0% found this document useful (0 votes)
20 views

Nodeeval

This document summarizes a competency evaluation of a student, Ryann Edwards, in IMRT planning by clinical instructors Kendra and Tom. The student was evaluated on tasks such as discussing the plan prescription with physicians, accurately fusing imaging studies, contouring anatomy, generating optimal beam angles, and exporting/printing plan data. The student received satisfactory scores on all tasks and passed the overall competency evaluation with a score of 100%.

Uploaded by

api-633057533
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views

Nodeeval

This document summarizes a competency evaluation of a student, Ryann Edwards, in IMRT planning by clinical instructors Kendra and Tom. The student was evaluated on tasks such as discussing the plan prescription with physicians, accurately fusing imaging studies, contouring anatomy, generating optimal beam angles, and exporting/printing plan data. The student received satisfactory scores on all tasks and passed the overall competency evaluation with a score of 100%.

Uploaded by

api-633057533
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

12/14/23, 12:48 PM Typhon Group - EASI System

Survey: "IMRT Planning Competency Evaluation"


Reviewer: Clinical Instructors (KENDRA, Tom)
Reviewee: Students (Edwards, Ryann)
Survey Period: 12/14/2023
Completed: 12/14/2023 1:47:17 PM CT

1. Select the external beam IMRT planning competency from the drop down menu below:

Other

2. If Other competency, specify the type here:

NHL to L Axilla IMRT 5 Fields

about:blank 1/3
12/14/23, 12:48 PM Typhon Group - EASI System
3. Please assign each task a score of Satisfactory or Unsatisfactory.
Unsatisfactory in any essential task constitutes competency failure.
The student will repeat the competency at a later date.

Discusses the plan prescription with the physician. Satisfactory [2 pts]

Loads the patient imaging studies into the planning computer. Satisfactory [2 pts]

Accurately fuses image data sets together. Satisfactory [2 pts]


Additional Comment: PET FUSION PRE and POST CHEMO

Contours the appropriate anatomy on the image data set. Satisfactory [2 pts]

Successfully places the isocenter using simulation data. Satisfactory [2 pts]

Correctly generates optimal beam angles for specific Satisfactory [2 pts]


anatomical area.

Generates plan with appropriate energies. Satisfactory [2 pts]

Able to manipulate ROI/PTV constraints in the optimizer to Satisfactory [2 pts]


obtain an optimal plan.

Accurately optimizes and generates a concomitant boost plan. N/A

Accurately generates an individual DVH or composite DVH (for Satisfactory [2 pts]


correct # of fractions).

Understands the concept of prescribing to a point vs. Satisfactory [2 pts]


prescribing to a volume and is able to adjust the plan %
normalization as needed.

Communicates effectively with physician for plan review and Satisfactory [2 pts]
makes changes as requested.

Exports/Prints appropriate plan data. Satisfactory [2 pts]

Accurately generates the QA for the plan. Satisfactory [2 pts]

Enters in correct parameters for patient chart. Satisfactory [2 pts]

Performs pretreatment checks/calculations. Satisfactory [2 pts]


Additional Comment: IMRT calculations were verified with MU
Check

Observes IMRT QA and analysis of QA. Satisfactory [2 pts]


Additional Comment: Observed with Physics

Observes patient treatment. Satisfactory [2 pts]


Additional Comment: Verified ISO and patient set-up on first
day

Mean: 2.00 of 2 Points: 34 Score: 100.0%

4. Overall rating:

Pass [2 pts]

Mean: 2.00 of 2 Points: 2 Score: 100.0%

Total points for all rating scale questions: 36


Mean percentage score for all rating scale questions: 100.0%
(Each main question equally weighted)

about:blank 2/3
12/14/23, 12:48 PM Typhon Group - EASI System

Responses as of 12/14/2023 12:48:40 PM CT

about:blank 3/3

You might also like