Ensure all material schedules, including pipes, tanks, valves, insulation, and floor drains match the approved material submittals. Review and correct legends and abbreviations to match the layout, such as pipe legend abbreviations. Review mechanical and plumbing legends and symbols, and isolation valve schedule.

Uploaded by

md zubair
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
445 views1 page

Dut VBJ SHD PDR PD L04 41078

Ensure all material schedules, including pipes, tanks, valves, insulation, and floor drains match the approved material submittals. Review and correct legends and abbreviations to match the layout, such as pipe legend abbreviations. Review mechanical and plumbing legends and symbols, and isolation valve schedule.

Uploaded by

md zubair
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Ensure all material schedules ( pipe, tank ,valve, REVIEW STATUS

Review & correct the legends / Abbreviations to match the


BFF BGG insulation , floor drain etc ) match with the ap- layout. Eg. RWP pipe legend. APPROVED APPROVED REJECTED FOR
FOR CONTINUATION REFER TO DWG: AS NOTED INFORMATION
proved material submittal.
A DUT-VBJ-SHD-PDR-PD-L04-12072 B MATERIAL SCHEDULE
DATE REVIEWED
L04-41078 L04-41078
SL. NO. DESCRIPTION MATERIAL LEVEL SCHEDULE

1 WASTE (WP) , SOIL (SP) & uPVC SOLVENT PIPE ABOVE GROUND BS EN 1329
MECHANICAL AND PLUMBING LEGENDS AND SYMBOLS REVIEWED BY
VENT PIPE (VP) DATE REVIEWED
ISOLATION VALVE SCHEDULE
2 WASTE (WP) , SOIL (SP) & PVC ORANGE PUSH PIT BELOW GROUND BS EN 1401-01
VENT PIPE (VP) WP WASTE PIPE REVIEWED BY

135
FOR CONTINUATION REFER TO DWG:

170
DUT-VBJ-SHD-PDR-PD-L04-12072 50Ø CDP 110Ø WP (FD) L/L 3
CONDENSATE DRAIN PIPE
(CDP) ABOVE 50mm
UPVC (SOLVENT WELD)
AND muPVC
ABOVE GROUND -
SL NO. SIZE (DIA) DESCRIPTION SERVICE Qty. Key Plan

460
N
BOP: 4465 110Ø WP (FD) L/L 4
CONDENSATE DRAIN PIPE
muPVC (SOLVENT WELD) ABOVE GROUND -
SP SOIL PIPE
(CDP) 50mm & BELOW

200Ø RWP H/L - T/B (OVERFLOW) 5


POTABLE WATER SUPPLY PIPE
HDPE ABOVE GROUND SDR-11
1. 250Ø ISOLATION VALVE RWP 2
MAIN (ELECTROFUSION WELDING)
CO POTABLE COLD WATER SUPPLY CDP CONDENSATE DRAIN
ACCESS LADDER 1675 6
PIPE (BRANCH)
PPR-CT ABOVE GROUND PN 20

TREATED GREY WATER SUPPLY


7 HDPE ABOVE GROUND SDR-11
MAIN (ELECTROFUSION WELDING)
POTABLE COLD WATER SUPPLY VP VENT PIPE
8 PIPE PPR-CT ABOVE GROUND PN 20

9 CONCEALED PIPING PEX ABOVE GROUND PN 20 PIPE SUPPORT SCHEDULE


PPWP PUMPED PRESSURIZED WASTE PIPE
10 RAIN WATER PIPE (RWP) uPVC ABOVE GROUND BS EN 1329
DISTANCE

2310
PIPE NOMINAL DIA BETWEEN THREADED ANCHOR NUMBER OF
PPSP
MH ROD SIZE SIZE THREADED ROD PUMPED PRESSURIZED SOIL PIPE
SUPPORT
mm M - - Nos
ISOLATION VALVE RWP RAIN WATER PIPE
1810 975
PIPE SLOPE 32Ø 1.22 M10 M10 1
250Ø RWP
BOP: 4610 PIPE DIAMETER SLOPE 40Ø 1.22 M10 M10 1 KWP
FOR CONTINUATION REFER TO DWG: 200Ø RWP KITCHEN WASTE PIPE
WP

