0% found this document useful (0 votes)
330 views1 page

Cert of Completion

This certificate certifies that contractor SMPE Construction Trading Corporation has completed 30.871% of the required scope of work for Contract ID No. 23Z00031, which involves the rehabilitation of revetment along the Lower Marikina River on the left bank of Brgy. Caniogan, Pasig City. The project engineer Francis Philip A. Sawali and project manager Martiniano M. Dela Cruz Jr. of the DPWH UPMO-FCMC noted the contractor's accomplishment of 30.871% as of October 31, 2023 according to the approved contract plans and documents.

Uploaded by

upmofcmcdpwh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
330 views1 page

Cert of Completion

This certificate certifies that contractor SMPE Construction Trading Corporation has completed 30.871% of the required scope of work for Contract ID No. 23Z00031, which involves the rehabilitation of revetment along the Lower Marikina River on the left bank of Brgy. Caniogan, Pasig City. The project engineer Francis Philip A. Sawali and project manager Martiniano M. Dela Cruz Jr. of the DPWH UPMO-FCMC noted the contractor's accomplishment of 30.871% as of October 31, 2023 according to the approved contract plans and documents.

Uploaded by

upmofcmcdpwh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

November 9, 2023

Certificate of Percentage of Completion

This is to certify that SMPE Construction Trading Corporation contractor for the
Contract ID No. 23Z00031- Rehabilitation of Revetment along Lower Marikina
River (Downstream of Kaginhawaan Bridge), Left Bank, Brgy. Caniogan, Pasig
City have completed as of October 31, 2023, 30.871% of the scope of work required for
the above-mentioned contract in accordance with the approved plans, specifications and
contract documents hereto.

Accomplishment this Period : 30.871%

Cumulative Accomplishment : 2.096%


as of October 31, 2023

FRANCIS PHILIP A. SAWALI


Project Engineer
DPWH, UPMO-FCMC

Noted:

MARTINIANO M. DELA CRUZ JR.


Project Manager III
DPWH, UPMO-FCMC