacturer manual for fixing at (25) Refer
actual pitch
3/
6
16.00 CARPENTRY WORKS
The labor contractor of the supervisor authorized by the owner must see to it
lumber delivered must be free from gross defects which might impair Its
appearance when exposed. All visible, lumber coming in contact with cement
or stone work shall be coated with coal tar, solignum or any approved
substitute.
18.00 HARDWARES/IRONMONGERY
Lock set made for doors. All doors shall be hang on Three (3)
pieces of 90mmx90mm loose pin hinges Sunrise brand or approved
equivalent.
19.00 PERMITS
All permit and occupancy fees shall be secured by the Contractor, but the
expenses shall be paid by the Owner
20.0 PLUMBING WORKS
The plumbing works shall include water service to all fixtures in the building and allitems
incident to the completion of the works shall conform to the rules and regulations of the
National Waterworks Office. Verification as per existing.
The water service will only be up to the property line and all additional pipes and water
meter shall be at the expense of the owner.
20.03 S-Lon Blue to be used on all cold-water supply lines, size os approved by
local National Water Authority.
20.04 Stainless Steel SS) or copper pipes shall be used to all hot watery
supply line, size as approved by Local /National Water Authority
4/6
21.00 SANITARY WARES AND SANITARY ACCESSORIES
Water closet, wash basin, soap dish, towel rail, paper holder, sanitary wares shall
be Philippine Standard or approved equivalent type and colors to be selected by the
Architect and Owners Sanitary fitting such as faucets, taps shall be Philippine Standard or
approved equivalent.
Interior color is entirely left to the discretion of the supervising Architect and the
owner. All materials shall be delivered in its original container and no dilutions
or mixing of any kind shall be allowed unless specified and approved by the
supervising Architect.
Exterior Color: The following brand of paints to be used.
23.02 All painting shall be done in two (2) coating only (after undercoat)
23.03 Any dirt, smears etc. shall be removed by the painting contractor for the
satisfaction of the Architect/Owner.
Water and electric power during the construction shall be supplied by the
contractor. All construction and installation outside the property line shall be at the
expense of the owner. Consumption of water and electric power bills, used by the
contractor during construction period shall be borne by the contractors.
25.00 FENCE-(PHASE 2)
5) Fencing Height will be verified with subdivision ordinance This item will be
under (phase 2) of scope of works
5/6
26.00 GATE-(PHASE 2)
Pedestrian and main gate shall be steel gate 1500mm height to be referred to
subdivision ordinance this item will be under (phase2) of scope of works.
28.00 LANDSCAPING
29.00 MISCELLANEOUS
30.00 DISCREPANCY
6/6