OCCUPATIONAL SAFETY AND HEALTH PROGRAM & PROVISION OF FIELD OFFICE FOR THE
ENGINEER (RENTAL BASIS)
240
DEMOBILIZATION
5 125 125 5 130 137
3
142 148 19 183 185
6 4
GRAVEL FILL
I CEMENT PLASTER FINISH AA
30 60 75
13 148 154
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT WTD %
MONTHLY PERCENTAGE ACCOMPLISHMENT (%) 2.630 21.167 15.301 4.327 10.417 13.666 14.493 17.999
CUMULATIVE MONTHLY PERCENTAGE ACCOMPLISHMENT (%) 2.630 23.797 39.098 43.425 53.842 67.508 82.001 100
MONTHLY PESO ACCOMPLISHMENT (₱) 1,299,966.14 10,462,503.17 7,563,034.96 2,138,765.59 5,148,953.35 6,754,881.10 7,163,653.73 8,896,612.40
CUMULATIVE MONTHLY PESO ACCOMPLISHMENT (₱) 1,299,966.14 11,762,469.31 19,325,504.27 21,464,269.86 26,613,223.21 33,368,104.31 40,531,758.04 49,428,370.44
PROJECT ENGINEER
MATERIALS ENGINEER
ELECTRICAL ENGINEER
MASTER PLUMBER
FOREMAN
SKILLED WORKER
UNSKILLED WORKER
BACKHOE
DUMPTRUCK
TRANSIT MIXER
BAR CUTTER
BAR BENDER
WELDING MACHINE
CUTTING OUTFIT
TRUCK MOUNTED CRANE
PLATE COMPACTOR
CONCRETE VIBRATOR
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
> PERT/CPM
J.G ORANZA CONSTRUCTION/ WILBEN JOSEF U. TAN
23MB0151-CONSTRUCTION OF HEALTH
EMERGENCY RESPONSE OPERATIONS CENTER,
> WEEKLY PERCENT ACCOMPLISHMENT
> WEEKLY FINANCIAL ACCOMPLISHMENT
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE
RODEL B. TANDUGON TEODY R. GALANG LEODERICK IAN S. SELVIDO, MPA JONATHAN G. BANTUG PERT/CPM 1
> MANPOWER UTILIZATION SCHEDULE
SALMEGA BUILDERS (JV) AUTHORIZED MANAGING OFFICER BRGY. LAGAO, GENERAL SANTOS CITY, SOUTH > EQUIPMENT UTILIZATION SCHEDULE SOUTH COTABATO 1ST
DISTRICT ENGINEERING OFFICE
ENGINEER II/ PROJECT ENGINEER II ENGINEER III/ CHIEF, CONSTRUCTION SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER