0% found this document useful (0 votes)
1K views

Request For Transformer

The Landlord Association of Unwan Street II in Kpansia 2, Bayelsa State is requesting that the Niger Delta Development Commission supply a transformer to their locality. The association represents about 100 households that have been without electricity for 4 years since the only transformer from PHCN is broken beyond repair. Providing a new transformer would help develop the standard of living for the people in the community and alleviate their suffering without power. The association appeals to the NDDC to consider their request.

Uploaded by

Ayaokpo Zibabo
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

Request For Transformer

The Landlord Association of Unwan Street II in Kpansia 2, Bayelsa State is requesting that the Niger Delta Development Commission supply a transformer to their locality. The association represents about 100 households that have been without electricity for 4 years since the only transformer from PHCN is broken beyond repair. Providing a new transformer would help develop the standard of living for the people in the community and alleviate their suffering without power. The association appeals to the NDDC to consider their request.

Uploaded by

Ayaokpo Zibabo
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

THE LANDLORD ASSOCIATION OF UNWAN STREET II

KPANSIA 2

The Landlord Association of Unwan Street ll,


Kpansia 2,
Opolo/Elebele Road,
Yenagoa,
Bayelsa State,
16th January 2019.

The Director,
NDDC Office,
Yenagoa,
Bayelsa State.

Sir,
REQUEST FOR THE SUPPLY OF TRANSFORMER
We the residence of Unwan Street ll in kpansia ll, wish to apply to the Niger Delta
Development Commission through your good office for the supply of a
transformer in our locality.
This passionate appeal became necessary due to your commission desire and
commitment to the development and transforming the living standard of the
people of the Niger Delta region, through your infrastructural development
studies and provision of basic amenities.
Sir, it may interest you to know that the residence of Kpansia 2, numbering about
100 household have lived without electricity supply for the past four ( 4 ) years,
this was due to the fact that the only transformer from PHCN is bad and no hope
of replacement. Several efforts made by concerned members to effect repairs,
could not yield the desired result as the transformer had gone beyond repair.
It is on the above premise that we appeal for your kind support to provide for us a
transformer in other to alleviate the suffering of the people.
We will be very gratefully if this application is given its due consideration.
Thanks and remain bless.

DEACON TELU THANKGOD PST. CLETUS OGWU


Chairman Acting light committee chairman
08037958555 08138057586

You might also like