DUT-VBJ-SHD-PDR-PD-L04-12072 BOP: 895


50Ø 1:40 50Ø 1.22 M10 M10 1
SPR FIRE FIGHTING SPRINKLER PIPE General Notes:
Ø25 CO 80Ø 1:50 80Ø 1.50 M10 M10 1
UPRIGHT SPRINKLER 1. DO NOT SCALE FROM DRAWINGS.
BOP:6070 2. ALL DIMENSIONS TO BE VERIFIED ON SITE.
110Ø 1:60 110Ø 1.50 M10 M10 1 3. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE AND FFL
LEVELS ARE MENTIONED WITH RESPECT TO IFC MEP DRAWINGS.
160Ø 1:90 160Ø 1.83 M12 M12 1 BOP OF PIPES RUNNING ABOVE SLAB LEVEL IS MENTIONED WITH RESPECT TO
FFL LEVEL IN MILLIMETER .
200Ø 1:120 200Ø 2.13 M16 M16 1 ABBREVIATIONS 4. ALL HORIZONTAL SANITARY LINES WILL BE INSTALLED WITH SLOPE AS REFERRED
IN THE DRAWING.

1540
Ø25 Materials shall 5. HORIZONTAL VENT LINES WILL BE INSTALLED SLOPE UP TOWARD VERTICAL 1:100.
RAIN WATER 200Ø RWP 250Ø 1:150 250Ø 2.13 M16 M16 1 comply with ap- 6. ALL DRAINAGE & VENT PIPE WILL BE uPVC DRAIN PIPE & SUMP PUMP DISCHARGE
250Ø RWP
BOP:6380
Ø25 PD/CB PARKING DRAIN / CATCH BASIN
TANK RM BOP: 885 proved material RISER PIPE WILL BE HDPE SDR 11 .
VENT COWL BOP:6060 submittal. 7. PIPE PASSING THROUGH FIRE RATED WALL SHALL BE SEALED WITH APPROVED
BOP: 4605 300Ø 1:200 300Ø 2.44 M16 M16 1 FIRE STOPPING MATERIALS.
FOR CONTINUATION REFER TO DWG: L04.051 FD 150X150 ENVOTEC SS FLOOR DRAIN 8. SUPPORTING OF EQUIPMENT AND SERVICES, SHALL BE AS PER TYPICAL DETAILS.
DUT-VBJ-SHD-FPR-PD-L04-11072 Ø65 9. THIS DRAWING MUST BE READ IN CONJUCTION WITH ALL THE ELV DRAWINGS.
BOP:5265 VENT COWL 10. FOR SHEET 02 DRAWING PLEASE REFER
FD-1 WATTS FD-100-C-L HEAVY DUTY FLOOR DARIN DUT-VBJ-SHD-PDR-PD-L04-41083
Confirm that the
sufficient access is WATTS FD-100-C-L6-1-F4-1 HEAVY DUTY
Ø65 Ø32 Ø32 available around the FD-2
Ø50 Ø32 FUNNEL DARIN
BOP:5495 BOP:6380 BOP:6060 tank for proper and ∅12mm HOLES
BOP:6055 BOP:5280 CO
periodic maintenance 512
TO CLEAN OUT
SUIT M10x100
ANCHOR BOLT

25
25 231 231 25
5 POSITIONS 3mm RUBBER GASKET
ISOLATION VALVE CD CHANNEL DRAIN

PARTITIONAL WALL AD AREA DRAIN

231

231
400

400
355
400
Ø25 KD KITCHEN DRAIN
BOP:6380
CL COVER LEVEL
200Ø RWP 1:120 AT L/L PIVOTING BYPASS ∅12mm HOLES
231 TO I.L PIPE INVERT LEVEL

20
DOOR
Ø25 AND WIRE ROPE FOR SUIT M10x100

3470
985 870 1470 2520 BOP:6060 SURFACE OPERATION ANCHOR BOLT
uPVC UNPLASTICIZED POLYVINYL CHLORIDE
975 5 POSITIONS
PIVOTING BYPASS DOOR HDPE HIGH-DENSITY POLYETHYLENE
Contractor to re-validate the SP SOIL PIPE
flow and head through
calculation and ensure that the WP WASTE PIPE
VENT COWL VENT COWL size & depth of pit is sufficient
250Ø RWP to collect rain water VP VENT PIPE
BOP: 4580 BGG

Level 05 (Podium P5) Level 05 (Podium P5) CDP CONDENSATE DRAIN PIPE
SSL +28.250m SSL +28.250m

250Ø RWP RWP RAIN WATER PIPE


ABOVE TANK 200Ø RWP Access to be positioned directly PPWP PUMPED PRESSURIZED WASTE PIPE
Ø40 BOP: 850 above bypass door in order for opera- ACCESS TO BE POSITIONED
ABOVE BYPASS DOOR

BOP:5395 tion of bypass door to drain down the PPSP PUMPED PRESSURIZED SOIL PIPE
CO Ø25 chamber for maintenance F/B FROM BELOW
800 800

BOP:5400

315
Model Reference:
DUT-DED-MOD-BIM-NA-ALL-00000_20210317_Published_R72 BIM FEDERATED MODEL (ALL DISCIPLINE)

ACCESS LADDER 200Ø RWP F/A FROM ABOVE

stainless steel rope T/B TO BELOW


1.2x1.2x4.2M
ACCESS COVER-800X800MM for maintenance ? T/A TO ABOVE MEP SHOP Drawing Reference:
LOAD RATING B125 indicate the size .
H.L HIGH LEVEL REFERENCE NUMBER-REV TITLE
FLOW RATE AT HYDRO BRAKE IS 2.2 LPS

1400
MH Ø32 DUT-VBJ-SHD-PDR-PD-L04-12072-03 LEVEL 04 (PODIUM P4) DRAINAGE LAYOUT SHEET 2
PRIMARY DESIGN HEAD IS 3.7M, SUMP DEPTH 295 MM U.G. UNDERGROUND
1865 1660 BOP:5395 Ensure the sump has sufficient width
DUT-VBJ-SHD-VEN-PD-L04-12072-02 LEVEL 04 (PODIUM P4) AC & VENTILATION LAYOUT SHEET 2

160Ø RWP L/L - T/B DUT-VBJ-SHD-CHW-PD-L04-13072-02 LEVEL 04 (PODIUM P4) CHILLED WATER LAYOUT SHEET 2

Ø25 & depth below the outlet pipe and 1200 BD BACK DROP DUT-VBJ-SHD-LCS-PD-L04-12072-01 LEVEL 04 (PODIUM P4) LIGHTING CONTROL SYSTEM LAYOUT SHEET 2
110Ø WP (FD) L/L
BOP:6060 -2 also benching of chamber as per
286 300
AFFL ABOVE FINISH FLOOR LEVEL
DUT-VBJ-SHD-LIG-PD-L04-12072-02

DUT-VBJ-SHD-ELC-PD-L04-15072-03
LEVEL 04 (PODIUM P4) LIGHTING LAYOUT SHEET 2

LEVEL 04 (PODIUM P4) CONTAINMENT LAYOUT SHEET 2


---
L04-41078 manufacturer’s recommendation

4200

4200
200
DUT-VBJ-SHD-CTV-PD-L04-18072-02 LEVEL-04 (PODIUM-P4) CCTV SYSTEM SHEET 2
200

CO CLEAN OUT DUT-VBJ-SHD-PWS-PD-L04-11072-02 LEVEL 04 (PODIUM P4) WATER SUPPLY LAYOUT SHEET 2

175

200

200
DUT-VBJ-SHD-EML-PD-L04-13072-01 LEVEL 04 (PODIUM P4) CENTRAL EMERGENCY BATTERY SYSTEM LAYOUT SHEET 2
Ø25 WB WASH BASIN DUT-VBJ-SHD-PWR-PD-L04-11072-02 LEVEL 04 (PODIUM P4) SMALL POWER LAYOUT SHEET 2

