Itp Havac
Itp Havac
Project
LINDE ENGINEERING
Shell Project No: HP-3000-QAT Contractor Project No: 5887
Project Document Number: T- 4.318.613 Project Rev.: O Page 1 of 8
SUPPLIER/VENDOR DOCUMENTATION
Purchaser signature below does not indicate responsibility or liability for accuracy or completeness of this document, nor
does it alter any contractual terms or conditions or relieve the Supplier/Vendor of his contractual obligations.
No Comments. ACCEPTED.
Code 1 Work May Proceed.
Proceed .
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Pearl GTL
Project
LINDE ENGINEERING
Unit(s): ASU
Trusted by over 1 million members
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Document Title:
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
1.0 DOCUMENTATION
T.4.234.542; T.4.250.935;
1.1 Contractor drawings 100% RFC QCI RFC H R R
T.4.250.936
2.0 MATERIALS
3.1 Ready for duct installation 100% T-4.234.564 DEP 31.76.10; DEP 31.76.11 QCI Linde MC Certificates I R R
Initial Installation of
3.2 100% T-4.234.564 DEP 31.76.10; DEP 31.76.11 QCI GAM-QCR-QAC-GTL-172
GAM-QCR-QAC-GTL-172 I I S
supports/hangers
Visual inspection of
3.3 100% T-4.234.564 DEP 31.76.10; DEP 31.76.11 QCI GAM-QCR-QAC-GTL-172
GAM-QCR-QAC-GTL-172 I I S
deformation/damage
Installation of Dampers,
3.4 100% T-4.234.564 DEP 31.76.10; DEP 31.76.11 QCI GAM-QCR-QAC-GTL-172
GAM-QCR-QAC-GTL-172 I I S
louvers, sand traps and grills
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
INSPECTOR
ITEMS TO BE CHECKED INITIAL REMARKS
1 Visual damage
2 Quantity
3 Test certificates
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
REPORT NO.:
SITE INSPECTION REPORT
DATE:
Corrective Action:
NCR Required YES NO (Circle one) CTQ to Contractor Required YES NO (Circle one)
Remarks if any:
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions!
Remarks: