0% found this document useful (0 votes)
46 views

Project DEC 2023

Uploaded by

Anand Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
46 views

Project DEC 2023

Uploaded by

Anand Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 2
Department of Electronics Engineering, SVNIT, Surat —7 B, Tech IV (EC) 7 Semester UG Project Exam (EC407) — December, 2023 No. DECE/Project sxamg2008 Date: 08/33/2023 OFFICE ORDER: Below mentioned faculty & staff members of DECE are hereby assigned duty for assessing UG Project Exam approx. scheduled on 7 Dee, 2023. It will be conducted in offline mode only. The presentation with viva/demo must be completed within 30 minutes for each roup (20 mins presentation + 10 mins viva/demo). In each exam panel, a project guide is also kept as per the UG guideline of the institute. However, guide will not evaluate their project group. Moreover, examiners are requested ta submit a hard copy of Extemal Marksheet to respective Lab Assistant immediately after completion of exam. Additionally, guides are requested to submit a hard copy of Internal Marksheet to Yesha Patel on or before 7 Dec 2023 Mr. Ghanshyam Katva is hereby informed to keep all LCD projectors and Computers in working conditions at all locations of Project exam. Further, Mr. Manoj Reshamwala is appointed to collect hard copies of project reports duly signed by guide and examiners for departmental stamp and HOD's sign. He is also informed to instruct for maintaining cleanliness of all rooms. Further, he will also look after recurring expenses for refreshments during project exam. Date: 7/12/2023 (Thursday) Time and Project Group ‘Supporting Staffs Panels & Venue Examiners Session 1 Session 2 10:00am to 1:00pm | _2:30pm to §:30pm Panel-1 Dr. P.N. Patel G13, G34, G19, G25 | G33, G14, G20, G26 Mr. K.N. Umrigar BC307N | Dr. S. Gupta & (Embedded Lab) | Prof. G. Santra Mr. Ashok R, Kothari Dr-Kirti Inamdar Panel-2 Dr. R. N. Dhavse G1, G22, G15, G44, | G21, G2, G16, G43, Mr. Praful M. Patel ECOO7N Dr. Z. M. Patel G47 G48 & (Exam Room) | Dr. P. J. Engineer Mr. Ashok R. Kothari Dr. Vivek Garg, Dr. Shivendra Yadav Panel-3 Dr. J. N. Sarvaiya G5, G31, G40, G50 | G6, G32,G39, G49 Mr. Ashish Gamit ECOO4N Dr. K. P, Upla & (Conference me come ee af Mr R. G. Arthania )r. Raghvendra Pal Load Dr. Partha Das Panel-4 Dr. A. D. Darji G11, G7, G36, G42, | G8, G35, G41, G46 ‘Mr. Sonu EC306N Dr. P.K. Shah GAS & (VLSI Lab) | Dr. Deepak Joshi Mr. Ashok R. Kothari Dr. A. Aacharya Dr. Nitin Chatteri Panel-5 Prof. N. B. Kanirkar | G24, G9, G29, GSI G10, G23, G52, G30 Mrs. Kundan EC406N | Dr. A.S. Mandloi & (Multimedia | Prof. M. C. Patel Mr. Ashok R. Kothari oom Dr. Suresh Dahiya Dr. Sandeep Mishra zs Panel-6 Dr. U. D. Dalal G3, G17, G28, G38 | G4, G18, G27, G37 Mr. Pradeep EC302N Dr. J. N. Patel & (ESD Lab) [Dr S.N.Shah MrR.G, Arthania Dr. Kamal Captain Page 1 of 2 Note for Students: |. UG Project exam will be conducted in offline mode only as per above schedule, PPT presentation is MUST with formal dressing, ‘The total time duration for each group is 30 minutes (Presentation + Viva/demo). Each Project Group has to submit a copy of Project Report to their Guide/Co-guide on or before 20 Noy., 2023 for correction purposes. Then after, each Project Group is instructed to submit soft copy of Project Report in .pdf format to respective jury members through mail on or before 4"* Dec., 2023, 5 PM. 5. Each group is instructed to bring Two Stapled hard copies (Iwo Sided print) of projectreport during exam, eer 6. Procedure to be followed after completion of project exam: * Ifcorrections are given by jury members during project exam, then those corrections are required to incorporate in the project report. Guide will verify all corrections and then Jury members signed the certificates © No of Project report to be printed: © Guide Copy (+ Co-guide copy if any) 0 Department Library Copy © Individual Student's Copy © The certificates paper must be white royal executive bond 85 gsm paper of Ad size ONLY. * The final project report should be Sky Blue Coloured Soft bound hard copy. (Sample Photo of the soft bound report will be shared in the Student’s group) © For the signature of HOD and necessary stamping, you need to submit those copies to DECE, Office. * © After all signatures (ie., jury members, HOD, department stamp), you are required fo ‘submit one copy to guide (One copy to Co-Guide, if any) and one copy to the department Library for record purpose. Department Library Report submission contact: Prof. Golak Santra and Dr. Nithin Chatterji © Further, each project group is informed to submit soft copies of final UG project report and presentation files to Mr. Ghanshaym Katva for departmental record. © Use following format for file names: GXX (write your group number) UG _Project_report_DEC23pdf for project report and GXX (write your group number) Presentation_ DEC 23,pptx for presentation file and put in those file in 2ip folder with name: GXX_UG_Project_DEC 23.2ip. Submit this zip folder io Mr. Ghanshaym Katva, Dr.J.N, Patel & Dr. Shweta Shah Coordinators- UG Project F AMY? Hest, DECE Copy to: 1, All concemed 2. B. Tech (IV) Notice board of Department Page 2 of 2

You might also like