200
BOP:6060

426
C C WC WATER CLOSET
DUT-VBJ-SHD-ICT-PD-L04-16072-01 LEVEL 04 (PODIUM P4) IT / TELECOM LAYOUT SHEET 2

226
BENCHING
∅160mm
OUTLET DUT-VBJ-SHD-FPR-PD-L04-11072-03 LEVEL 04 (PODIUM P4) FIRE PROTECTION LAYOUT SHEET 2

1200
L04-41083 200Ø RWP H/L - T/B (OVERFLOW) L04-41083 512 ∅200mm
INLET
Y UR URINAL
DUT-VBJ-SHD-BWR-PD-L04-13072-01 LEVEL 04 (PODIUM P04 & 04M) BLOCK WALL OPENING LAYOUT SHEET 2

DUT-VBJ-SHD-BMS-PD-L04-14072-00 LEVEL 04 (PODIUM P4) BUILDING MANAGEMENT SYSTEM LAYOUT SHEET 2


110Ø WP (FD) L/L 200Ø RWP L/L - T/B ∅160mm

300
∅200mm

774
OUTLET INLET
SK SINK

400
DUT-VBJ-SHD-FAS-PD-L04-13072-00 LEVEL 04 (PODIUM P4) FIRE ALARM, PUBLIC ADDRESS & VOICE EVACUATION
560 610 1200 200 LAYOUT SHEET 2

247

200
200
BENCHING DUT-VBJ-SHD-BWR-PD-L04-14070-02 LEVEL 04 (PODIUM P4) PLINTH OVERALL LAYOUT
100
MH MANHOLE

541
800

840
Review and provide cor-

295
BENCHING

295
SUMP
BOP BOTTOM OF PIPE IFC
x rect reference number

200

200

200
Level 04 (Podium P4)
PLAN Level 04 (Podium P4)
Drawing Reference:
All the overflow to be SSL +21.250m SSL +21.250m
BFV BUTTERFLY VALVE
WSP Response: -
connected to the floor B REFERENCE NUMBER-REV TITLE
drain to avoid any 1. Access to be positioned directly above bypass door in order for operation of bypass door to
L04-41078 WH WATER HEATER DMCC-WSP-PO-04-DR-PHE-012072-04 LEVEL 04 (PODIUM P4) DRAINAGE LAYOUT SHEET 2 (DP-00858)

spillage of water in drain down the chamber for maintenance. 200 400 400 200 200 800 200 200 DMCC-WSP-XX-ZZ-DR-PHE-062002-04 DRAINAGE SCHEMATIC DIAGRAM SHEET 2 (DP-00785)
1200 NRV NON RETURN VALVE DMCC-1-WBD-ZZ-DR-AR-120401-02 FLOOR PLAN LEVEL 04 (PODIUM P4) (DP-00737)
tank room 2. Ensure the sump has sufficient width & depth below the outlet pipe and also benching of SECTION-X SECTION-Y DMCC-1A-WSP-5-DR-STR-140108-4-02 LEVEL 05 (PODIUM P5) GENERAL ARRANGEMENT PLAN - ZONE 2 (DP-00587)

chamber as per manufacturer’s recommendation.


A
L04-41078 3. Prior to executing work at site, shop drawing should comply & incorporate latest Arch/ STR/ 2 BENCHING DETAIL
IFC information & RFIs response. L04-41078
1 L04-RAINWATER STORAGE ROOM-051_COORDINATION DETAIL PLAN
L04-41078 SCALE: 1 : 25 4. All installations should be carried out in accordance to local regulations and standard. All pipe
slopes shall be as per DM standards / Regulations.
LEVEL 05 LEVEL 05
5. Routing and Slope of pipe work (PODIUM P5)
fully coordinated with other MEP services , structural elements (PODIUM P5)
SSL SSL
and maintain clear headroom requirement..
+28.350m +28.350m
6. Seismic rastraints / bracings shall
LEVEL be05
provided as per Seismic specialist recommendation.
25Ø SRP 32Ø SRP 25Ø SRP LEVEL 05
7. Ensure FCO/ CO/ Rodding Eye(PODIUM
have clear space for maintenance in future.
- P5) (PODIUM - P5)
SSL SSL
8. Floor drain/ FCO/Sanitary ware location shall be in-line with final setting out plan.
+28.250m +28.250m
25Ø SRP 32Ø SRP
9. Ensure adequate provision shall be made to deal with horizontal and vertical thermal expan- 25Ø SRP
25Ø SRP
sion & contraction movement. Contractor to submit study in-line with specification & specialist re-
commendation.
10. Sleeves to be provided for the pipes penetrating through the fire rated wall and approved pen- Indicate pipe supports.
25Ø SRP
etration materials (Fire Stopping) should be used and installed by the DCD approved specialist as per
regulation.
40Ø SRP 32Ø SRP 00 29.07.2021 ISSUED FOR APPROVAL JN KK DS
11. Pipe material and pipe sizes to follow as per approved material submittal/specifications. Rev. Date Description Drn. Ckd. Apd.
12. Provide detail of Level indication & interface details with BMS.
ISOLATION VALVE 250Ø RWP ISOLATION VALVE 250Ø RWP Employer:

DUBAI MULTI COMMODITIES CENTRE


50Ø CDP
Almas Tower
Jumeirah LAkes Towers
Dubai,United Arab
ACCESS LADDER ACCESS LADDER Emirates
VENT COWL STORMWATER TANK VENT COWL
VENT COWL STORMWATER TANK VENT COWL MH
MH SWT-L04-01&02
SWT-L04-01&02 Project Manager:

Turner Construction - International LLC

P.O. Box 13036, Dubai, UAE


T: +971 4 337 0990 | F: +971 4 334 8216
Gulf Towers Bldg., A2 Block, 8th Floor
Oud Metha Rd., Dubai, UAE
www.turnerconstruction.com/international
BOP= 6380

Consultant / Architect of Record:


BOP= 4605
BOP= 6380
BOP= 5265

WSP Middle East


BOP= 6060

BOP= 6060
BOP= 6060

BOP= 5280
BOP= 5400
BOL= 5200

BOL= 5200
BOL= 5200
Architectural & Engineering
Consultancy

Access ladder shall P.O Box: 7497, Dubai U.A.E


Tel: +971 4 523 1999 | Fax: +971 4 523 1998
www.wsp.com

be provided external 27th Flr. Office Suite 2703A&B


U-Bora Tower, Al Abraj St. Business Bay
and internal to the Dubai,United Arab Emirates
LEVEL 04 MEZZANINE
tank
FFL for proper
+24.100m
-
2 LEVEL 04 MEZZANINE
FFL +24.100m
Main Contractor:
BOP= 4465

---
L04-41078
BOL= 5200

maintenance
4200

MEP J.V - Contractor:

Six Construct Co. Ltd. P.O Box : 29384, DUBAI, uae.


P.O Box 13055 Tel : 04-8060000 Fax : 04-8833955
Tel : +971 4 3472777 Website : www.voltas.com
Fax : +971 4 3473512
200Ø RWP 200Ø RWP
200Ø RWP Project Name:
SLOPE 1:120
UPTOWN DUBAI PHASE 1
Jumeriah Lake Tower, Free Zone
Dubai, United Arab Emirates

Drawing Title

Level 04 (PODIUM 4) RAINWATER TANK ROOM


840

885
160Ø RWP L04.051 ENLARGED PLAN & SECTION DETAIL
400

PLINTH LEVEL 04 (PODIUM P4) PLINTH LEVEL 04 (PODIUM P4)


FD FD FFL +21.350m
FD
FFL +21.350m
LAYOUT SHEET 01
FD
LEVEL- 04 (PODIUM P4) LEVEL- 04 (PODIUM P4)
FFL +21.250m FFL +21.250m Drawn by: Checked by: Approved by:
JN KK DS
Scale Sheet Size Sheet
As indicated A0 01 OF 02
A L04-RAINWATER STORAGE ROOM-051_SECTION A-A B L04-RAINWATER STORAGE ROOM-051_SECTION B-B
L04-41078 SCALE: 1 : 25 L04-41078 Drawing Number Revision.