RA - INSTALLATION OF FCU:AHU and FAHU
RA - INSTALLATION OF FCU:AHU and FAHU
PRE-START CHECKLIST
Date: 21-10-2023
Project Name: ZARA STORAGE, MOE
Time: 03:00 PM
Minor
Corrective Medical Treatment.
Med Med Med Low Low
No work restrictions/ 2
Local on-site environmental release treated locally/ 10-
10 8 6 4 2
100k AED
Negligible
First Aid Case/ Minor cuts & bruises or Low Low Low Low Low
1
sickness/Preventive OR Diagnostic Medical Treatment. 5 4 3 2 1
Nuisance release with no adverse impact/ 1-10k AED
Probability Rating 5 4 3 2 1
Assessor’s Sire
Shaji TP Position: Signature:
Name: Superintendent
Sathiyamoorthy Construction
Approved By: Position: Signature:
Meyyappan Manager
Shree Shankar
Reviewed By: Position: CRC Signature:
Sankaran Nair
Risk Assessment Review Date of Next
21 October 2023 6 months 20 April 2023
Date: Period: Review: