The document outlines the methodology for setting out the proposed South Beach Weligama condominium development. It details establishing horizontal and vertical control points using total stations and dumpy levels. Control points will be set and the building corners and axes will be established based on approved drawings. Levels will be transferred between floors to ensure vertical alignment. The work will be inspected and approved by relevant authorities before construction begins.

Uploaded by

Chamux skal
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views

MS For Setting Out

The document outlines the methodology for setting out the proposed South Beach Weligama condominium development. It details establishing horizontal and vertical control points using total stations and dumpy levels. Control points will be set and the building corners and axes will be established based on approved drawings. Levels will be transferred between floors to ensure vertical alignment. The work will be inspected and approved by relevant authorities before construction begins.

Uploaded by

Chamux skal
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

PROPOSED SOUTH BEACH WELIGAMA

CONDOMINIUM DEVELOPMENT AT
WELIGAMA

METHOD STATEMENT
FOR
SETTING OUT

?.uI h,Pl!*$1"]=t"1f "{A PVT


( } LrD
?5:258jermiB Gard€a,Ha\rnca,fnia0i.1r€.Sri Lanka
:-. . ti ..,r:r1.ltF .4r :i;:_.?

fn h
i::

.:'"'.:'t:"""'
UY,,.;,,;".1.","";l @ n ffi "":.

;Q.ASAD SURVEYS (FVTi t


No, 40/1/1, Bandarawatta;
Katuwawala, Boralesgamuwa"
. $112518391, Fax: 01125X"
:. ::,i: prasadsurvey.Pvt@fi rn*'
r
Method Statement for Setting Out

TABLE OF CONTENTS PAGE NO

1 Purpose......................................................................................................................................................... 2
2 Scope ............................................................................................................................................................. 2
3 Specification and Drawing Reference ........................................................................................................ 2
4 Equipment .................................................................................................................................................... 2
5 Resources and Manpower ........................................................................................................................... 2
6 Methodology ................................................................................................................................................. 3
7 Inspections and Approvals .......................................................................................................................... 6
8 Health and Safety ......................................................................................................................................... 7

1|Page
Method Statement for Setting Out

1 Purpose.

 A building need to be taking established in corrected location as per relevant


regulations.

2 Scope.

 Making actual site level and drawing, placing control point (TBM) and establish
building corners as per approved by relevant authorities.

3 Specification and Drawing Reference.

 Licensed survey guideline.


 2022 / BML / SBW / SD / AR /001
 2022 / BML / SBW / SD / AR / 002

4 Equipment.

 Total Stations.
 Dumpy Level.
 Optical Square.
 Cross Staff.
 Line Markers.
 Tape.
 Timber Pegs.

5 Resources and Manpower.

 Licensed surveyor
 Assistant Surveyors
 Survey Attendants

2|Page
Method Statement for Setting Out

6 Methodology:

6.1 Horizontal and Vertical Control.

 The subsequent Control Points (4 Nos) were set out by the Surveyor at site by
referring to the already placed GPS Points (4 Nos) and these Control Points are
denoted as TS.02, 9008, 9009 and 9010.
 These 4 Nos of Control points consist with coordinates (Northing & Easting)
and Elevation in teference Mean Sea Level (MSL).
 Every point should be clearly sighted in the place. These traverse points have to
be maintained for a long time.

6.1.1Surveying for horizontal control points.

Before the surveying for datum points, the Surveyor should take a re-check for the
control point provided by employer.

i. Method of horizontal control.

a).Angel Measurement.

 Observation made use of target prism mounted on tripod.

 Two rounds of "face left' & "face right' reading on setting 0, 90,180,270
degrees, would be carried out.

 Maximum difference of the observed angle will allow exceeding 5".

 Correction to be applied for slope distance, instrument constant, temperature


& barometric pressure.

3|Page
Method Statement for Setting Out

b).Distance Measurement.

 Verify & the EDM/Total station and the stability of control point by making
a check distance from the originating to another knows control station.

 Minimum of 4 reading to each targetwould be taken in both faces. (See


appendix B)

b).Computation.

 Coordinate of all traverses, to establish the Secondary Control points which


were run between initial Control points were done, using the Bowditch
Method for the adjustment of traverse.
 Adjusted Field angle and mean horizontal angle were used for the
calculation of the Azimuth and Coordinates.
 The miscoluser also adjusted by the same software. Print out of the observed
horizontal angle and distance, correction of angle and distance, adjusted
azimuth. Adjusted coordinates and the error summaries were taken and
issued. The adjusted values used as the final values. (See appendix C)
Accuracy of traverse (for secondary control) 1:20000.

6.1.2. Surveying of Vertical Control Points.

To ensure the accuracy of vertical construction, we set up the vertical control network.
Before the built of vertical control point, the survey should take a re-check for the
control point provided by employer, we can used these points only when their error
conforms to specification.

 The Auto level will carry out a two-peg test before survey.

 Back sight and fore sight distances should be kept equal as far as possible.

4|Page
Method Statement for Setting Out

6.2 Setting out Procedure.

All Structure points will be coordinated from the data of structural drawings and
setting out by the Total station from the well-established secondary and tertiary control
points.
Detailed survey setting out plan will be submitted after finalizing the details related to
Construction Drawings.

6.3 Surveying for Axis Plane and Level of Floors.

Level base point of floor should be laying off correctly to assure accuracy
requirement in vertical control. There should be 3 vertical points in every floor. Error
should not more than 3mm in checking around 3 points and using average value as level
Control base point. Paint a triangle mark with red paint and indicating absolute
elevation and relative level.
Laying off the +1.000 line on the wall and columns, the error should less than 2mm,
painting ink line and indicating level.

6.4 Axis vertical alignment checking.

Figure 01: Checking of vertical alignment using Total station or laser plummet.

5|Page
Method Statement for Setting Out

As reference 4 Nos of sleeve holes will be constructed at designated locations of


the building using 110mm diameter PVC pipes at each floor with same vertical
alignment. These designated locations for with same vertical alignment.

Transfer of control points; setting up the laser aligner at the datum point of first floor
and adjusting it to collimation, then turning on the power switch. Target will be used in
receiving the light beam vertical with this points which sending by laser aligner at the
hole of slab. Center of a light circle in target as the transfer point upward.

Acquisition of point location of laser done as Figure 02 shown below.

Figure 02: Acquisition of point location of lase.

6.5 Level Transfer.

Using Level machine can transfer Reference level (ex.1m level from SFL) to lift core
wall and after that using steel measuring tap will be fixed on reference line on wall and
transfer to levels for each upper floor. TBM’s at each floor levels will be installed
during construction stage.

6|Page
Method Statement for Setting Out

6.6 Checking of Building Line.

After self-check of Horizontal control network and setting out of every story has passed,
surveyor should report to Employer/Consultant to check obtain the consent to proceed
the construction work.

Flowing should be re-checked

 Position of columns and position of core wall.


 Horizontal control network.
 Vertical control network.
 Vertical transfer of control line and closing error.
 Axis of columns and walls, size and location of hole.

7 Health and Safety:


 In accordance with the BML Health and safety guidelines.

8 ANNEXURE:

1. Traverse Survey Angel and Distance Sheet.


2. Adjustment of Angles Sheet.
3. Travers Adjustment Sheet.
4. Surveying Level Sheet.
5. Adjustment coordinates Sheet.

7|Page
Method Statement for Setting Out

TRAVERSE SURVEY ANGLE AND DISTANCE SHEET.

Date Traverse Line sketch.

Traverse No

Observer

Recorder

Instrument used

Station occupied
Station observed

Horizontal Dis. 01

02

03

04
Mean horriz.Dist

HORIZONTAL ANGELS INCLUDED ANGELS

0 , ,, 0 , ,,
Face Left
Face Right

Mean

Surveyed By: - Approved/Witnessed By: -

Surveyor :- Engineer Designation :-

Date: - Date: -

8|Page
ADJUSTMENT OF ANGLE SHEET.

Station OBSERVED ANGLE Adjustment ADJUSTMENT ANGEL

D M S D M S

ADJUSMENT:-……………………

9|Page
Method Statement for Setting Out
TRAVERS ADJUSTMENT SHEET
Back
Line Coordinate Differences Coordinate Station
Bearing
Whole
Adjusted Horizontal
Station Circle Calculated Adjustment correction
LHA Distance
Bearing
Forward
Line
Bearing

Σ=

10 | P a g e
Method Statement for Setting Out
CONTROL SURVEY TRAVERSE

Station Back Sight Intermediate Fore Sight HI Reduced Level Distance Remarks
Sight

11 | P a g e
Method Statement for Setting Out
ADJUSTED COORDINATE SHEET

Point Northing Easting Elevation

12 | P a g e
Method Statement for Setting Out
FRO
M
WE
LIG
AM N
A
TS 2
996.468 N
984.777 E
2.683 EL

RO
44 33 A
8 O
D
N
43 7
34
M 35 TO
42 MA
TAR
6 A
BU
ILD
MEP ING
BUILDING 36 LIN
E
41 37
O 8
N
40
39 38
M 7

9010 6
953.483 N
920.653 E

17
K 18
J
16 5 30
19
I
29

20
28
27
26
E

25
LIN

BU
21
24

H
23

ILD
ING

22
21

ING
20
19
18

15 4
17 14

LIN
16 13
ILD

G
15 05

E
04

22
03
02
01
BU

14 3 F
23
D

E
A

24
O

D
R

25
C
13 2 26
12
B 27
1 A
E
LIN
ING

MAIN BUILDING
28
ILD

5
BU

K
PO
J OL BU 4
11 RE
SER
VA
ILD
ING 29 9009
10 I TIO
N
RE
SE RV 3
9 H
AT
ION 30 919.391 N
976.810 E
8 G
7 F 2
CC 6 E 31
DL 1
INE
5 D 32
4 C
3 B
VEG
ETA
2 A
TION
LINE 1

9008
888.958 N
957.667 E

PROJECT : Site : SURVEYED AND DRAWN BY -: APPROVED BY :


Scale 1: 500
WELIGAMA - MATARA
PROPOSED CONDOMINIUM DEVELOPMENT SOUTH BEACH Drawn by M.W.N.R.K
Client :
WELIGAMA PROPERTIES (PVT)LTD AT WELIGAMA Drawing No. SET / SUR / WELI/2 PRASAD SURVEYS (PVT) LTD.
NO.40/1/1, BANDARAWATTA, KATUWAWALA,
BORALESGAMUWA, SRI LANKA.
TITLE : Note : Surveyed on 30th March 2022 TEL:+94-112518391, 0777-323024 ,+94 602151326 U.K.G. PRASAD S. PUSHPAKUMARA
SETTING OUT DRAWING FOR GRID LINES Co-ordinates are in Meters with 05th April 2022 FAX : +94 112518391
REGISTERED LICENSED SURVEYOR & LEVELLER
E-mail : [email protected]
ACCORDING TO THE DWG. NO.SBW-BS-XX-00-DR-A-00006-P00 Reference to Arbitrary Datum Values Sheet No. 01 of 01 Web l : www. prasadsurvey.com 06th APRIL 2022