0% found this document useful (0 votes)
308 views5 pages

BUHISAN NHS-PMRF-for-AIP-2023-2024

The document contains a project monitoring report form from Buhisan National High School. It summarizes several projects implemented in the second semester of the 2022-2023 school year, including their objectives, monitoring dates, accomplishments, issues encountered, and recommendations. Some of the key projects discussed are implementing reading remediation programs, maintaining low dropout rates, providing school-based feeding programs, developing students' talents through extracurricular activities, and educating the school community about solid waste management. The report was signed by the SPT and project team leaders to document the progress and challenges of different initiatives undertaken by the school.

Uploaded by

SA Carael
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
308 views5 pages

BUHISAN NHS-PMRF-for-AIP-2023-2024

The document contains a project monitoring report form from Buhisan National High School. It summarizes several projects implemented in the second semester of the 2022-2023 school year, including their objectives, monitoring dates, accomplishments, issues encountered, and recommendations. Some of the key projects discussed are implementing reading remediation programs, maintaining low dropout rates, providing school-based feeding programs, developing students' talents through extracurricular activities, and educating the school community about solid waste management. The report was signed by the SPT and project team leaders to document the progress and challenges of different initiatives undertaken by the school.

Uploaded by

SA Carael
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Republic of the Philippines

Department of Education
Region XI – Davao Region
Schools Division of Davao City
BUHISAN NATIONAL HIGH SCHOOL
Cluster 13, DepEd Davao City

Office of the School Head

PROJECT MONITORING REPORT FORM


SCHEDULE DATES OF MONITORING
3RD TO 4TH QUARTER OF SY 2022-2023:
MAY 12, 2023

CURRICULUM DEVELOPMENT AND MANAGEMENT

NAME OF PROJECT PROJECT DATE OF ACCOMPLISHEMENTS ISSUES AND PROBLEMS RECOMMENDATIONS SIGNATURE OF

OBJECTIVES MONITORING / STATUS TO DATE / CHALLENGES SPT AND PROJECT

AND TARGETS TEAM LEADER

U-nified To acquire May 12, Subject teachers Student’s Conduct


S-tewards a 2% 2023 identified the absenteeism and seminar-
W-orking for increase in least learned tardiness. workshop for
A-cademe’s the competencies for teachers on
common Proficiency all year levels. Teachers are not Teaching
G-oal Level and well trained to Learners with
GSA of all Interventions handle students Disability.
P-roficiency learning are provided for with special
L-evel and areas. the students needs. Intensify the
who are at risk remediations
G-eneral of getting a Lack of classroom and provide
S-cholastic failing grade. and school different types
A-verage facilities, eg. TLE of activities to
Supplementary Laboratory, cater the
meterials are Science diverse needs
given to cater Laboratory, etc. of students.
the individual
needs of the Provide more
students. school
facilities for
Home visitation the hands on
for the identifed learning of the
students with students.
academic
problems.

BUHISAN NATIONAL HIGH SCHOOL 305499


Address: Km. 20 Buhisan, Tibungco, Davao City
Facebook Page: Buhisan National High School; Email: [email protected]
C-onducive To improve May 12, Conduct of 40- The school lacks Provide an
A-tmosphere is the reading 2023 day reading area where
N-eeded in and Reading corner/library students can
comprehen Remediation where students read and
G-iving sion skills Program to can read on their study.
O-pportunity to of all frustration level own during their
learners in students free time.
R-eading both
E-nhancement to Filipino
A-chieve and
D-reams English
Languages.
Reading
Remediation All
Program teachers
shall have
been
trained and
oriented
in teaching
reading

LEARNING ENVIRONMENT
P-ay To maintain May 12, Teachers Students are still Undergo peer
A-ttention to a range of 2023 conducted home absent even after counseling.
D-aily 0% - below visitation to the the conducted
A-ttendance & 5% Drop Out students with home visitation.
Y-es Rate Every academic.
O-n School Year
N-o dropped out and to Intervention
provide materials are
interventions provided for the
for those students who
students who are at risk
are at-risk of failing.
dropping out.

B-ring out To be able to May 12, A feeding Additional A TLE


N-ourishment & provide a 2023 program was workload for laboratory
H-ealthy living school – conducted to teachers. should be
at based feeding improve the provided to
S-chool program to physical, Insufficient conduct the
FEEDING those mental, and feeding area, feeding.
students psychological eating and
School – Based needing development of kitchen utensils. Intensify the
Feeding Program interventions students. Gulayan sa
(Quality) and to Insufficient funds Paaralan
maintain the to continue the Project in
desired 60-day feeding order to
weight of program. suppliment the
each learner. Feeding
Program

Hire a cook for


the food
preparation.

Implement
fund raising
activities to
continue the
program.

BUHISANIANS To be able to May 12, Successfully Short period of Enough time


GO, FIGHT, provide all 2023 sent time given for the should be
WIN! learners an representatives preparation of given for the
avenue in to extra- events because of preparation.
order for curricular the immediate
them to activities across scheduling of the
BUHISAN NATIONAL HIGH SCHOOL 305499
Address: Km. 20 Buhisan, Tibungco, Davao City
Facebook Page: Buhisan National High School; Email: [email protected]
harness subject areas in Cluster
more their the Cluster
talents and
skills in both
academic
and non-
academic
fields in
learning,
including
sports, arts,
music,
physical
activities,
dances and
the like.

ENVIRONMENT- To be able to May 12, Seminar for The seminar was Conduct a
FRIENDLY implement 2023 Solid Waste only attended by school based
SCHOOL the Solid Management is the YES-O seminar about
SWM for the
(SOLID WASTE Waste Conducted by coordinator.
teachers and
MANAGEMENT Management the DENR students.
PROGRAM Program in Cenro.
every Provide 4 huge
classroom School garbage bins for
and in the beautification the proper
school as a and proper segregation of
whole to waste trash.
have a more segregation are
conducive implemented
environment
for learning.

IMPROVEMENT To be able to May 12, Old blackboards Lack of academic Propose


AND REPAIR of provide a 2023 are replaced and classrooms construction of
Classrooms budget the walls are school buildings
allocation for repainted.
the
improvement
and repair of
classrooms.

STAFF MANAGEMENT AND DEVELOPMENT

P-rogram that To provide May 12, All the programs Unable to conduct A seminar
A-ims training 2023 and school a seminar. must be
T-otal orientation activities conducted and
A-cceptance for and other promotes gender invite
all updates on equality speaker/s
S-tudents the GAD from other
program to agencies to
GAD PROGRAM all students, discuss
Gender and teachers, relevant topics
Development non-teaching that would
Program personnel help all school
(Quality) and parents. personel.

RESOURCES MANAGEMENT AND MOBILIZATION


BUHISAN NATIONAL HIGH SCHOOL 305499
Address: Km. 20 Buhisan, Tibungco, Davao City
Facebook Page: Buhisan National High School; Email: [email protected]
INSTRUCTIONA To be able to May 12, The teachers are The school Provide
L SUPPLIES provide 2023 provided with supplies and additional
AND TEACHING instructional necessary office intructional tools supplies like
AIDS Support supplies and and teaching given are scientific
For Teachers teaching aids supplies to help insufficient to last calculator,
to teachers them in the for the whole science and
every school productive school year. TLE tools, etc.
year delivery of
classroom
instruction
PROVISIONS 90% of the May 12, Availability of Insufficient every Allocate more
OF SCHOOL First Aid Kits 2023 medicine kits to day supply. funds to
FIRST AID KIT, and every provide
EQUIPMENTS Equipment / classrooms. enough supply
AND Supplies of medicine
MEDICINES shall have and first aid
been kits.
purchased in
the given
school year.
ALLOCATIONS To be able to May 12, Acquired own Ensure the
FOR ELECTRIC allocate 2023 electrical power safety and
INSTALLATION, budget for supply and security of the
COMMUNICATI installing internet power supply.
ON AND electric connection.
INTERNET power,
internet
connections
fees and
other fees
related to
school
operations.
ELEVATION OF To be able to May 12, Project partially The window grills Install the
FENCE AND allocate 2023 completed. were not yet window grills
INSTALLATION budget for The fence has installed. to ensure the
OF SCHOOL the safety of been elevated safety of the
GATE, WINDOW students and and the school students.
GRILLS all person in has been
school installed.
vicinity.

COMMUNITY INVOLVEMENT
BNHS ONE BIG To be able to May 12, Activity was
HAPPY FAMILY initiate and 2023 successfully
FAMILY DAY provide an conducted.
avenue for
all parents,
guardians,
stakeholders
(internal and
external) for
a day of fun
and
enjoyment.

Prepared by:

SHIERRA ANNE J. CARAEL


SMEA Coordinator

BUHISAN NATIONAL HIGH SCHOOL 305499


Address: Km. 20 Buhisan, Tibungco, Davao City
Facebook Page: Buhisan National High School; Email: [email protected]
School Monitoring and Evaluation Team:

MIRASOL O. FABUNA
School Principal I/Chair

NICELL-AN E. DEQUINA JUNNY BOY M. TOLEDO


Teacher Representative/Member Parent Representative/Member

CHARLYN B. BIGCAS ZAYNAH Q. AMMAD


CPP Coordinator/Member Student Representative/Member

BUHISAN NATIONAL HIGH SCHOOL 305499


Address: Km. 20 Buhisan, Tibungco, Davao City
Facebook Page: Buhisan National High School; Email: [email protected]

You might also like