Plinth Tie & Foundation Beam First Floor Beam: 9"X14" Main Beam 9"X14" Main Beam 9"X14" Main Beam

Uploaded by

Sashank Gaudel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views

Plinth Tie & Foundation Beam First Floor Beam: 9"X14" Main Beam 9"X14" Main Beam 9"X14" Main Beam

Uploaded by

Sashank Gaudel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

FOR OFFICIAL USE ONLY

A B C A B C
2"
13'-3" 13'-0" 13'-3" 13'-0"

2"
L/3 L/3(TOP BAR LAP ZONE) L/3
4 4 4 4 GENERAL NOTES FOR BUILDING:
2'-3"

9"X14" Main Beam 9"X14" Main Beam 1. Safe Bearing Capacity of soil 150KN/m2.
2'-5" LAP=Ld L/4 LAP=Ld 2'-5" 2. Use M20 grade concrete for all members
L (1:1.5:3(Cement:Sand:Aggregate)).
3. Use Fe415 grade steel (fy=415 N/mm2)
9"X14" Main Beam
9"X14" Main Beam
9"X14" Main Beam

2'-0"
LAP DETAIL OF BEAM 8mm dia Chair resting on Bottom bars 4. Clear cover to Bars
13'-3"

13'-3"
13'-3"

13'-3"

a. For Footing bars = 50mm (0'-2")


All Tie Beams 2'-0" b. For Longitudinal bars for Columns = 40mm (0'-1.6")
9"x9"are ± 0'0"Lvl. 4'-0" 4'-0" c. For main bars in beams = 25mm (0'-1")
8Ø-12"c/c 8mm dia Chair resting on Slab formwork
Extra Top Bar d. For outer bars in slab = 15mm (0'-0.6")
e. For Staircase waist slab = 20mm (0'-0.8")
4. Bars in column shall be spliced only at the mid height of column.
3'-9"
1'-10" 3'-0"

5. Development/Lap length (Ld) for bars for M20 concrete.


3 3 3 3 Diameters of Bars, ∅ mmFor Fe415, Ld=47∅mm For Fe500, Ld=57∅mm6280
9"X14" Main Beam

9"X14" Main Beam


9"X14" Main Beam

9"X14" Main Beam 9"X14" Main Beam (1'-0")340 (1'-1")8375 (1'-3")455 (1'-6")10470
1'-6"

2'-0" 2'-0"
0.25L or Ld 0.25L or Ld
whichever is greater whichever is greater
4'-0" 4'-0" (1'-7")570 (1'-10")12565 (1'-11")685 (2'-3")16750 (2'-6")910 (3'-0")
6'-0"

6'-0"

6'-0"

6'-0"

1" GAP BETWEEN BARS


6.Distribution Reinforcement for slab = 8 dia. @ 150mm c/c
Ld
3'-7" 1'-10"

1'-6"

7.Top bars could be curtailed at 0.25 of short span edge of support.


2 2 2 2 8.Cut for staircase can be made any where as desired with slab edge detail
9"X14" Main Beam 9"X14" Main Beam 9.No wall other than parapet shell be built on cantilever slab.
8Dia (Fe415)-500
3'-0"

10.The bars extending through adjacent spans to any span less than 2m shall
9"X14" Main Beam

9"X14" Main Beam

not be curtailed.
9"X14" Main Beam

Ld
0.1L 0. 15L
2'-0" 3'-4" 3'-3" 2'-0" 1" GAP BETWEEN BARS 11.Exposed surface of concrete shall be kept continuously wet or damp at
11'-0"

11'-0"

11'-0"

11'-0"

least for one week.


12.In normal circumstances,formwork can be removed only after two weeks
8Ø-6"c/c c/c spacing of concreting.
Main bar
Grade of steel 13.Dimension could not be measured directly from drawing.
14.Contractors shall be responsible for checking field dimension & site
L
1'-10"

1'-10"

9"X14" Main Beam 9"X14" Main Beam Diameter of bar conditions.


1 1 1 1 TYPICAL LOCATION FOR BEAM BARS 15.The line of slope between adjecent excavations for footing or along
CHAIR BAR FOR SLAB stepped footing shall not exceed a rise 1 in a run of 2. 4. Placing of fundation
13'-3" 13'-0" 13'-3" 13'-0" concrete shall be done as soon as excavations have been completed &
approved by the site engineer.
16. Recommended Members Sizes and Minimum Reinforcement
A. Roof and Floors Slab
A B C A B C Thickness: 125 mm (5”), Steel: 8ϕ (Fe 415),
B. Roof and floors Beams (both directions)
Width: 230mm (9”) or 250 mm (10”)
BEAM PLAN ( +9'-5" Lvl ) 3'3" Depth: 355 mm overall depth including slab
SLAB REINFORCEMENT DETAIL 8mm Ø @ 8" c/c
C. Plinth & Foundation Tie beam (both directions)
Width: 230 mm (9”), Depth: 230 mm (9”) overall depth
1 2 3 4 13'-3" 1 Width of beam should be adopted depending on the thickness of toe wall i.e. as per
the availability of brick sizes.
1 1 1 1 1 1 1 1 1 10"
D. Staircase
Flight thickness: 125 mm (5”)
12mm Ø @ 1'-0" 12'-3" 1'-0"
3'-0''(0.25 L) 3'-0''(0.25 L) 1'-6''(0.25 L) 1'-6''(0.25 L) 3'-9" (0.25 L) 3'-9" (0.25 L)
6" c/c Landing 17.This structural drawing is designed as per NBC Code 205:2012
Resting

7"
Lower LVL 8'10"
8mm Ø @ 8" c/c on Wall
9"

1'-0"
Foundation & Plinth Tie Beam
2-L- 8Ø @ 4"c/c 2-L-8Ø @ 6"c/c 2-L- 8Ø @ 4"c/c 2-L- 8Ø @ 4"c/c 2-L-8Ø @ 6"c/c 2-L- 8Ø @ 4"c/c 2-L- 8Ø @ 4"c/c 2-L-8Ø @ 6"c/c 2-L- 8Ø @ 4"c/c
1 1 11'-0" 1 1 1 1 1 1 1 Plinth
12mm Ø @
6'-0" 13'-3" 6" c/c
Beam

14'-9"

13'-9"
ROOM
W
(15'6"X14'0")
1 2 3 4 STAIR FIRST FLIGHT
3 B 3 2 A 2 3 B 3
D1
3'-0''(0.25 L) 3'-0''(0.25 L) 1'-6''(0.25 L) 1'-6''(0.25 L) 3'-9" (0.25 L) 3'-9" (0.25 L) 2'-
4"

1'-0"
11"
8mm Ø @ 8" c/c
14"

Main Floor LVL

7"
2-L- 8Ø @ 4"c/c 2-L-8Ø @ 6"c/c 2-L- 8Ø @ 4"c/c 2-L- 8Ø @ 4"c/c 2-L-8Ø @ 6"c/c 2-L- 8Ø @ 4"c/c 2-L- 8Ø @ 4"c/c 2-L-8Ø @ 6"c/c 2-L- 8Ø @ 4"c/c Main Beam 8mm Ø for each step
Floor beam
3 B 11'-0"
3 2 A
6'-0"
2 3 B 13'-3"
3
12mm Ø @
6" c/c 10" STAIR CASE PLAN
8mm Ø @ 8" c/c 2'-
4" 8m
m
1 2 3 4 Ø
3'3" fo
5 D 5 4 C 4 5 D 5 re
ac
3'-0''(0.25 L) 3'-0''(0.25 L) 1'-6''(0.25 L) 1'-6''(0.25 L) 3'-9" (0.25 L) 3'-9" (0.25 L)
h ste
12mm Ø @ 6" c/c 10" p
Second & Third Floor LVL Landing
14"
Main Beam Resting

7"
2-L- 8Ø @ 4"c/c 2-L-8Ø @ 6"c/c 2-L- 8Ø @ 4"c/c 2-L- 8Ø @ 4"c/c 2-L-8Ø @ 6"c/c 2-L- 8Ø @ 4"c/c 2-L- 8Ø @ 4"c/c 2-L-8Ø @ 6"c/c 2-L- 8Ø @ 4"c/c STAIR SECOND FLIGHT on Wall
8mm Ø @ 8" c/c
5 D 11'-0" 5 4 C 4 5 D 13'-3" 5
6'-0" 12mm Ø @ 6" c/c
BEAM ALONG GRID B 8m
m STAIRCASE
Ø DETAIL AT- B
fo
re
ac
hs
tep
A B C 10"
1 1 1 2'-4"
1 1 1 8mm Ø @ 8" c/c

7"
3'-4"(0.25 L) 3'-4" (0.25 L) 3'-3''(0.25 L) 3'-3''(0.25 L) 12mm Ø @ 6" c/c 2'-
4"
Lower LVL

9"
Foundation & Plinth Tie Beam 10"
2'-4"
2-L- 8Ø @ 4"c/c 2-L-8Ø @ 6"c/c 2-L- 8Ø @ 4"c/c 2-L- 8Ø @ 4"c/c 2-L-8Ø @ 6"c/c 2-L- 8Ø @ 4"c/c 12mm Ø @ 8" c/c
2'-

7"
4"
1 1 13'-3" 1 1 1 1 STAIRCASE DETAIL AT- A
13'-0"
STAIRCASE
DETAIL AT- C
TABLE BEAM REINFORECEMENT TABLE BEAM REINFORECEMENT
A B Owner Signature
C
3 B 3 3 B 3 Span < 10' 10' < Span Span < 10' 10' < Span MRS. SARITA DEVKOTA
S.N.
3'-4"(0.25 L) 3'-4" (0.25 L) 3'-3''(0.25 L) 3'-3''(0.25 L) Intermediated Beam End Beam Intermediated Beam End Beam
Intermediated Beam End Beam Intermediated Beam End Beam BUILDING TYPE LOCATION
2-12 ØTH+1-12ØEXT 2-12 ØTH+1-12ØEXT 2-12 ØTH+1-16ØEXT 2-12 ØTH+1-16ØEXT Tarkeswor-5 , Kathmandu

Foundation Beam
Residential

14"
Main Floor LVL 2-12ØTH 2-12ØTH 2-12ØTH 2-12ØTH

Plinth Tie &


Main Beam
12 12 12 12 12 12 12 16 12 12 16 12
2-L- 8Ø @ 4"c/c 2-L-8Ø @ 6"c/c 2-L- 8Ø @ 4"c/c 2-L- 8Ø @ 4"c/c 2-L-8Ø @ 6"c/c 2-L- 8Ø @ 4"c/c
1 12 12 12 12 12 12 16 16 PLOT NO. AREA

1'2"

1'2"

1'2"

1'2"
9"

9"

9"

9"
3 B 13'-3" 3 3 B 3 12 12 12 12 12 12 16 16
12 12 12 12 12 12 12 12 12 12 12 12
342 127.18 Sq.m.
13'-0"

Second Floor
2-12ØTH 2-12ØTH 2-12ØTH 2-12ØTH 3-12 ØTH 3-12 ØTH 3-12ØTH 3-12 ØTH
DRAWN BY CHECKED BY
3

Beam
Section At 1-1 Section At 1-1 Section At 1-1 Section At 1-1 Section At 4-4 Section At 5-5 Section At 4-4 Section At 5-5
Ar. Anjana Shrestha
2-16ØTH+1-16ØEXT 2-16ØTH+1-16ØEXT 2-16ØTH+1-12ØEXT 2-16ØTH+1-12ØEXT 2-12 ØTH 2-12 ØTH 2-12 ØTH 2-12 ØTH Akash Maharjan
A B C 16 16 16 16 16 16 16 12 16 16 12 16
Signature
12 12 12 12 12 12 12 12
5 D 5 5 D 5

1'2"

1'2"

1'2"

1'2"

1'2"

1'2"

1'2"

1'2"
DRAWING TITLE

First Floor Beam


3'-4"(0.25 L) 3'-4" (0.25 L) 3'-3''(0.25 L) 3'-3''(0.25 L) 12 12 12 12 12 12 16 12 16 16 12 16 12 12 12 12 12 12 12 12 12 12 12 12
STRUCTURAL DRAWINGS AND
Second & Third Floor LVL 3-12ØTH 3-12ØTH 2-16ØTH+1-12ØEXT 2-16ØTH+1-12ØEXT 3-12 ØTH 3-12 ØTH 3-12ØTH 3-12 ØTH
REINFORCEMENT DETAILS SHEET NO. S/2
Main Beam 2

14"
Section At 2-2 Section At 3-3 Section At 2-2 Section At 3-3 Section At C-C Section At D-D Section At C-C Section At D-D
DATE SCALE NEC REG NO. / CLASS
2-L- 8Ø @ 4"c/c 2-L-8Ø @ 6"c/c 2-L- 8Ø @ 4"c/c 2-L- 8Ø @ 4"c/c 2-L-8Ø @ 6"c/c 2-L- 8Ø @ 4"c/c
2-16ØTH 2-16ØTH 2-16ØTH 2-16ØTH
1576'A'

Roof and Stair


2-12 ØTH 2-12 ØTH 2-12ØTH 2-12 ØTH 2O77 -9-15 1" = 81'

Cover Beam
5 D 5 5 D 5 16 16 16 16 16 16 16 16
12 12 12 12 12 12 12 12
13'-3" 13'-0" OFFICE STAMP

1'2"

1'2"

1'2"

1'2"
4

1'2"

1'2"

1'2"

1'2"
12 12 12 12 12 12 16 12 16 16 16

12 12 12 12 12 12 12 12 NM Global Engineering Consulting


2-12 ØTH 2-12 ØTH 2-12 ØTH 2-12ØTH Mentors Pvt. Ltd.
BEAM ALONG GRID 4 3-12ØTH 3-12ØTH 2-16ØTH 2-16ØTH
Section At 6-6 Section At 6-6 Section At 6-6 Section At 6-6 Balaju-16, Bypass, Kathmandu,
Section At A-A Section At B-B Section At A-A Section At B-B
Nepal