0% found this document useful (0 votes)
378 views

Fit-Up and Daily Welding Visual Inspection Report

This 3 sentence summary provides an overview of a welding inspection report for an inlet booster compressor project in Iraq: The report documents visual inspections of welds on spools and joints for mechanical, electrical, and instrumentation works on an inlet booster compressor project in Basrah, Iraq. It includes details such as material types, heat numbers, fit-up assessments, welding procedure specifications, and welder qualifications. Inspection results are noted and any non-conforming welds are flagged for further review.

Uploaded by

Aws Abduljaleel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
378 views

Fit-Up and Daily Welding Visual Inspection Report

This 3 sentence summary provides an overview of a welding inspection report for an inlet booster compressor project in Iraq: The report documents visual inspections of welds on spools and joints for mechanical, electrical, and instrumentation works on an inlet booster compressor project in Basrah, Iraq. It includes details such as material types, heat numbers, fit-up assessments, welding procedure specifications, and welder qualifications. Inspection results are noted and any non-conforming welds are flagged for further review.

Uploaded by

Aws Abduljaleel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Plant: North Rumaila – NGL – Basrah - Iraq Company Document No.

Project:
Inlet Booster Compressor – Mechanical, Electrical & Instrumentation Works Contract No. UI-38415
Job No.
Document Title: Document No.
Fit-Up and Daily Welding Visual Inspection Report Report No.
Date: Page No.: Of

Materials Heat No. Fit-Up Welders


Sr. Sht. Rev. Spool Joint Joint Dia. Sch. Flag Visual
ISO. Drawing No. ACC/ WPS Remarks
No. No. No No. No Type. Inch Thick Type Description 1 2 R F C Type Test
REJ

10

Sub-contractor QA,QC Al Bilal QA,QC BGC - QA,QC


Name Name Name