The document describes the sequence of operations for an automatic transfer switch (ATS) in different modes: 1. In normal mode, the ATS uses the transformer (TR) source only. If TR fails, it switches to generator (Genset) mode. 2. In Genset mode, the ATS runs the genset after confirming it is ready, and opens the TR circuit breaker after delays T1 and T2. 3. When TR recovers, it switches back to normal mode by opening the genset circuit breaker after delay T5, and closing the TR circuit breaker after delay T6.

Uploaded by

tien
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views6 pages

Sunlight-MOS For ATS

The document describes the sequence of operations for an automatic transfer switch (ATS) in different modes: 1. In normal mode, the ATS uses the transformer (TR) source only. If TR fails, it switches to generator (Genset) mode. 2. In Genset mode, the ATS runs the genset after confirming it is ready, and opens the TR circuit breaker after delays T1 and T2. 3. When TR recovers, it switches back to normal mode by opening the genset circuit breaker after delay T5, and closing the TR circuit breaker after delay T6.

Uploaded by

tien
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

MOS For ATS

THE SEQUENCE OPERATION OF ATS


AUTOMATION MODE

TR failure TR recover

Time delay T1 Time delay T4 Type Description Default set


(0.1 ÷ 60)s (0.1 ÷ 600)s
TR Transformer source Duty
End of T1 End of T4
Genset Generator source Standby

T1 Time delay to confirm 3s


Time delay T5 TR failure.
To run Genset AND Stop Genset
(0.1 ÷ 240)s
Ready T2 Time delay to open 3s
(Tg about from 8 to 15s) circuit breaker CB_T
End of T5
T3 Time delay to close 3s
circuit breaker CB_G
Time delay T2 To open circuit
(0.1 ÷ 240)s breaker CB_G T4 Time delay to confirm 30s
TR is recovered.
End of T2
T5 Time delay to open 3s
circuit breaker CB_G
To open circuit Time delay T6
breaker CB_T (0.1 ÷ 240)s T6 Time delay to circuit 3s
breaker close CB_T
End of T6

Time delay T3 To close circuit


(0.1 ÷ 240)s breaker CB_T
End of T3

To close circuit
breaker CB_G
THE SEQUENCE OPERATION OF ATS

NORMAL MODE GENSET MODE STOP MODE

Only use TR source. Only use Genset source.

Time delay T4 Run Genset


(0.1 ÷ 600)s Confirm Ready

End of T4 Ready

Time delay T5 Time delay T2 To open circuit To open circuit


(0.1 ÷ 240)s (0.1 ÷ 240)s breaker CB_T breaker CB_G
End of T5 End of T2

To open circuit To open circuit


breaker CB_G breaker CB_T

Time delay T6 Time delay T3 STOP


(0.1 ÷ 240)s (0.1 ÷ 240)s GENSET

End of T6 End of T3

To close circuit To close circuit


breaker CB_T breaker CB_G
THE SWITCHING FROM TR SOURCE TO G SOURCE

TR G TR G TR G
F1 F2 F1 F2 F1 F2

PLC PLC PLC


CB_T ATS CB_G CB_T ATS CB_G CB_T ATS CB_G

To the loads To the loads To the loads

1.The failure detected


3.The ATS send the signal to 5.The ATS send the
on the normal TR
run the genset and get confirm signal to close circuit
source.
ready from the genset. breaker CB_G after
2.Time delay T1=3s to
4.The ATS send signal to open time delay T3=3s to
confirm TR is failure
circuit breaker CB_T after time elapse.
to elapse.
delay T2=3s to elapse.

Total time = T1 +Tg + T2 + T3 = 9s +Tg


(Noted: Tg is time completed starting of generator after be received signal from ATS).
THE SWITCHING FROM G SOURCE TO TR SOURCE

TR G TR G TR G
F1 F2 F1 F2 F1 F2

PLC PLC PLC


CB_T ATS CB_G CB_T ATS CB_G CB_T ATS CB_G

To the loads To the loads To the loads

3.The ATS send signal to open


1.The normal TR 4.The ATS send the
circuit breaker CB_G after
source is recovered. signal to close circuit
time delay T5=3s to elapse
2.Time delay T4=30s breaker CB_T after
and ATS also to cut off the
to confirm TR is time delay T6=3s to
signal which for generator
recovered to elapse. elapse.
running (meaning go to stop
generator).

Total time = T5 +T6 = 6s


(Noted: The cooling down time of generator be setting at the generator side).