Gantt Chart

The document outlines a project timeline consisting of 12 tasks from June 2022 through May 2023. The tasks include research and analysis, requirement gathering, module planning, development in 5 phases, testing, and report design. The project begins with research in June 2022 and is scheduled to be completed with the report design task ending in April 2023.

Uploaded by

Cassian S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views1 page

Gantt Chart

The document outlines a project timeline consisting of 12 tasks from June 2022 through May 2023. The tasks include research and analysis, requirement gathering, module planning, development in 5 phases, testing, and report design. The project begins with research in June 2022 and is scheduled to be completed with the report design task ending in April 2023.

Uploaded by

Cassian S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ID Task Task Name Duration Start Finish 01 May 01 July 01 September 01 November 01 January 01 March 01 May

Mode 02-05 30-05 27-06 25-07 22-08 19-09 17-10 14-11 12-12 09-01 06-02 06-03 03-04 01-05
1
2 Research and Analysis 5 days 01 Jun '22 07 Jun '22
3 Requirement Gathering 27 days 18 Jun '22 25 Jul '22
4 Module Planning 21 days 26 Jul '22 23 Aug '22
5 Disscussion 11 days 24 Aug '22 07 Sep '22
6 Development Phase 1 40 days 08 Sep '22 02 Nov '22
7 Development Phase 2 40 days 03 Nov '22 28 Dec '22
8 Development Phase 3 11 days 29 Dec '22 12 Jan '23
9 Development Phase 4 20 days 13 Jan '23 09 Feb '23
10 Development Phase 5 17 days 10 Feb '23 06 Mar '23
11 Testing Phase 18 days 07 Mar '23 30 Mar '23
12 Report and Diary Design 10 days 17 Apr '23 28 Apr '23

Task External Tasks Manual Task Finish-only


Split External Milestone Duration-only Deadline
Project: Project2
Milestone Inactive Task Manual Summary Rollup Progress
Date: 01 May '23
Summary Inactive Milestone Manual Summary
Project Summary Inactive Summary Start-only

Page 1