0% found this document useful (0 votes)
923 views

Checklist For Pre Concreting Excel Sheet

This document provides a checklist for concreting a structure slab for the third floor of Pristine Heights in BJB Nagar on December 17, 2023. The checklist includes 12 items to check before concreting, such as surface preparation, formwork, conduits, vibrators, reinforcement, embedded parts, plumb, and reduced levels. The quality assurance engineer signs off after inspection and any remarks are noted.

Uploaded by

parkuprakash1048
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
923 views

Checklist For Pre Concreting Excel Sheet

This document provides a checklist for concreting a structure slab for the third floor of Pristine Heights in BJB Nagar on December 17, 2023. The checklist includes 12 items to check before concreting, such as surface preparation, formwork, conduits, vibrators, reinforcement, embedded parts, plumb, and reduced levels. The quality assurance engineer signs off after inspection and any remarks are noted.

Uploaded by

parkuprakash1048
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Checklist for Concreting

Project : Pristine Heights Doc. No. : QA/CL-CON/


Client : CSS SJ Homes contractor :

SITE: LOCATION: DATE:


BJB Nagar BJB NAGAR 12/17/2023

Structure: SLAB-3rd Max Aggre Size: Slump:

Cement Test Cert No: Steel Test Cert No:


YES NO NA
PRE CONCRETING

1 Check surface preparation

2 Check for Form work and stagging (RFI To be Approved)

3 Conduits/ Ducts opening/ Insert Plates provided?

4 Check for provision of vibrators?

5 Working condition of mixer/ vibrators checked and gaps between plates


in mixer drum to be checked?

6 Access platform and walkways (if required) provided?

7 Check reinforcement as per drawings (RFI- To be Approved)

8 Check Embedded parts (if Required)

9 Check cover to Reinforcement

10 Check Plumb

11 Check Reduced levels

12 Check for Concrete (Pour card)

Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments

Checked By:

Approved By: