LT Loss Calculation

This document contains calculations of energy loss and line transformer voltage ratio (LTVR) for three different distribution transformer centers (DTCs) in Ilkal Sub-Division of Hubli Electricity Supply Company Limited. It provides the circuit details including distance in kilometers and horsepower for each DTC. It calculates the total horsepower-meter, total line length, existing annual energy loss, annual energy loss after upgrading conductors, and estimated annual energy savings for upgrading each DTC. The estimated annual energy savings per kilometer for upgrading from the existing to an improved conductor is also provided.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
188 views55 pages

LT Loss Calculation

This document contains calculations of energy loss and line transformer voltage ratio (LTVR) for three different distribution transformer centers (DTCs) in Ilkal Sub-Division of Hubli Electricity Supply Company Limited. It provides the circuit details including distance in kilometers and horsepower for each DTC. It calculates the total horsepower-meter, total line length, existing annual energy loss, annual energy loss after upgrading conductors, and estimated annual energy savings for upgrading each DTC. The estimated annual energy savings per kilometer for upgrading from the existing to an improved conductor is also provided.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 55

HUBLI ELECTRICITY SUPPLY COMPANY LIMITED

Energy loss & LTVR Calculation for 100 KVA AIHOLE Village DTC in Amingad Section, Ilkal Sub-Division.

CKT-1 CKT-2

KMs 0.05 100 KVA 0.06 0.11 0.05 0.05 0.05 0.12 0.12 0.06 0.06 KMs
DTC

5.00 5.00 30.00 1.00 12.00 2.00 2.00 3.00 2.00 1.00
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 580330.00


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 730 Mtrs
0 0.00 0 0.00 1 1.00 60 60.00
0 0.00 0 0.00 2 3.00 60 540.00 Annual Energy loss -Existing 4ACSR Conductor
0 0.00 0 0.00 3 6.00 120 4320.00 33146 Unit/Annum
0 0.00 0 0.00 4 8.00 120 7680.00 29674 Unit/Annum/ Km
1 5.00 50 1250.00 5 10.00 50 5000.00
Total 50 1250.00 6 22.00 50 24200.00
7 23.00 50 26450.00
8 53.00 110 308990.00 Annual Energy loss -After 2 ACSR Conductor
% LT VR Calculation: 9 58.00 60 201840.00 28628 Unit/Annum
CKT-1 CKT-2 Total 680 579080.00 25629 Unit/Annum/ Km
Before After Before After Annual Energy Savings 4518 Unit/Annum
0.15 0.10 8.20 5.84
1.3 0.9 Avg per Km For 1 KM Avg Annual Energy Savings
1394 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM,Amingad O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 100 KVA MAHATMA OIL MILL DTC in GUDUR village in Gudur Section, Ilkal Sub-Division.

CKT-1 CKT-2

KMs 0.05 100 KVA 0.05 0.08 0.18 0.17 0.05 0.12 0.14 0.06 0.05 KMs
DTC

40.00 7.00 4.00 6.00 4.00 6.00 5.00 3.00 0.50 0.50
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 409152.50


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 945 Mtrs
0 0.00 0 0.00 1 0.50 50 12.50
0 0.00 0 0.00 2 1.00 60 60.00 Annual Energy loss -Existing 4ACSR Conductor
0 0.00 0 0.00 3 4.00 135 2160.00 23369 Unit/Annum
0 0.00 0 0.00 4 9.00 120 9720.00 20921 Unit/Annum/ Km
1 40.00 50 80000.00 5 15.00 50 11250.00
Total 50 80000.00 6 19.00 170 61370.00
7 25.00 180 112500.00
8 29.00 80 67280.00 Annual Energy loss -After 2 ACSR Conductor
% LT VR Calculation: 9 36.00 50 64800.00 20184 Unit/Annum
CKT-1 CKT-2 Total 895 329152.50 18070 Unit/Annum/ Km
Before After Before After Annual Energy Savings 3185 Unit/Annum
1.17 0.84 8.39 5.98
1.5 1.1 Avg per Km For 1 KM Avg Annual Energy Savings
983 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM,Gudur O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 100 KVA SAJJAN DTC in Aminagad village in Aminagad Section, Ilkal Sub-Division.

CKT-1 CKT-2

KMs 0.205 100 KVA 0.14 0.05 0.04 0.05 0.11 0.22 KMs
DTC

40.00 8.00 3.00 10.00 3.00 7.50 2.00


HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 550435.00


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 805 Mtrs
0 0.00 0 0.00 1 0.00 0 0.00
0 0.00 0 0.00 2 0.00 0 0.00 Annual Energy loss -Existing 4ACSR Conductor
0 0.00 0 0.00 3 0.00 0 0.00 31438 Unit/Annum
0 0.00 0 0.00 4 2.00 220 880.00 28145 Unit/Annum/ Km
1 40.00 205 328000.00 5 9.50 105 9476.25
Total 205 328000.00 6 12.50 50 7812.50
7 22.50 40 20250.00
8 25.50 50 32512.50 Annual Energy loss -After 2 ACSR Conductor
% LT VR Calculation: 9 33.50 135 151503.75 27153 Unit/Annum
CKT-1 CKT-2 Total 600 222435.00 24309 Unit/Annum/ Km
Before After Before After Annual Energy Savings 4285 Unit/Annum
3.43 3.43 5.14 3.66
1.3 1.1 Avg per Km For 1 KM Avg Annual Energy Savings
1323 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM,Gudur O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 250 KVA VASTRAD OIL MILL DTC in GUDUR village in GUDUR Section, Ilkal Sub-Division.

CKT-1 CKT-2

KMs 0.1 0.2 250 KVA 0.05 0.05 0.05 0.10 0.20 0.05 KMs
DTC

10.00 40.00 10.00 10.00 30.00 5.00 10.00 5.00


HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 1146250.00


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 800 Mtrs
0 0.00 0 0.00 1 0.00 0 0.00
0 0.00 0 0.00 2 0.00 0 0.00 Annual Energy loss -Existing 4ACSR Conductor
0 0.00 0 0.00 3 0.00 0 0.00 65468 Unit/Annum
0 10.00 100 10000.00 4 5.00 50 1250.00 58611 Unit/Annum/ Km
1 50.00 200 500000.00 5 15.00 200 45000.00
Total 300 510000.00 6 20.00 100 40000.00
7 50.00 50 125000.00
8 60.00 50 180000.00 Annual Energy loss -After 2 ACSR Conductor
% LT VR Calculation: 9 70.00 50 245000.00 56545 Unit/Annum
CKT-1 CKT-2 Total 500 636250.00 50622 Unit/Annum/ Km
Before After Before After Annual Energy Savings 8923 Unit/Annum
4.60 4.60 8.36 5.96
2.0 1.6 Avg per Km For 1 KM Avg Annual Energy Savings
2754 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM,Gudur O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 250 KVA BUS STAND DTC in GUDUR village in GUDUR Section, Ilkal Sub-Division.

CKT-1 CKT-2

KMs 0.1 0.06 0.11 0.165 250 KVA 0.03 0.05 0.05 0.05 0.12 0.10 0.28 KMs
DTC

15.00 10.00 10.00 10.00 20.00 15.00 10.00 10.00 20.00 5.00 2.00
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 1195195.00


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 1115 Mtrs
0 0.00 0 0.00 1 0.00 0 0.00
0 15.00 100 22500.00 2 0.00 0 0.00 Annual Energy loss -Existing 4ACSR Conductor
0 25.00 60 37500.00 3 2.00 280 1120.00 68264 Unit/Annum
0 35.00 110 134750.00 4 7.00 100 4900.00 61114 Unit/Annum/ Km
1 45.00 165 334125.00 5 27.00 120 87480.00
Total 435 528875.00 6 37.00 50 68450.00
7 47.00 50 110450.00
8 62.00 50 192200.00 Annual Energy loss -After 2 ACSR Conductor
% LT VR Calculation: 9 82.00 30 201720.00 58960 Unit/Annum
CKT-1 CKT-2 Total 680 666320.00 52784 Unit/Annum/ Km
Before After Before After Annual Energy Savings 9304 Unit/Annum
5.97 5.97 8.37 5.96
2.2 1.8 Avg per Km For 1 KM Avg Annual Energy Savings
2872 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM,Gudur O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 250 KVA POLICE STATION DTC in AMINAGAD village in Aminagad Section, Ilkal Sub-Division.

