This daily report from PT Samtra Tridaya provides information for a 30MW coal-fired power plant project in Bangka Belitung, Indonesia. No work was performed on the day of the report, as there were no direct workers on site. The report includes sections on manpower, work items, materials delivered and safety records for the day.

Uploaded by

oktavia pribowo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
143 views

Form Daily Report

This daily report from PT Samtra Tridaya provides information for a 30MW coal-fired power plant project in Bangka Belitung, Indonesia. No work was performed on the day of the report, as there were no direct workers on site. The report includes sections on manpower, work items, materials delivered and safety records for the day.

Uploaded by

oktavia pribowo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

DAILY REPORT

PT SAMTRA TRIDAYA
Project Name : PLTU 3 BANGKA BELITUNG 2 X 30 MW COAL FIRED STEAM POWER PLANT PROJECT Report Number :
Date :
Location : BANGKA - BELITUNG Day :
Man Power Work Item this Day Material Delivered
Skill Total Description Volume Description Volume
Indirect Man Power
Project Manager
Site Manager
Site Engineer
Drafter
Admins.
Logistic
Total

Direct Man Power


Supervisor
Surveyor
Ass. Surveyor
Mechanic
Headman
Carpenter
Stonemason
Blacksmith
Worker
Operator
Total 0
Time Work :
Have to come out request this day Material / Instrument used for this day
Start :
Up to : Description Number Description Volume
Wheather Record : 1
2
Morning : 3
4
Afternoon : 5
6
Evening : 7
Safety Record : Notes : Approved by, Checked by, Prepared by,
PT. Manunggal Engineering PT. ………………………….. PT. Samtra Tridaya

……………………. ……………………. …………………….


Site Manager Site Coordinator Site Manager
WEEKLY REPORT
PT SAMTRA TRIDAYA
Project Name : PLTU 3 BANGKA BELITUNG 2 X 30 MW COAL FIRED STEAM POWER PLANT PROJECT

Location : BANGKA - BELITUNG Period : ………………………….


Man Power Work Item this Week Material Delivered
Skill Sun Mon Tue Wed Thr Fri Sat Total Description Volume Description Volume
Indirect Man Power
Project Manager
Site Manager 0
Site Engineer 0
Drafter 0
Admins. 0
Logistic 0
Total 0 0 0 0 0 0 0

Direct Man Power


Supervisor 0
Surveyor 0
Ass. Surveyor 0
Mechanic 0
Headman 0
Carpenter 0
Stonemason 0
Blacksmith 0
Worker 0
Operator 0
Total 0 0 0 0 0 0 0

Have to come out request this week Material / Instrument used for this week

Description Number Description Number Description Volume


1
2
3
4
5
6
7
Safety Record : Notes : Average Time Work Approved by, Checked by, Prepared by,
Start : PT. Manunggal Engineering PT. ………………………………. PT. Samtra Tridaya
Up to :

……………………. ……………………. …………………….


Site Manager Site Coordinator Site Manager