This document provides specifications for the fire fighting system for the Muthurajawela Tank Farm Project. It outlines requirements for water supply, hydrants, monitors, sprinklers, and foam systems. The key elements include: 1) Fire water will be supplied from basins through a closed loop main along the road enclosing the area. 2) Hydrants, monitors, sprinklers and foam systems are specified to protect tanks, pump houses, and loading areas. 3) Semi-fixed foam systems will inject foam into tanks, while monitors and sprinklers will protect other risks. Piping will connect to mobile foam equipment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
102 views

Eng Spec For Fire Fighting System Design

This document provides specifications for the fire fighting system for the Muthurajawela Tank Farm Project. It outlines requirements for water supply, hydrants, monitors, sprinklers, and foam systems. The key elements include: 1) Fire water will be supplied from basins through a closed loop main along the road enclosing the area. 2) Hydrants, monitors, sprinklers and foam systems are specified to protect tanks, pump houses, and loading areas. 3) Semi-fixed foam systems will inject foam into tanks, while monitors and sprinklers will protect other risks. Piping will connect to mobile foam equipment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 27

@ HecEc

Proj. Name: MUTHURAJAWELA TANI, FARM

Unit Name: 000


Grade of qualification : Certiftcate No. Document Pages
Class A A013 000 JS 1900 0l
100161 No. 1

E I\ GINEERTI\G SPE CFI CA TIO]\


FOR
FIRE FIGHTII\G SYSTEM
DESIGi\

CPC APPROVED
stcNATURG",..-
.-
DATE: oz-loslz,a"r-
I

0
A.F.C.
A.F.C
*k Z{e 2002-1-29

B TSSUED FOR BASIC DESIGN


Cai Wei Li Yao "1%
Peng Lei 2001i I l/11
CaiWei Li Yao Peng Lei 200t/7t22
REV DESCRTPTION PRE'D CHK'D APPR AUTH'D ROJ. MA DATE
MUTFTURAJAWELA TANK FARM PROJECT
A0l3 000 JS t 900 0l ES FOR FTRE FTI-ICTTNG SYSTEIVI I of I

Contents

I. GENERAL
2. CODES AND STANDARDS
........... I
3..FIRE FIGHTTNG SYSTEM

3.1 Fire Water Supply System


I
3.2 Water Fire Fighting System
2
3.3 Foam Fire Fighting System
3.4 Mobi le Extinguishers Foam Fire Fighting System
5
MIJTI.II.IRAJAWELA TANK FARM PROJECT
A0l3 000 JS 1900 0l
ps FoR FrRE FIHGTING SYSTEM loi5

I.GBNERAI,
This specification covers the general requirements for the fire
fighting facilities lor t5e
Project' The flre fighting facilities shall be designed
on the basis that there rvoulclbe onlv
one major fire at a time might occur in the project.

2.CODBS AND STANDARDS


Unless otherwise specified, the latest edition oIthe following
codes ancl standards shall be
applied:

NFPA I Fire prevention Code

NFPA l0 portable Extinguisher

NFPA l l Foanr Extinguishing System

NFPA l3 Sprinliler Sysrems

NFPA 14 Stanclpipe Hose System

NFPA l5 Whter Spray Fixed System

NFPA l6 Foam Water Sprinkler & Spray System

NFPA 20 Centrifugal Fire pumps

NIFPA 22 Warer Tanks

NFI']A 24 private Fire Service


Mains-outside prote*ion

NFPA 30 Flammable & Combustible Liquid Code

NFPA 196 Fire Flose

NFPA 194 Fire Hose Connections

3.FIRE IIIGHTING SYSTE]VI

3.I FIRE WATER SUPPLY SYSTEM

Fire water supply shall be taken from


the fire water basins.
MUTHTIRA.IAWET,A TANK FARM PROJECT
A013 000 JS 1900 0l ES FOR FIRE FIHGTING SYSTEM 2of 5

Fire water main in general shall be of closed loop design


and shall be located along the
main road, which encloses the area to be protected.

Block valves are provided to ensure water supply to any


section of the roop in case of
mechanical damage.