250 KVA 0.080 0.020 0.220 0.120 0.040


DTC

15.00 12.00 20.00 4.00 5.00

Circuit-2 Total HP2Mtrs = 480240.00


Distance
Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 480 Mtrs
1 0.00 0 0.00
2 0.00 0 0.00 Annual Energy loss -Existing Copper Conductor
3 0.00 0 0.00 27429 Unit/Annum
4 0.00 0 0.00 24556 Unit/Annum/ Km
5 5.00 40 1000.00
6 9.00 120 9720.00
7 29.00 220 185020.00
8 41.00 20 33620.00 Annual Energy loss -After 2 ACSR Conductor
% LT VR Calculation: 9 56.00 80 250880.00 23690 Unit/Annum
CKT-1 CKT-2 Total 480 480240.00 21209 Unit/Annum/ Km
Before After Before After Annual Energy Savings 3739 Unit/Annum
0.00 0.00 7.60 5.42
1.2 0.8 Avg per Km For 1 KM Avg Annual Energy Savings
1154 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Amingad O & M Sub -division, HESCOM,Ilkal
on.

CKT-2

KMs

HP

um/ Km

um/ Km
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 100 KVA SUNNADA BATTI DTC in AMINAGAD village in Aminagad Section, Ilkal Sub-Division.

100 KVA 0.115 0.225 0.230 0.040 0.100 0.195


DTC

10.00 5.00 3.00 1.00 10.00 2.00

Circuit-2 Total HP2Mtrs = 290560.00


Distance
Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 905 Mtrs
1 0.00 0 0.00
2 0.00 0 0.00 Annual Energy loss -Existing Copper Conductor
3 0.00 0 0.00 16595 Unit/Annum
4 2.00 195 780.00 14857 Unit/Annum/ Km
5 12.00 100 14400.00
6 13.00 40 6760.00
7 16.00 230 58880.00
8 21.00 225 99225.00 Annual Energy loss -After 2 ACSR Conductor
% LT VR Calculation: 9 31.00 115 110515.00 14333 Unit/Annum
CKT-1 CKT-2 Total 905 290560.00 12832 Unit/Annum/ Km
Before After Before After Annual Energy Savings 2262 Unit/Annum
0.00 0.00 8.26 5.89
1.3 0.9 Avg per Km For 1 KM Avg Annual Energy Savings
698 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Amingad O & M Sub -division, HESCOM,Ilkal
on.

CKT-2

KMs

HP

um/ Km

um/ Km
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 100 KVA LAKE DTC in SULEBAVI village DTC in Aminagad Section, Ilkal Sub-Division.

CKT-2
100KVA 0.050 0.100 0.145 0.075 0.030 0.055 0.025 0.030 0.020 KMs
DTC

10.00 3.00 5.00 5.00 6.00 3.00 2.00 5.00 5.00


HP

Circuit-2 Total HP2Mtrs = 435150.00


Distance
Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 530 Mtrs
1 5.00 20 500.00
2 10.00 30 3000.00 Annual Energy loss -Existing Copper Conductor
3 12.00 25 3600.00 24854 Unit/Annum
4 15.00 55 12375.00 22250 Unit/Annum/ Km
5 21.00 30 13230.00
6 26.00 75 50700.00
7 31.00 145 139345.00
8 34.00 100 115600.00 Annual Energy loss -After 2 ACSR Conductor
% LT VR Calculation: 9 44.00 50 96800.00 21466 Unit/Annum
CKT-1 CKT-2 Total 530 435150.00 19218 Unit/Annum/ Km
Before After Before After Annual Energy Savings 3388 Unit/Annum
0.00 0.00 8.33 5.94
1.3 0.9 Avg per Km For 1 KM Avg Annual Energy Savings
1046 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Amingad O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED

Energy loss & LTVR Calculation for 100 KVA KELUR village DTC in Aminagad Section, Ilkal Sub-Division.
CKT-2
100KVA 0.060 0.080 0.060 0.040 0.060 0.170 0.040 0.060 0.050 KMs
DTC

10.00 5.00 8.00 5.00 5.00 5.00 4.00 4.00 3.00


HP

Circuit-2 Total HP2Mtrs = 440350.00


Distance
Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 620 Mtrs
1 3.00 50 450.00
2 7.00 60 2940.00 Annual Energy loss -Existing Copper Conductor
3 11.00 40 4840.00 25151 Unit/Annum
4 16.00 170 43520.00 22516 Unit/Annum/ Km
5 21.00 60 26460.00
6 26.00 40 27040.00
7 34.00 60 69360.00
8 39.00 80 121680.00 Annual Energy loss -After 2 ACSR Conductor
% LT VR Calculation: 9 49.00 60 144060.00 21723 Unit/Annum
CKT-1 CKT-2 Total 620 440350.00 19447 Unit/Annum/ Km
Before After Before After Annual Energy Savings 3428 Unit/Annum
0.00 0.00 8.29 5.91
1.3 0.9 Avg per Km For 1 KM Avg Annual Energy Savings
1058 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Amingad O & M Sub -division, HESCOM,Ilkal
on.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 100 KVA ILAHAL village DTC in Gudur Section, Ilkal Sub-Division.

CKT-1 CKT-2

KMs 0.04 0.2 100 KVA 0.10 0.26 0.33 KMs


DTC

10.00 7.50 15.00 15.00 1.00


HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 228240.00


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 930 Mtrs
1 0.00 0 0.00 1 0.00 0 0.00
2 0.00 0 0.00 2 0.00 0 0.00 Annual Energy loss -Existing Copper/ 4 ACSR Conductor
3 0.00 0 0.00 3 1.00 330 330.00 13036 Unit/Annum
4 10.00 40 4000.00 4 16.00 260 66560.00 11671 Unit/Annum/ Km
5 17.50 200 61250.00 5 31.00 100 96100.00
Total 240 65250.00 Total 690 162990.00

Annual Energy loss -After 2 ACSR Conductor


% LT VR Calculation: 11259 Unit/Annum
CKT-1 CKT-2 10080 Unit/Annum/ Km
Before After Before After Annual Energy Savings 1777 Unit/Annum
2.29 1.63 4.45 3.17
1.0 0.7 Avg per Km For 1 KM Avg Annual Energy Savings
548 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Gudur O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 100 KVA CHITTARAGI VILLAGE DTC in Amingad Section, Ilkal Sub-Division.

CKT-1
0 0.08 0.085 0.155 100
KMs KVA
DTC
0.00 20.00 15.00 20.00 15.00
HP

Circuit-1 Total HP2Mtrs = 605000.00


Distance in
Sl.No HP
Mtrs
HP Mtr
2
Total LT line length = 320 Mtrs
1 0.00 0 0.00
2 20.00 80 32000.00 Annual Energy loss -Existing 4 ACSR Conductor
3 35.00 85 104125.00 34555 Unit/Annum
4 55.00 155 468875.00 30935 Unit/Annum/ Km
Total 320 605000.00

% LT VR Calculation: Annual Energy loss -After 2 ACSR Conductor


CKT-1 29845 Unit/Annum
Before After 0 0 26719 Unit/Annum/ Km
7.69 5.48 0.00 0.00 Annual Energy Savings 4710 Unit/Annum
1.2 0.8 Avg per Km
For 1 KM Avg Annual Energy Savings
1454 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Amingad O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 100 KVA BUS STAND DTC in Sulebhavi village in AMINGAD Section, Ilkal Sub-Division.

CKT-1 CKT-2
0.105 0.075 0.02 0.08 100 0.07 0.04 0.03 0.21 0.08
KMs KVA KMs
DTC
5.00 5.00 8.00 9.00 10.00 6.00 5.00 5.00 20.00
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 454555.00


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 705 Mtrs
1 5.00 105 2625.00 1 0.00 0 0.00
2 10.00 75 7500.00 2 20.00 80 32000.00 Annual Energy loss -Existing 4 ACSR Conductor
3 18.00 20 6480.00 3 25.00 210 131250.00 25962 Unit/Annum
4 27.00 80 58320.00 4 30.00 30 27000.00 23243 Unit/Annum/ Km
Total 280 74925.00 5 36.00 40 51840.00
6 46.00 65 137540.00
Total 425 379630.00
% LT VR Calculation: Annual Energy loss -After 2 ACSR Conductor
CKT-1 CKT-2 22423 Unit/Annum
Before After Before After 20075 Unit/Annum/ Km
2.23 1.59 7.15 5.09 Annual Energy Savings 3539 Unit/Annum
1.4 1.0 Avg per Km
For 1 KM Avg Annual Energy Savings
1092 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Hunagund O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED

STATEMENT SHOWING DPR OF RECONDUCTIORING 0F EXISTING (SQUIRREL) LT LINE (3 PHASE 5 WIRE) BY WEASEL ACSR IN ILKAL TOWN IN SUB-DIVISION OF BAGALKOT
DIVISION

Location for reconductoring of LT


Length of the LT line to
Annual Energy
Name of the 11KV Feeder Name of the Village be reconductored by Details of DTC % VR
Name of the Sub Division

loss in LU's
Weasal ACSR(in Kms)

line by Weasal ACSR


Name of the Division
Name of the District

Name of the Section


Name of the Station

Name of the City

Saving's in LU's
Connected load in KVA

After reconductoring by

Remarks
Sl.N After reconductoring

Capacity in KVA
Existing

Weasal ACSR
o by Weasal ACSR

3 ph 5 W

1 ph 2 W
2 ph 3 W
Sl.No
Existin
Villages Total Name & Location
g

CKT1

CKT2

CKT3

CKT1

CKT2

CKT3
1 F2 Ilkal town Ilkal 1 Ilkal town 1.13 1.13 250 Huded Mahalaxmi 122.81 from DTc 9.24 8.82 6.58 6.28 0.6745 0.5825 0.0919
2 F2 Ilkal town Ilkal 2 Ilkal town 1.02 1.02 250 Near TMC 111.33 from DTc 8.34 8.83 5.94 6.29 0.6774 0.5851 0.0923
3 F2 Ilkal town Ilkal 3 Ilkal town 0.74 0.74 250 Syndicate Bank 137.94 from DTc 8.34 8.11 5.94 5.78 0.8181 0.7066 0.1115
4 F2 Ilkal town Ilkal 4 Ilkal town 0.94 0.94 250 Gaddige Road 144.04 from DTc 8.18 8.61 5.83 6.13 0.8594 0.7423 0.1171
110/33/11 KV MUSS Ilkal

5 F2 Ilkal town Ilkal 5 Ilkal town 1.64 1.64 250 Badiger Saw Mill 192.54 from DTc 8.53 8.33 6.87 6.08 5.93 4.89 2.5186 2.1753 0.3433
6 F2 Ilkal town Ilkal 6 Ilkal town 1.01 1.01 250 Sewarage Pump 141.33 from DTc 8.40 8.31 5.98 5.92 1.2543 1.0834 0.1710
Bagalkot

Bagalkot

7 F2 Ilkal town Ilkal 7 Ilkal town 1.12 1.12 100 Joshi Galli 72.95 from DTc 6.49 7.34 4.62 5.23 0.5329 0.4603 0.0726
Ilkal

Ilkal

8 F2 Ilkal town Ilkal 8 Ilkal town 0.25 0.25 100 Goudar Garrage 62.75 from DTc 7.12 5.08 0.4326 0.3736 0.0590
9 F2 Ilkal town Ilkal 9 Ilkal town 0.41 0.41 100 APMC 48.45 from DTc 8.26 5.88 0.3523 0.3043 0.0480
10 F2 Ilkal town Ilkal 10 Ilkal town 1.15 1.15 100 Govt. Hospital 62.93 from DTc 6.32 6.52 4.51 4.65 0.3294 0.2845 0.0449
11 F2 Ilkal town Ilkal 11 Ilkal town 0.84 0.84 100 Maruti Temple 70.30 from DTc 6.13 6.24 4.37 4.44 0.3541 0.3058 0.0483
12 F2 Ilkal town Ilkal 12 Ilkal town 1.03 1.03 250 Near Darga 126.07 from DTc 8.46 8.81 6.03 6.27 0.7941 0.6859 0.1082
13 F2 Ilkal town Ilkal 13 Ilkal town 0.87 0.87 63 Ganga Kshetra 45.08 from DTc 2.89 7.25 2.06 5.17 0.1373 0.1186 0.0187
14 F2 Ilkal town Ilkal 14 Ilkal town 0.50 0.50 25 Gonal Road Gaddige 19.62 from DTc 4.39 3.13 0.0764 0.0660 0.0104

Asst. Executive Engineer(El.)


O & M Sub -division, HESCOM,Ilkal

713349287.xls Page 23
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED

Reconductoring of LT lines in ILKAL town in O&M Sub Division, HESCOM Ilkal.


Length of
Name of Name of
Name of the Name of the 3Ph,5W
Sl.No the the Sub- Name of the DTC
village/Town 11 KV feeder LT line existing in
Division Division
KM
1 Bagalkot Ilkal Ilkal town F2 Ilkal town Huded Mahalaxmi 1.13
2 Bagalkot Ilkal Ilkal town F2 Ilkal town Near TMC 1.02
3 Bagalkot Ilkal Ilkal town F2 Ilkal town Syndicate Bank 0.74
4 Bagalkot Ilkal Ilkal town F2 Ilkal town Gaddige Road 0.94
5 Bagalkot Ilkal Ilkal town F2 Ilkal town Badiger Saw Mill 1.64
6 Bagalkot Ilkal Ilkal town F2 Ilkal town Sewarage Pump 1.01
7 Bagalkot Ilkal Ilkal town F2 Ilkal town Joshi Galli 1.12
8 Bagalkot Ilkal Ilkal town F2 Ilkal town Goudar Garrage 0.25
9 Bagalkot Ilkal Ilkal town F2 Ilkal town APMC 0.41
10 Bagalkot Ilkal Ilkal town F2 Ilkal town Govt. Hospital 1.15
11 Bagalkot Ilkal Ilkal town F2 Ilkal town Maruti Temple 0.84
12 Bagalkot Ilkal Ilkal town F2 Ilkal town Near Darga 1.03
13 Bagalkot Ilkal Ilkal town F2 Ilkal town Ganga Kshetra 0.87
14 Bagalkot Ilkal Ilkal town F2 Ilkal town Gonal Road Gaddige 0.50
ILKAL Total 12.64

Asst Executive Engineer (El).


O&M Sub-Division HESCOM Ilkal.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED

STATEMENT SHOWING DPR OF RECONDUCTIORING 0F EXISTING (SQUIRREL) LT LINE (3 PHASE 5 WIRE) BY WEASEL ACSR IN HUNAGUND TOWN IN ILKAL SUB-DIVISION OF
BAGALKOT DIVISION

Location for reconductoring of LT


Length of the LT line to
Annual Energy
Name of the Village be reconductored by Details of DTC % VR
Name of the 11KV Feeder
Name of the Sub Division

loss in LU's
Weasal ACSR(in Kms)

line by Weasal ACSR


Name of the Division
Name of the District

Name of the Section


Name of the Station

Name of the Town

Saving's in LU's
Connected load in KVA

After reconductoring by

Remarks
Sl.N After reconductoring

Capacity in KVA
Existing

Weasal ACSR
o by Weasal ACSR

3 ph 5 W

1 ph 2 W
2 ph 3 W
Sl.No
Existin
Villages Total Name & Location
g

CKT1

CKT2

CKT3

CKT1

CKT2

CKT3
1 F2 Hunagund Hunagund 1 Hunagund town 0.64 0.64 25 Asharay Calony 20.24 from DTc 6.16 4.39 0.1108 0.0957 0.0151

2 F2 Hunagund Hunagund 2 Hunagund town 2.10 2.10 100 APMC 51.25 from DTc 7.80 8.73 5.56 4.47 0.4032 0.3483 0.0550
110/33/11 KV MUSS Hunagund

3 F2 Hunagund Hunagund 3 Hunagund town 1.18 1.18 100 KEB 72.04 from DTc 7.60 7.37 5.42 5.25 0.4324 0.3735 0.0589

4 F2 Hunagund Hunagund 4 Hunagund town 0.41 0.41 100 Venkateshwar Talkies 61.42 from DTc 8.16 5.81 0.4169 0.3601 0.0568
Hunagund
Bagalkot

Bagalkot

5 F2 Hunagund Hunagund 5 Hunagund town 0.96 0.96 250 Mahiboob Talkies 144.01 from DTc 8.21 8.56 5.85 6.10 0.8769 0.7573 0.1195

6 F2 Hunagund Hunagund 6 Hunagund town 1.55 1.55 100 Melinapeth 77.55 from DTc 8.14 8.49 5.80 6.05 0.4359 0.3765 0.0594

7 F2 Hunagund Hunagund 7 Hunagund town 1.29 1.29 250 Bus Stand 134.02 from DTc 8.81 8.29 6.28 5.90 0.5651 0.4880 0.0770

8 F2 Hunagund Hunagund 8 Hunagund town 1.16 1.16 250 Karadi Naka 124.97 from DTc 8.53 8.72 6.08 6.22 0.6331 0.5468 0.0863

9 F2 Hunagund Hunagund 9 Hunagund town 1.33 1.33 100 Police Quarters 80.18 from DTc 6.72 8.61 4.79 6.14 0.4546 0.3927 0.0620

10 F2 Hunagund Hunagund 10 Hunagund town 1.02 1.02 100 Timmapur Road 63.11 from DTc 6.7 6.91 4.77 4.92 0.3998 0.3453 0.0545

Asst. Executive Engineer(El.)


O & M Sub -division, HESCOM,Ilkal

713349287.xls Page 25
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED

Reconductoring of LT lines in HUNAGUND TOWN in O&M Sub Division, HESCOM Ilkal.


Length of
Name of Name of
Name of the Name of the 3Ph,5W
Sl.No the the Sub- Name of the DTC
village/Town 11 KV feeder LT line existing in
Division Division
KM

1 Bagalkot Ilkal Hunagund town F2 Hunagund Asharay Calony 0.64

2 Bagalkot Ilkal Hunagund town F2 Hunagund APMC 2.10

3 Bagalkot Ilkal Hunagund town F2 Hunagund KEB 1.18

4 Bagalkot Ilkal Hunagund town F2 Hunagund Venkateshwar Talkies 0.41

5 Bagalkot Ilkal Hunagund town F2 Hunagund Mahiboob Talkies 0.96

6 Bagalkot Ilkal Hunagund town F2 Hunagund Melinapeth 1.55

7 Bagalkot Ilkal Hunagund town F2 Hunagund Bus Stand 1.29

8 Bagalkot Ilkal Hunagund town F2 Hunagund Karadi Naka 1.16

9 Bagalkot Ilkal Hunagund town F2 Hunagund Police Quarters 1.33

10 Bagalkot Ilkal Hunagund town F2 Hunagund Timmapur Road 1.02

Urban Total 11.63

Asst Executive Engineer (El).


O&M Sub-Division HESCOM Ilkal.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 250 KVA Huded Mahalaxmi Temple in Ilkal town in Ilkal Section, Ilkal Sub-Division.

CKT-1 CKT-2

KMs 0.08 0.08 0.09 0.085 0.09 0.095 0.08 0.06 0.07 0.08 0.09 0.09 0.08 0.07 KMs
250 KVA DTC

4.66 6.76 4.42 7.20 5.46 12.19 17.34 11.98 11.05 11.56 6.34 9.98 5.86 4.12
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 1180882.00


Distance in
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP Distance in Mtrs HP2 Mtr Total LT line length = 1130 Mtrs
1 4.66 80 1737.25 1 4.12 70 1188.21
2 11.42 80 10433.31 2 9.98 80 7968.03 Annual Energy loss -Existing Copper Conductor/4ACSR
3 15.84 90 22581.50 3 19.96 90 35856.14 611272 Unit/Annum
4 23.04 85 45121.54 4 26.30 85 58793.65 547244 Unit/Annum/ Km
5 28.50 90 73102.50 5 37.86 75 107503.47
6 40.69 95 157289.23 6 48.91 70 167453.17
7 58.03 80 269398.47 7 60.89 60 222455.53
Total 600 579663.80 Total 530 601218.20 Annual Energy loss -After 2 ACSR Conductor
29175 Unit/Annum
26119 Unit/Annum/ Km
% LT VR Calculation: Annual Energy Savings 582097 Unit/Annum
CKT-1 CKT-2
Before After Before After 0.00088637
9.24 6.58 8.82 6.28

Section Officer Asst. Executive Engineer(El.)


HESCOM, Ilkal O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 250 KVA Near TMC in Ilkal town in Ilkal Section, Ilkal Sub-Division.

CKT-1 CKT-2

KMs 0.09 0.08 0.12 0.08 0.09 250 KVA 0.03 0.07 0.09 0.03 0.05 0.08 0.07 0.08 0.06 KMs
DTC

7.15 19.32 4.98 8.65 9.56 20.32 15.56 10.11 9.32 2.11 9.22 5.41 1.23 3.98
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 1186000.90


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 1020 Mtrs
1 7.15 90 4601.03 1 3.98 60 950.42
2 26.47 80 56052.87 2 5.21 80 2171.53 Annual Energy loss -Existing Copper Conductor
3 31.45 120 118692.30 3 10.62 70 7894.91 67739 Unit/Annum
4 40.10 80 128640.80 4 19.84 80 31490.05 60643 Unit/Annum/ Km
5 49.66 90 221950.40 5 21.95 50 24090.13
Total 460 529937.40 6 31.27 30 29334.39
7 41.38 90 154107.40
8 56.94 70 226951.45 Annual Energy loss -After 2 ACSR Conductor
% LT VR Calculation: 9 77.26 30 179073.23 58506 Unit/Annum
CKT-1 CKT-2 Total 560 656063.50 52378 Unit/Annum/ Km
Before After Before After Annual Energy Savings 9233 Unit/Annum
8.34 5.94 8.83 6.29
2.6 1.9 Avg per Km For 1 KM Avg Annual Energy Savings
2850 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Amingad O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 250 KVA Near Syndicate Bank in Ilkal town in Ilkal Section, Ilkal Sub-Division.

CKT-1 CKT-2

KMs 0.08 0.08 0.15 0.04 0.04 250 KVA 0.04 0.05 0.09 0.08 0.09 KMs
DTC

10.10 16.63 14.32 15.30 15.20 20.12 15.26 28.52 12.50 9.30
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 1432383.54


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 740 Mtrs
1 10.10 80 8160.80 1 9.30 90 7784.10
2 26.73 80 57159.43 2 21.80 80 38019.20 Annual Energy loss -Existing Copper Conductor
3 41.05 150 252765.37 3 50.32 90 227889.22 81811 Unit/Annum
4 56.35 40 127012.90 4 65.58 50 215036.82 73242 Unit/Annum/ Km
5 71.55 40 204776.10 5 85.70 40 293779.60
Total 390 649874.61 Total 350 782508.94

Annual Energy loss -After 2 ACSR Conductor


% LT VR Calculation: 70660 Unit/Annum
CKT-1 CKT-2 63259 Unit/Annum/ Km
Before After Before After Annual Energy Savings 11151 Unit/Annum
8.34 5.94 8.11 5.78 8100
2.5 1.8 Avg per Km For 1 KM Avg Annual Energy Savings
3442 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Ilkal O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 250 KVA Gaddige Road in Ilkal town in Ilkal Section, Ilkal Sub-Division.

CKT-1 CKT-2

KMs 0.08 0.09 0.05 0.09 0.05 0.04 250 KVA 0.06 0.04 0.08 0.15 0.10 0.15 KMs
DTC

6.23 8.41 15.32 18.28 14.82 15.26 20.74 10.54 25.22 10.42 9.66 9.30
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 1504685.11


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 940 Mtrs
1 6.23 80 3105.03 1 9.30 150 12973.50
2 14.64 90 19289.66 2 18.96 100 35948.16 Annual Energy loss -Existing Copper Conductor
3 29.96 50 44880.08 3 29.38 150 129477.66 85940 Unit/Annum
4 48.24 90 209438.78 4 54.60 80 238492.80 76939 Unit/Annum/ Km
5 63.06 50 198828.18 5 65.14 40 169728.78
6 78.32 40 245360.90 6 85.88 60 442522.46
Total 360 475541.74 Total 580 1029143.37
Annual Energy loss -After 2 ACSR Conductor
74227 Unit/Annum
% LT VR Calculation: 66452 Unit/Annum/ Km
CKT-1 CKT-2 Annual Energy Savings 11714 Unit/Annum
Before After Before After
8.18 5.83 8.61 6.13 For 1 KM Avg Annual Energy Savings
2.6 1.8 Avg per Km 3615 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Ilkal O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 250 KVA Badiger Saw mill in Ilkal town in Ilkal Section, Ilkal Sub-Division.
CKT-1 CKT-2

KMs 0.1 0.1 0.04 0.06 0.06 0.04 0.04 0.06 0.08 0.09 0.08 0.09 KMs
250 KVA DTC

15.10 9.30 10.06 10.42 20.30 15.23 10.80 20.40 25.30 5.25 9.86 5.22
0.20
HP 8.64 HP
0.18 9.12 Circuit-3
0.15 9.87 Sl.No HP Distance in Mtrs HP2 Mtr
0.12 20.55 1 29.26 150 128422.14
0.15 29.26 2 49.81 120 297724.33
KMs HP 3 59.68 150 534255.36
CKT-3 4 68.80 180 852019.20
5 77.44 200 1199390.72

Total 800 3011811.75

Circuit-1 Circuit-2 Total HP2Mtrs = 4409675.19


Distance Distance in
Sl.No HP
in Mtrs
HP2 Mtr Sl.No HP
Mtrs
HP2 Mtr Total LT line length = 1640 Mtrs
1 15.10 100 22801.00 1 5.22 90 2452.36
2 24.40 100 59536.00 2 15.08 80 18192.51 Annual Energy loss - 4 ACSR Conductor
3 34.46 40 47499.66 3 20.33 90 37197.80 251859 Unit/Annum
4 44.88 60 120852.86 4 45.63 80 166567.75 225478 Unit/Annum/ Km
5 65.18 60 254905.94 5 66.03 60 261597.65
6 65.22 40 170145.94 6 76.83 40 236113.96
Total 400 675741.41 Total 440 722122.03
Annual Energy loss -After 2 ACSR Conductor
217531 Unit/Annum
% LT VR Calculation: 194746 Unit/Annum/ Km
CKT-1 CKT-2 CKT-3 Annual Energy Savings 34328 Unit/Annum
Before After Before After Before After
8.53 6.08 8.33 5.93 6.87 4.89 For 1 KM Avg Annual Energy Savings
2.4 2.6 Avg per Km 10595 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Ilkal O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 250 KVA Sewarage Pump in Ilkal town in Ilkal Section, Ilkal Sub-Division.

CKT-1 CKT-2

KMs 0.09 0.08 0.08 0.06 0.08 0.09 250 KVA 0.06 0.08 0.12 0.10 0.09 0.08 KMs
DTC

5.12 10.30 18.45 21.30 9.65 8.50 26.12 19.17 13.53 17.32 9.36 2.30
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 2196113.35


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 1010 Mtrs
1 5.12 90 2359.30 1 2.30 80 423.20
2 15.42 80 19022.11 2 11.66 90 12236.00 Annual Energy loss -Existing Copper Conductor
3 33.87 80 91774.15 3 28.98 100 83984.04 125431 Unit/Annum
4 55.17 60 182623.73 4 42.51 120 216852.01 112293 Unit/Annum/ Km
5 64.82 80 336130.59 5 61.68 80 304353.79
6 73.32 90 483824.02 6 87.80 60 462530.40
Total 480 1115733.90 Total 530 1080379.45
Annual Energy loss -After 2 ACSR Conductor
108335 Unit/Annum
% LT VR Calculation: 96988 Unit/Annum/ Km
CKT-1 CKT-2 Annual Energy Savings 17096 Unit/Annum
Before After Before After
8.40 5.98 8.31 5.92 12.167 For 1 KM Avg Annual Energy Savings
2.6 1.8 Avg per Km 5277 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Ilkal O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 100 KVA Joshi Galli in Ilkal town in Ilkal Section, Ilkal Sub-Division.

CKT-1 CKT-2
0.04 0.06 0.06 0.08 0.06 0.04 0.04 0.08 100 0.15 0.12 0.10 0.11 0.12 0.10
KMs KVA KMs
DTC
4.98 3.21 8.98 4.80 4.60 5.20 4.70 4.23 6.52 7.63 6.21 4.53 9.25 8.32
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 933039.74


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 1160 Mtrs
1 4.98 40 992.02 1 8.32 100 6922.24
2 8.19 60 4024.57 2 17.57 120 37044.59 Annual Energy loss -Existing 4 ACSR Conductor
3 17.17 60 17688.53 3 22.10 110 53725.10 53291 Unit/Annum
4 21.97 80 38614.47 4 28.31 100 80145.61 47709 Unit/Annum/ Km
5 26.57 60 42357.89 5 35.94 120 155002.03
6 31.77 40 40373.32 6 42.46 150 270427.74
7 36.47 40 53202.44 Total 700 603267.31
8 40.70 80 132519.20 Annual Energy loss -After 2 ACSR Conductor
Total 460 329772.43 46027 Unit/Annum
41206 Unit/Annum/ Km
Annual Energy Savings 7263 Unit/Annum
% LT VR Calculation:
CKT-1 CKT-2 For 1 KM Avg Annual Energy Savings
Before After Before After 2242 Unit/Annum
6.49 4.62 7.34 5.23
2.1 1.5 Avg per Km

Section Officer Asst. Executive Engineer(El.)


HESCOM, Ilkal O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 100 KVA Goudar Garrage in Ilkal town in Ilkal Section, Ilkal Sub-Division.

CKT-1
100 0.12 0.02 0.03 0.02 0.02 0.02 0.02 KMs
KVA
DTC
10.20 20.24 18.80 7.63 2.12 1.65 10.90
HP

Circuit-1 Total HP2Mtrs = 757374.58


Distance
Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 245 Mtrs
1 10.90 20 2376.20
2 12.55 20 3150.05 Annual Energy loss -Existing 4 ACSR Conductor
3 14.67 20 4304.18 43258 Unit/Annum
4 22.30 15 7459.35 38727 Unit/Annum/ Km
5 41.10 30 50676.30
6 61.34 20 75251.91
7 71.54 120 614156.59
Total 245 757374.58 Annual Energy loss -After 2 ACSR Conductor
37362 Unit/Annum
33448 Unit/Annum/ Km
Annual Energy Savings 5896 Unit/Annum
% LT VR Calculation:
CKT-1 For 1 KM Avg Annual Energy Savings
Before After 1820 Unit/Annum
Before After 7.12 5.08
2.2 1.6 Avg per Km

Section Officer Asst. Executive Engineer(El.)


HESCOM, Ilkal O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 63 KVA APMC in Ilkal town in Ilkal Section, Ilkal Sub-Division.

CKT-1
100 0.12 0.05 0.08 0.02 0.06 0.06 0.02 KMs
KVA
DTC
10.30 8.11 5.32 12.12 9.80 5.98 3.60
HP

Circuit-1 Total HP2Mtrs = 616801.87


Distance
Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 405 Mtrs
1 3.60 20 259.20
2 9.58 60 5506.58 Annual Energy loss -Existing 4 ACSR Conductor
3 19.38 60 22535.06 35229 Unit/Annum
4 31.50 20 19845.00 31539 Unit/Annum/ Km
5 36.82 75 101678.43
6 44.93 50 100935.25
7 55.23 120 366042.35
Total 405 616801.87 Annual Energy loss -After 2 ACSR Conductor
30427 Unit/Annum
27240 Unit/Annum/ Km
Annual Energy Savings 4802 Unit/Annum
% LT VR Calculation:
CKT-1 For 1 KM Avg Annual Energy Savings
Before After 1482 Unit/Annum
8.26 5.88
2.5 1.8 Avg per Km

Section Officer Asst. Executive Engineer(El.)


HESCOM, Ilkal O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 100 KVA Govt. Hospital in Ilkal town in Ilkal Section, Ilkal Sub-Division.

CKT-1 CKT-2

KMs 0.09 0.08 0.07 0.08 0.09 0.12 100 KVA 0.13 0.12 0.07 0.12 0.08 0.10 KMs
DTC

5.45 7.32 2.10 4.36 9.65 5.20 10.20 14.20 4.63 1.98 2.35 4.30
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 576713.12


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 1150 Mtrs
1 5.45 90 2673.23 1 4.30 100 1849.00
2 12.77 80 13045.83 2 6.65 80 3537.80 Annual Energy loss -Existing 4 ACSR Conductor
3 14.87 70 15478.18 3 8.63 120 8937.23 32939 Unit/Annum
4 19.23 80 29583.43 4 13.26 70 12307.93 29489 Unit/Annum/ Km
5 28.88 90 75064.90 5 27.46 120 90486.19
6 34.08 120 139373.57 6 37.66 130 184375.83
Total 530 275219.14 Total 620 301493.98
Annual Energy loss -After 2 ACSR Conductor
28450 Unit/Annum
% LT VR Calculation: 25470 Unit/Annum/ Km
CKT-1 CKT-2 Annual Energy Savings 4490 Unit/Annum
Before After Before After
6.32 4.51 6.52 4.65 For 1 KM Avg Annual Energy Savings
2.0 1.4 Avg per Km 1386 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Ilkal O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 100 KVA Maruti Temple in Ilkal town in Ilkal Section, Ilkal Sub-Division.

CKT-1 CKT-2
0.15 0.08 0.085 0.155 100 0.04 0.04 0.12 0.04 0.08 0.06
KMs KVA KMs
DTC
12.15 11.98 1.05 4.25 2.40 4.15 14.25 5.28 4.65 12.15 10.23
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 619935.25


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 835 Mtrs
1 12.15 150 22143.38 1 10.23 60 6279.17
2 24.13 80 46580.55 2 22.38 80 40069.15 Annual Energy loss -Existing 4 ACSR Conductor
3 25.18 85 53892.75 3 27.03 35 25571.73 35408 Unit/Annum
4 29.43 155 134249.36 4 32.31 120 125272.33 31699 Unit/Annum/ Km
Total 470 256866.04 5 46.56 35 75874.18
6 50.71 35 90002.64
Total 365 363069.21
% LT VR Calculation: Annual Energy loss -After 2 ACSR Conductor
CKT-1 CKT-2 30582 Unit/Annum
Before After Before After 27378 Unit/Annum/ Km
6.13 4.37 6.24 4.44 Annual Energy Savings 4826 Unit/Annum
1.9 1.4 Avg per Km
For 1 KM Avg Annual Energy Savings
1490 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Ilkal O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 250 KVA Near Darga in Ilkal town in Ilkal Section, Ilkal Sub-Division.

CKT-1 CKT-2

KMs 0.08 0.12 0.08 0.12 0.15 0.06 250 KVA 0.03 0.05 0.06 0.05 0.06 0.08 0.09 KMs
DTC

5.10 9.12 4.98 4.63 9.45 15.36 14.39 18.74 19.64 17.52 17.36 5.12 2.31
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 1390360.25


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 1030 Mtrs
1 5.10 80 2080.80 1 2.31 90 480.25
2 14.22 120 24265.01 2 7.43 80 4416.39 Annual Energy loss -Existing 4 ACSR Conductor
3 19.20 80 29491.20 3 24.79 60 36872.65 79411 Unit/Annum
4 23.83 120 68144.27 4 42.31 50 89506.81 71093 Unit/Annum/ Km
5 33.28 150 166133.76 5 61.95 60 230268.15
6 48.64 60 141950.98 6 80.69 50 325543.81
Total 610 432066.01 7 95.08 30 271206.19
Total 420 958294.24 Annual Energy loss -After 2 ACSR Conductor
68587 Unit/Annum
% LT VR Calculation: 61403 Unit/Annum/ Km
CKT-1 CKT-2 Annual Energy Savings 10824 Unit/Annum
Before After Before After
8.46 6.03 8.81 6.27 For 1 KM Avg Annual Energy Savings
2.7 1.9 Avg per Km 3341 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Ilkal O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY
Energy loss & LTVR Calculation for 63 KVA Ganga Kshetra in Ilkal town in Ilkal Section, Ilkal Sub-Divisio

CKT-1

KMs 0.12 0.12 0.06 63 KVA


DTC

5.00 5.00 45.00 10.00


HP

Circuit-1 Circuit-2
Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr

1 5.00 120 3000.00 1 0.00 0 0.00


2 10.00 120 12000.00 2 0.00 0 0.00
3 55.00 60 181500.00 3 0.00 0 0.00
4 65.00 ### #VALUE! 4 0.00 0 0.00
Total ### #VALUE! 5 0.00 0 0.00
6 0.00 0 0.00
7 0.00 0 0.00
% LT VR Calculation: 8 0.00 0 0.00
CKT-1 CKT-2 Total 0 0.00
Before After Before After
### ### 0.00 0.00
### ### Avg per Km

Section Officer Asst. Executive Engineer(E


HESCOM, Ilkal O & M Sub -division, HESCOM
UPPLY COMPANY LIMITED
al Section, Ilkal Sub-Division.

CKT-2

KMs

HP

Total HP2Mtrs = #VALUE!

Total LT line length = #VALUE! Mtrs

Annual Energy loss -Existing 4 ACSR Conductor


#VALUE! Unit/Annum
#VALUE! Unit/Annum/ Km

Annual Energy loss -After 2 ACSR Conductor


#VALUE! Unit/Annum
#VALUE! Unit/Annum/ Km
Annual Energy Savings #VALUE! Unit/Annum

For 1 KM Avg Annual Energy Savings


#VALUE! Unit/Annum

Asst. Executive Engineer(El.)


M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 63 KVA Ganga Kshetra in Ilkal town in Ilkal Section, Ilkal Sub-Division.

CKT-1 CKT-2

KMs 0.04 0.12 0.13 0.14 63 KVA 0.12 0.06 0.08 0.10 0.04 0.06 0.06 0.04 KMs
DTC

5.14 3.12 2.65 5.54 5.44 4.25 4.66 2.32 3.30 6.22 4.52 4.23
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 240324.14


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 870 Mtrs
1 5.14 40 1056.78 1 4.23 40 715.72
2 8.26 120 8187.31 2 8.75 60 4593.75 Annual Energy loss -Existing 4 ACSR Conductor
3 10.91 130 15473.65 3 14.97 60 13446.05 13726 Unit/Annum
4 16.45 140 37884.35 4 18.27 40 13351.72 12288 Unit/Annum/ Km
Total 430 62602.10 5 20.59 100 42394.81
6 25.25 80 51005.00
7 29.50 60 52215.00
% LT VR Calculation: 8 34.94 120 146496.43 Annual Energy loss -After 2 ACSR Conductor
CKT-1 CKT-2 Total 440 177722.05 11855 Unit/Annum
Before After Before After 10614 Unit/Annum/ Km
2.89 2.06 7.25 5.17 Annual Energy Savings 1871 Unit/Annum
1.6 1.1 Avg per Km
For 1 KM Avg Annual Energy Savings
577 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Ilkal O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 25 KVA Gonal Road Gaddige TC in Ilkal town in Ilkal Section, Ilkal Sub-Division.

CKT-1

25 KVA 0.14 0.10 0.06 0.08 0.04 0.08 KMs


DTC

5.11 2.12 1.98 0.98 9.98 2.20


HP

Circuit-1 Total HP2Mtrs = 133778.45


Distance
Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 500 Mtrs
1 2.20 80 387.20
2 12.18 40 5934.10 Annual Energy loss -Existing 4 ACSR Conductor
3 13.16 80 13854.85 7641 Unit/Annum
4 15.14 60 13753.18 6840 Unit/Annum/ Km
5 17.26 100 29790.76
6 22.37 140 70058.37
Total 500 133778.45
Annual Energy loss -After 2 ACSR Conductor
6599 Unit/Annum
5908 Unit/Annum/ Km
Annual Energy Savings 1041 Unit/Annum
% LT VR Calculation:
CKT-1 For 1 KM Avg Annual Energy Savings
Before After 321 Unit/Annum
4.39 3.13
1.4 1.0 Avg per Km

Section Officer Asst. Executive Engineer(El.)


HESCOM, Ilkal O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 25 KVA Asharaya coloany TC in Hunagund town in Hunagund Section, Ilkal Sub-Division.

CKT-1

25 KVA 0.14 0.12 0.08 0.08 0.14 0.08 KMs


DTC

1.90 2.34 4.22 3.61 4.58 6.42


HP

Circuit-1 Total HP2Mtrs = 193970.75


Distance
Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 640 Mtrs
1 6.42 80 3297.31
2 11.00 140 16940.00 Annual Energy loss -Existing 4 ACSR Conductor
3 14.61 80 17076.17 11079 Unit/Annum
4 18.83 80 28365.51 9918 Unit/Annum/ Km
5 21.17 120 53780.27
6 23.07 140 74511.49
Total 640 193970.75
Annual Energy loss -After 2 ACSR Conductor
9569 Unit/Annum
8566 Unit/Annum/ Km
Annual Energy Savings 1510 Unit/Annum
% LT VR Calculation:
CKT-1 For 1 KM Avg Annual Energy Savings
Before After 466 Unit/Annum
6.16 4.39
1.9 1.4 Avg per Km

Section Officer Asst. Executive Engineer(El.)


HESCOM, Hunagund O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 100 KVA APMC T.C. in Hunagund town in Hunagund Section, Ilkal Sub-Division.

CKT-1 CKT-2
0.45 0.39 0.47 100 0.25 0.28 0.26
KMs KVA KMs
DTC
6.97 15.54 20.85 6.21 14.49 21.43
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 705949.55


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 2095 Mtrs
1 0.00 450 0.00 1 0.00 260 0.00
2 6.97 390 18946.55 2 21.43 275 126292.35 Annual Energy loss -Existing 4 ACSR Conductor
3 22.51 470 238149.05 3 35.92 250 322561.60 40320 Unit/Annum
Total 1310 257095.60 Total 785 448853.95 36097 Unit/Annum/ Km

% LT VR Calculation:
CKT-1 CKT-2 Annual Energy loss -After 2 ACSR Conductor
Before After Before After 34825 Unit/Annum
7.80 5.56 8.73 6.22 31177 Unit/Annum/ Km
2.6 1.8 Avg per Km Annual Energy Savings 5496 Unit/Annum

For 1 KM Avg Annual Energy Savings


1696 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Hunagund O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 100 KVA KEB TC Chitavadagi road Hunagund town in Hunagund Section, Ilkal Sub-Division.

CKT-1 CKT-2
0.21 0.13 0.19 0.07 100 0.06 0.06 0.07 0.06 0.21 0.13
KMs KVA KMs
DTC
5.14 9.45 23.19 2.34 7.21 4.13 5.10 9.84 6.49 9.23
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 757040.58


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 1180 Mtrs
1 5.14 210 5548.12 1 9.23 125 10649.11
2 14.59 130 27672.85 2 15.72 210 51894.86 Annual Energy loss -Existing 4 ACSR Conductor
3 37.78 190 271192.40 3 25.56 60 39198.82 43239 Unit/Annum
4 40.12 70 112673.01 4 30.66 70 65802.49 38710 Unit/Annum/ Km
Total 600 417086.37 5 34.79 55 66568.93
6 42.00 60 105840.00
Total 580 339954.21
% LT VR Calculation: Annual Energy loss -After 2 ACSR Conductor
CKT-1 CKT-2 37345 Unit/Annum
Before After Before After 33433 Unit/Annum/ Km
7.60 5.42 7.37 5.25 Annual Energy Savings 5893 Unit/Annum
2.3 1.6 Avg per Km
For 1 KM Avg Annual Energy Savings
1819 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Hunagund O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 100 KVA at Venkateshaswar talkies in Hunagund town in Hunagund Section, Ilkal Sub-Division.

CKT-1
100 0.06 0.09 0.06 0.08 0.04 0.08 KMs
KVA
DTC
9.21 25.75 19.24 1.48 10.78 3.56
HP

Circuit-1 Total HP2Mtrs = 729988.39


Distance
Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 410 Mtrs
1 3.56 80 1013.89
2 14.34 40 8225.42 Annual Energy loss -Existing 4 ACSR Conductor
3 15.82 80 20021.79 41693 Unit/Annum
4 35.06 60 73752.22 37326 Unit/Annum/ Km
5 60.81 90 332807.05
6 70.02 60 294168.02
Total 410 729988.39
Annual Energy loss -After 2 ACSR Conductor
36011 Unit/Annum
32239 Unit/Annum/ Km
Annual Energy Savings 5683 Unit/Annum
% LT VR Calculation:
CKT-1 For 1 KM Avg Annual Energy Savings
Before After 1754 Unit/Annum
8.16 5.81
2.5 1.8 Avg per Km

Section Officer Asst. Executive Engineer(El.)


HESCOM, Hunagund O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 250 KVA Mahiboob Talkies in Hunagund town in Hunagund Section, Ilkal Sub-Division.

CKT-1 CKT-2

KMs 0.18 0.06 0.08 0.1 0.06 0.06 250 KVA 0.03 0.05 0.06 0.05 0.06 0.08 0.09 KMs
DTC

4.98 9.36 6.49 13.98 13.34 21.94 14.39 18.74 19.64 17.52 17.36 5.12 1.31
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 1535244.81


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 960 Mtrs
1 4.98 180 4464.07 1 1.31 90 154.45
2 14.34 60 12338.14 2 6.43 80 3307.59 Annual Energy loss -Existing 4 ACSR Conductor
3 20.83 80 34711.11 3 23.79 60 33957.85 87686 Unit/Annum
4 34.81 100 121173.61 4 41.31 50 85325.81 78501 Unit/Annum/ Km
5 48.15 60 139105.35 5 60.95 60 222894.15
6 70.09 60 294756.49 6 79.69 50 317524.81
Total 540 606548.77 7 94.08 30 265531.39
Total 420 928696.04 Annual Energy loss -After 2 ACSR Conductor
75734 Unit/Annum
% LT VR Calculation: 67802 Unit/Annum/ Km
CKT-1 CKT-2 Annual Energy Savings 11951 Unit/Annum
Before After Before After
8.21 5.85 8.56 6.10 For 1 KM Avg Annual Energy Savings
2.6 1.8 Avg per Km 3689 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Hunagund O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 100 KVA Melinapeth in Hunagund town in Hunagund Section, Ilkal Sub-Division.

CKT-1 CKT-2
0.15 0.22 0.19 0.11 100 0.03 0.09 0.18 0.20 0.18 0.20
KMs KVA KMs
DTC
12.10 8.80 2.30 4.50 12.30 24.50 12.60 5.31 2.80 3.20
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 763230.93


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 1550 Mtrs
1 12.10 150 21961.50 1 3.20 200 2048.00
2 20.90 220 96098.20 2 6.00 180 6480.00 Annual Energy loss -Existing 4 ACSR Conductor
3 23.20 190 102265.60 3 11.31 200 25583.22 43592 Unit/Annum
4 27.70 110 84401.90 4 23.91 180 102903.86 39026 Unit/Annum/ Km
Total 670 304727.20 5 48.41 90 210917.53
6 60.71 30 110571.12
Total 880 458503.73
% LT VR Calculation: Annual Energy loss -After 2 ACSR Conductor
CKT-1 CKT-2 37651 Unit/Annum
Before After Before After 33707 Unit/Annum/ Km
8.14 5.80 8.49 6.05 Annual Energy Savings 5942 Unit/Annum
2.6 1.8 Avg per Km
For 1 KM Avg Annual Energy Savings
1834 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Hunagund O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 250 KVA Bus stand TC in Hunagund town in Hunagund Section, Ilkal Sub-Division.

CKT-1 CKT-2

KMs 0.1 0.08 0.11 0.12 0.08 0.04 0.07 0.08 0.08 0.07 0.08 0.18 0.08 0.20 KMs
250 KVA DTC

2.50 8.32 3.56 7.98 6.54 18.60 30.10 24.30 32.10 6.80 5.50 1.40 4.10 0.98
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 989328.56


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 1290 Mtrs
1 2.50 100 625.00 1 0.98 200 192.08
2 10.82 80 9365.79 2 5.08 80 2064.51 Annual Energy loss -Existing 4 ACSR Conductor
3 14.38 110 22746.28 3 6.48 180 7558.27 56506 Unit/Annum
4 22.36 120 59996.35 4 11.98 80 11481.63 50587 Unit/Annum/ Km
5 28.90 40 33408.40 5 18.78 70 24688.19
6 47.50 70 157937.50 6 50.88 80 207101.95
7 77.60 70 421523.20 7 75.18 80 452162.59
Total 520 284079.33 Total 770 705249.23 Annual Energy loss -After 2 ACSR Conductor
48804 Unit/Annum
43692 Unit/Annum/ Km
% LT VR Calculation: Annual Energy Savings 7702 Unit/Annum
CKT-1 CKT-2
Before After Before After For 1 KM Avg Annual Energy Savings
8.81 6.28 8.29 5.90 2377 Unit/Annum
2.6 1.9 Avg per Km

Section Officer Asst. Executive Engineer(El.)


HESCOM, Hunagund O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 250 KVA Karadi Naka TC in Hunagund town in Hunagund Section, Ilkal Sub-Division.

CKT-1 CKT-2

KMs 0.12 0.06 0.08 0.12 0.06 0.1 0.03 0.03 0.10 0.12 0.10 0.24 0.03 KMs
250 KVA DTC

3.10 2.21 4.65 16.51 9.20 19.50 18.90 14.20 17.20 21.30 10.20 3.20 2.30
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 1108466.61


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 1160 Mtrs
1 3.10 120 1153.20 1 2.30 30 158.70
2 5.31 60 1691.77 2 5.50 240 7260.00 Annual Energy loss -Existing 4 ACSR Conductor
3 9.96 80 7936.13 3 15.70 100 24649.00 63310 Unit/Annum
4 26.47 120 84079.31 4 37.00 120 164280.00 56679 Unit/Annum/ Km
5 35.67 100 127234.89 5 54.20 100 293764.00
6 55.17 30 91311.87 6 68.40 30 140356.80
7 74.07 30 164590.95 Total 620 630468.50
Total 540 477998.11 Annual Energy loss -After 2 ACSR Conductor
54681 Unit/Annum
48954 Unit/Annum/ Km
% LT VR Calculation: Annual Energy Savings 8629 Unit/Annum
CKT-1 CKT-2
Before After Before After For 1 KM Avg Annual Energy Savings
8.53 6.08 8.72 6.22 2663 Unit/Annum
2.7 1.9 Avg per Km

Section Officer Asst. Executive Engineer(El.)


HESCOM, Hunagund O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 100 KVA Police Quarters TC in Hunagund town in Hunagund Section, Ilkal Sub-Division.

CKT-1 CKT-2
0.25 0.13 0.15 100 0.04 0.10 0.08 0.15 0.29 0.14
KMs KVA KMs
DTC
14.20 12.30 3.25 14.32 13.21 20.66 4.12 9.02 0.32
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 795951.55


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 1328 Mtrs
1 14.20 250 50410.00 1 0.32 140 14.34
2 26.50 130 91292.50 2 9.34 288 25123.85 Annual Energy loss -Existing 4 ACSR Conductor
3 29.75 150 132759.38 3 13.46 150 27175.74 45461 Unit/Annum
Total 530 274461.88 4 34.12 80 93133.95 40699 Unit/Annum/ Km
5 47.33 100 224012.89
6 61.65 40 152028.90
% LT VR Calculation: Total 798 521489.67
CKT-1 CKT-2 Annual Energy loss -After 2 ACSR Conductor
Before After Before After 39265 Unit/Annum
6.72 4.79 8.61 6.14 35152 Unit/Annum/ Km
2.4 1.7 Avg per Km Annual Energy Savings 6196 Unit/Annum

For 1 KM Avg Annual Energy Savings


1912 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Hunagund O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 63 KVA Timmapur Road TC in Hunagund town in Hunagund Section, Ilkal Sub-Division.

CKT-1 CKT-2
0.1 0.12 0.19 100 0.18 0.12 0.08 0.10 0.08 0.05
KMs KVA KMs ````````````
DTC
14.06 12.30 9.69 6.35 18.96 4.65 2.65 1.98 1.30
HP HP

Circuit-1 Circuit-2 Total HP2Mtrs = 700061.33


Distance in Distance
Sl.No HP
Mtrs
HP2 Mtr Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 1020 Mtrs
1 14.06 100 19768.36 1 1.30 50 84.50
2 26.36 120 83381.95 2 3.28 80 860.67 Annual Energy loss -Existing 4 ACSR Conductor
3 36.05 190 246924.47 3 5.93 100 3516.49 39984 Unit/Annum
Total 410 350074.79 4 10.58 80 8954.91 35796 Unit/Annum/ Km
5 29.54 120 104713.39
6 35.89 180 231856.58
% LT VR Calculation: Total 610 349986.54
CKT-1 CKT-2 Annual Energy loss -After 2 ACSR Conductor
Before After Before After 34534 Unit/Annum
6.70 4.77 6.91 4.92 30917 Unit/Annum/ Km
2.1 1.5 Avg per Km Annual Energy Savings 5450 Unit/Annum

For 1 KM Avg Annual Energy Savings


1682 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Hunagund O & M Sub -division, HESCOM,Ilkal
`````````````````
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 100 KVA NANDAWADAGI VILLAGE DTC in NANDAWADAGI Section, Ilkal Sub-Division.

CKT-2
100 0.06 0.12 0.12 0.12 0.33
KVA KMs
DTC
25.00 10.00 10.00 10.00 0.50
HP

Circuit-2 Total HP2Mtrs = 360187.50


Distance
Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 750 Mtrs
1 0.00 0 0.00
2 0.50 330 82.50 Annual Energy loss -Existing 4 ACSR Conductor
3 10.50 120 13230.00 20572 Unit/Annum
4 20.50 120 50430.00 18417 Unit/Annum/ Km
5 30.50 120 111630.00
6 55.50 60 184815.00
Total 750 360187.50
% LT VR Calculation: Annual Energy loss -After 2 ACSR Conductor
CKT-1 CKT-2 17768 Unit/Annum
Before After Before After 15907 Unit/Annum/ Km
0.00 0.00 6.38 4.55 Annual Energy Savings 2804 Unit/Annum
1.0 0.7 Avg per Km
For 1 KM Avg Annual Energy Savings
865 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Nandawadagi O & M Sub -division, HESCOM,Ilkal
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Energy loss & LTVR Calculation for 100 KVA KODIHAL VILLAGE DTC in NANDAWADAGI Section, Ilkal Sub-Division.

CKT-2
100 0.05 0.16 0.06 0.17 0.06 0.17
KVA KMs
DTC
5.00 5.00 5.00 10.00 10.00 5.00
HP

Circuit-2 Total HP2Mtrs = 454000.00


Distance
Sl.No HP
in Mtrs
HP2 Mtr
Total LT line length = 670 Mtrs
1 5.00 170 4250.00
2 15.00 60 13500.00 Annual Energy loss -Existing 4 ACSR Conductor
3 25.00 170 106250.00 25930 Unit/Annum
4 30.00 60 54000.00 23214 Unit/Annum/ Km
5 35.00 160 196000.00
6 40.00 50 80000.00
Total 670 454000.00
% LT VR Calculation: Annual Energy loss -After 2 ACSR Conductor
CKT-1 CKT-2 22396 Unit/Annum
Before After Before After 20050 Unit/Annum/ Km
0.00 0.00 9.03 6.44 Annual Energy Savings 3534 Unit/Annum
1.4 1.0 Avg per Km
For 1 KM Avg Annual Energy Savings
1091 Unit/Annum

Section Officer Asst. Executive Engineer(El.)


HESCOM, Nandawadagi O & M Sub -division, HESCOM,Ilkal

You might also like