MS For Setting Out
MS For Setting Out
CONDOMINIUM DEVELOPMENT AT
WELIGAMA
METHOD STATEMENT
FOR
SETTING OUT
fn h
i::
.:'"'.:'t:"""'
UY,,.;,,;".1.","";l @ n ffi "":.
1 Purpose......................................................................................................................................................... 2
2 Scope ............................................................................................................................................................. 2
3 Specification and Drawing Reference ........................................................................................................ 2
4 Equipment .................................................................................................................................................... 2
5 Resources and Manpower ........................................................................................................................... 2
6 Methodology ................................................................................................................................................. 3
7 Inspections and Approvals .......................................................................................................................... 6
8 Health and Safety ......................................................................................................................................... 7
1|Page
Method Statement for Setting Out
1 Purpose.
2 Scope.
Making actual site level and drawing, placing control point (TBM) and establish
building corners as per approved by relevant authorities.
4 Equipment.
Total Stations.
Dumpy Level.
Optical Square.
Cross Staff.
Line Markers.
Tape.
Timber Pegs.
Licensed surveyor
Assistant Surveyors
Survey Attendants
2|Page
Method Statement for Setting Out
6 Methodology:
The subsequent Control Points (4 Nos) were set out by the Surveyor at site by
referring to the already placed GPS Points (4 Nos) and these Control Points are
denoted as TS.02, 9008, 9009 and 9010.
These 4 Nos of Control points consist with coordinates (Northing & Easting)
and Elevation in teference Mean Sea Level (MSL).
Every point should be clearly sighted in the place. These traverse points have to
be maintained for a long time.
Before the surveying for datum points, the Surveyor should take a re-check for the
control point provided by employer.
a).Angel Measurement.
Two rounds of "face left' & "face right' reading on setting 0, 90,180,270
degrees, would be carried out.
3|Page
Method Statement for Setting Out
b).Distance Measurement.
Verify & the EDM/Total station and the stability of control point by making
a check distance from the originating to another knows control station.
b).Computation.
To ensure the accuracy of vertical construction, we set up the vertical control network.
Before the built of vertical control point, the survey should take a re-check for the
control point provided by employer, we can used these points only when their error
conforms to specification.
The Auto level will carry out a two-peg test before survey.
Back sight and fore sight distances should be kept equal as far as possible.
4|Page
Method Statement for Setting Out
All Structure points will be coordinated from the data of structural drawings and
setting out by the Total station from the well-established secondary and tertiary control
points.
Detailed survey setting out plan will be submitted after finalizing the details related to
Construction Drawings.
Level base point of floor should be laying off correctly to assure accuracy
requirement in vertical control. There should be 3 vertical points in every floor. Error
should not more than 3mm in checking around 3 points and using average value as level
Control base point. Paint a triangle mark with red paint and indicating absolute
elevation and relative level.
Laying off the +1.000 line on the wall and columns, the error should less than 2mm,
painting ink line and indicating level.
Figure 01: Checking of vertical alignment using Total station or laser plummet.
5|Page
Method Statement for Setting Out
Transfer of control points; setting up the laser aligner at the datum point of first floor
and adjusting it to collimation, then turning on the power switch. Target will be used in
receiving the light beam vertical with this points which sending by laser aligner at the
hole of slab. Center of a light circle in target as the transfer point upward.
Using Level machine can transfer Reference level (ex.1m level from SFL) to lift core
wall and after that using steel measuring tap will be fixed on reference line on wall and
transfer to levels for each upper floor. TBM’s at each floor levels will be installed
during construction stage.
6|Page
Method Statement for Setting Out
After self-check of Horizontal control network and setting out of every story has passed,
surveyor should report to Employer/Consultant to check obtain the consent to proceed
the construction work.
8 ANNEXURE:
7|Page
Method Statement for Setting Out
Traverse No
Observer
Recorder
Instrument used
Station occupied
Station observed
Horizontal Dis. 01
02
03
04
Mean horriz.Dist
0 , ,, 0 , ,,
Face Left
Face Right
Mean
Date: - Date: -
8|Page
ADJUSTMENT OF ANGLE SHEET.
D M S D M S
ADJUSMENT:-……………………
9|Page
Method Statement for Setting Out
TRAVERS ADJUSTMENT SHEET
Back
Line Coordinate Differences Coordinate Station
Bearing
Whole
Adjusted Horizontal
Station Circle Calculated Adjustment correction
LHA Distance
Bearing
Forward
Line
Bearing
Σ=
10 | P a g e
Method Statement for Setting Out
CONTROL SURVEY TRAVERSE
Station Back Sight Intermediate Fore Sight HI Reduced Level Distance Remarks
Sight
11 | P a g e
Method Statement for Setting Out
ADJUSTED COORDINATE SHEET
12 | P a g e
Method Statement for Setting Out
FRO
M
WE
LIG
AM N
A
TS 2
996.468 N
984.777 E
2.683 EL
RO
44 33 A
8 O
D
N
43 7
34
M 35 TO
42 MA
TAR
6 A
BU
ILD
MEP ING
BUILDING 36 LIN
E
41 37
O 8
N
40
39 38
M 7
9010 6
953.483 N
920.653 E
17
K 18
J
16 5 30
19
I
29
20
28
27
26
E
25
LIN
BU
21
24
H
23
ILD
ING
22
21
ING
20
19
18
15 4
17 14
LIN
16 13
ILD
G
15 05
E
04
22
03
02
01
BU
14 3 F
23
D
E
A
24
O
D
R
25
C
13 2 26
12
B 27
1 A
E
LIN
ING
MAIN BUILDING
28
ILD
5
BU
K
PO
J OL BU 4
11 RE
SER
VA
ILD
ING 29 9009
10 I TIO
N
RE
SE RV 3
9 H
AT
ION 30 919.391 N
976.810 E
8 G
7 F 2
CC 6 E 31
DL 1
INE
5 D 32
4 C
3 B
VEG
ETA
2 A
TION
LINE 1
9008
888.958 N
957.667 E