The description about fire pumps and fire rvater reservoirs


please see other part

3.2 Water Fire Fighting System

3.2.1Water Hydrant

(l) water hydranrs shall be provided along the area to be proteoed.

(2) The maximum distance behveen water hydrants


shall be 50-g0m.

(3) Each outdoor rvater hydrant shall have the minimum


discharge capacity of 945 lpm .

Flydrant will be strpplied with rrvo 2-l/2 inch hose


couplings and one 4 or 6 inch
connection for flre truck and one inret size
of hydrant is 6 inch,
3.2.2Outdoor Fire Water Hose Cabinet

(l) I-Iose cabirlets are installeci on the basis of


one hose cabinet lor every hydrant.

(2) Each hose cabiner contains n'o fire


hoses, one straight and fog hose nozz.leand
hvdrant
rvrench.

3.2.3Fixed Water Monitor

(1) The water monitors shall be provided lorprotection on the loacling gantry
area, diesel
tanks and kerosene tanks.

(2) Inlet size of fixed water monitor is 4inch.

(3) Fixed warer monitor shall be of hand_operated type.

(4) water nronitor shall be located at a minimum distance


of I5 merers away from the
protected equipment.

3.2.4 Fixed Cooling Warer Spray Sysrem

(l) Fixed cooling water spray system shall be provided


for oil tanks (TK-01-2I/TK-
MUTI.ILTRAJAWELA TANK FARM PROJECT
A0l3 000 JS 1900 0l ES FOR FIRE FIHGTiNC SYSTEM
3of 5

3l-38).

(2) Water application rate shall be as follorvs

Object Application rare

The shell of tanks 4 lprn/m2 of tank shell above liquid level

(Assuming tank is half full)

The roof of tanks 0.25m3 ftrlm1

(3) The cooling water system shall be activated


by manually operatecl valve with
signboard stating the purpose of the valve.

(4) The motor butterfly vaive wrth a signboard


shalr be activated by manually in local
and
removed from the contror room in the
Fire Station. The varve and signboard shall
be
located at about l5nt away from the protected
equipment.

3.2.5 Fixed lVater Spray Sysrems

(I ) Irixed \\'ater spray systems shail be provided


for the procr,ct pump house and
trans fer/circulation pump house.

(2) water application rate shail be 20


lpm/mr for the pump house.

(3) The motor butterfly valve with


a signboard shall be activated by
manually in local and
remote frorn the control room in the
fire station.

3.2.6 Indoor Fire Hose Cabinet

Indoor fire hose cabinets will be supplied


for the Administration Building and Maintenance
Workshop.

3.3Foam Fire Fighting System

3'3' lSemi-fixed top injection foam


fire fighting sysrem shail be provided for oil ranks
(TK-
0l-21lTK-3 t_38)

(l ) Discharge rate: 4.1 lpm/m2


NlL]-IHLJRA.IA\\'EI-,\ I \\K I-,\It\I I)RO.IE(''[
A0i3 000.1S 1900 0l ES FOR FIRE FIHC llNCi SYSTEN'I 4o['5

Operating tinre: J0 minutes

(2) Two discharge outlets shall be slrpplied lor each oil tank.

(3) The piping for senri-fixed loanr systenr shall be tenlinate on the outsicle of the bancl

rvall connections sLritable lor e.risting nrobile fbant fire lrghting equipntent.
"vith

(4) The dry piping and fitting ri,rll be carbon steel.

3.3.2Fixed Foam/ Water Spray Systenr lor Loading Gantries

In gantry, a fire foam-proporlior-ring ur-rit is designcd to supply 37o foam solution to the risk
area. The firervater will drive a Pelton rvheel, which is direct coupled to the foanr putlp;
the foarn concentrate will then be pumped from a tank, to a Balanced Pressure Propofiioner
(BPP). The foam solution that is generated at the BPP is then discharged to the risk area. A
sprirrg-loaded diaphragm valve nraintains the percentage of the loant solution depending
on the incoming firervater pressllre.

Capacity of foam tank shall be detenrined based on the discharge rate of 6.5 lpm/mr and
disclrarge tirne of l0 rnirrutes.

(l ) Fixed foant /rvater spray system shall be installed lor trLrck loading gantries.

(2) