Inspection Check List For Installation of Fcu

The inspection checklist summarizes 10 key points to check during the installation of fan coil units (FCUs) at a storage location in Zara, including: verifying the materials and equipment match approved plans; checking for damage during transport; ensuring correct model, location and orientation; verifying condensate pipe connections; checking power and control wiring is complete; and verifying labels and clearances for maintenance. Representatives from the project management, quality assurance, and supervision are required to sign off to confirm the inspection.

Uploaded by

RAJA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
511 views2 pages

Inspection Check List For Installation of Fcu

The inspection checklist summarizes 10 key points to check during the installation of fan coil units (FCUs) at a storage location in Zara, including: verifying the materials and equipment match approved plans; checking for damage during transport; ensuring correct model, location and orientation; verifying condensate pipe connections; checking power and control wiring is complete; and verifying labels and clearances for maintenance. Representatives from the project management, quality assurance, and supervision are required to sign off to confirm the inspection.

Uploaded by

RAJA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

INSPECTION CHECK LIST

ZARA STORAGE Document No.:


Revision: 0
MOE Date:
Page 1 of 1

INSPECTION CHECK LIST FOR INSTALLATION OF FCU

Location / Area:

Sr. No. Description Yes No Remarks


Ensure that the MIR has been raised for consultant approval
1
before installation at site.
Ensure that the materials are as per approved material submittal.
Ensure that the Mechanical /structural damage during
2
transportation to location.

Check correct model, location & orientation of Units are as per


5 approved shop drawings

Check the provision for U-trap for condensate pipe connection


6 with necessary slope.

Ensure that the sizes of the installed chilled water pipes & valves
connected to the equipment as per approved shop drawings.
7
Check all the power cabling & control wiring is complete.

Check and ensure adequate clearance available for service


8 maintenance and removal of parts.

Check the cooling coils are clean and combed.


9

10 Check that identification labels are provided in the units.

PM/PE NAME : SIGN :

QA/QC ENGINEER NAME : SIGN :

SUPERVISOR/FORMAN NAME : SIGN :

Comments / Remarks, if any:

Representative: ALEMCO CONSULTANT

Signature

Name
Date