Feeder Protection M2 - BESS Side - Test Report

The document reports the results of testing and commissioning a feeder protection relay, including measurements of current transformers and voltage transformers, operation times of overcurrent and directional elements, and verification that all measurements and operation times were within specified acceptance criteria. The relay settings, test procedures, expected and measured results are documented for non-directional overcurrent, directional overcurrent, non-directional earth fault, and directional earth fault elements. All tests showed the relay operated as expected within allowed tolerances.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views

Feeder Protection M2 - BESS Side - Test Report

The document reports the results of testing and commissioning a feeder protection relay, including measurements of current transformers and voltage transformers, operation times of overcurrent and directional elements, and verification that all measurements and operation times were within specified acceptance criteria. The relay settings, test procedures, expected and measured results are documented for non-directional overcurrent, directional overcurrent, non-directional earth fault, and directional earth fault elements. All tests showed the relay operated as expected within allowed tolerances.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

TESTING & COMMISSIONING

FEEDER PROTECTION RELAY


TEST REPORT

F-PMS-CTC-48, Rev 0,08-Aug-2022

Company FORT PILAR ENERGY INC.


Plant/Substation BESS SANGALI S/S
Location Sangali, Zamboanga City, Zamboanga del Sur
Test Date December 09,2023

INSTRUMENT DATA
Make/Brand Omicron
Model No. CMC 356
Serial No. AN148E/102005943
Calibration Date September 21, 2023-2024

RELAY DATA
Relay Function 50/51P, 67G, 27/59, 81
Make Sifang
Model No. CSC - 211
Serial No. SFJB400006807022000004
Settings & Calculation J&S

RELAY SETTING
Line CT Pri 1200 Line PT Pri 69kV L-L
Line CT Sec 1 Line PT Sec 115V L-L

NOTE: See complete final Relay Setting on a separate sheet.

TEST DATA
1.1 CT MEASUREMENTS (Metering Secondary Injection)
Phase Current Injected (A) Expected Value (A) Measured Value (A) REMARKS

PHASE A 0.1 0.1 0.099 OK


PHASE B 0.2 0.2 0.199 OK
PHASE C 0.3 0.3 0.3 OK
Acceptance Criteria: ≤ ±2.5% setting

1.2 VT MEASUREMENTS (Metering Secondary Injection)


Phase Voltage Injected Expected Value Measured Value REMARKS

PHASE A 10 10 10.009 OK
PHASE B 20 20 20.022 OK
PHASE C 30 30 30.027 OK
Acceptance Criteria: ≤ ±2.5% setting

2.1 NON-DIRECTIONAL OVERCURRENT (50P) Stage 1: I_Set = 0.94A , t_Op = 0


Measured Time (ms) Measured Time (ms) Measured Time (ms) Measured Time (ms)
PHASE Pickup (A) Drop Off (A) @ 150% TAP @ 200% TAP @ 300% TAP @ 350% TAP REMARKS
0ms 0ms 0ms 0ms
PHASE A 0.940 0.890 36.7 31.6 26.8 28.7 OK
PHASE B 0.940 0.890 34 32.5 27.8 27.8 OK
PHASE C 0.940 0.890 36.6 31.6 28.8 26.9 OK
Current: ≤ ±2.5% setting or ±0.02In
Acceptance Criteria:
Time Delay: ≤ ± 1% times of setting or +40ms, at 2 times of operating current

2.2 DIRECTIONAL OVERCURRENT (67P) Stage 3: I_Set = 0.23A , TMSp = 0.08


Measured Time (ms) Measured Time (ms) Measured Time (ms) Measured Time (ms)
REMARKS
PHASE Pickup (A) Drop Off (A) @ 150% TAP @ 200% TAP @ 300% TAP @ 350% TAP
1376 802.3 504.2 N/A
PHASE A 0.235 0.230 1401 819.4 519.5 N/A OK
PHASE B 0.235 0.230 1396 819.1 516.8 N/A OK
PHASE C 0.235 0.230 1398 820.2 518.9 N/A OK
Trip Region: Counterclockwise Rotation: from 3° to 175°
Current: ≤ ±2.5% setting or ±0.02In
Acceptance Criteria:
Time Delay: ≤ ± 1% times of setting or +40ms, at 2 times of operating current

3.1 NON-DIRECTIONAL EARTH FAULT (50N) Stage 1: I_Set = 2.73A , t_Op = 0


Measured Time (ms) Measured Time (ms) Measured Time (ms) Measured Time (ms)
REMARKS
PHASE Pickup (A) Drop Off (A) @ 150% TAP @ 200% TAP @ 300% TAP @ 400% TAP
0ms 0ms 0ms 0ms
3IO 2.73 2.58 34.9 32.6 27.2 26.7 OK
Current: ≤ ±2.5% setting or ±0.02In
Acceptance Criteria:
Time Delay: ≤ ± 1% times of setting or +40ms, at 2 times of operating current

3.2 DIRECTIONAL EARTH FAULT (67N) Stage 3: I_Set = 0.1A , TMSg = 0.16
Measured Time (ms) Measured Time (ms) Measured Time (ms) Measured Time (ms)
REMARKS
PHASE Pickup (A) Drop Off (A) @ 200% TAP @ 400% TAP @ 600% TAP @ 800% TAP
1605ms 796.8ms 614ms 527.5ms
3IO 0.105 0.100 1624 812.6 627.1 538.4 OK
Trip Region: Clockwise Rotation: from 20° to -142°
Current: ≤ ±2.5% setting or ±0.02In
Acceptance Criteria:
Time Delay: ≤ ± 1% times of setting or +40ms, at 2 times of operating current
TESTING & COMMISSIONING
FEEDER PROTECTION RELAY
TEST REPORT

F-PMS-CTC-48, Rev 0,08-Aug-2022

4.1 OVERVOLTAGE (59) 59P1.U_set = 127V LL

Measured Time (ms) Measured Time (ms) REMARKS


PHASE Pickup (V) Drop Off (V)
Pickup Drop Off

PHASE A-B 73.4 73.2 999.8 22.7 OK


PHASE B-C 73.4 73.2 1005 20.1 OK
PHASE C-A 73.4 73.2 997 25.7 OK
A-B-C 73.4 73.2 1002 23.9 OK
Voltage: ≤ ±2.5% setting or ±1V
Acceptance Criteria:
Time Setting: ≤ ±1% setting or +60ms, at 1.2 times of trip voltage

4.2 UNDERVOLTAGE (27) 27P1.U_set = 92V LL

Measured Time (ms) Measured Time (ms) REMARKS


PHASE Pickup (V) Drop Off (V)
Pickup Drop Off

PHASE A-B 53.1 54.2 1015 26.1 OK


PHASE B-C 53.1 54.1 1006 34 OK
PHASE C-A 53.1 54.2 1018 27 OK
A-B-C 53.1 54.1 1026 20.5 OK
Voltage: ≤ ±2.5% setting or 1V
Acceptance Criteria:
Time Setting: ≤ ± 1% times of setting or +60ms, when trip value is set at 80% of setting

5. UNDER FREQUENCY (81F) 81U1_set = 59Hz

Pickup (Hz) Measured Time (ms) Measured Time (ms) REMARKS


Pickup (Hz) Drop Off (Hz)
Expected Value Pickup Drop Off

59 58.9 59 1004 34.4 OK


Frequency: ≤±20mHz
Acceptance Criteria:
Time Setting: ≤ ± 1.5% times of setting or +60ms

Remarks:

Signatories:
MIESCOR Client
Tested by: RAFAEL M. CUNANAN Reviewed by: JARETTE S. FERNANDO Witnessed by:

Tested by: JOHN CARLO B. IGNACIO Approved by: PORTIA O. IBIAS Approved by: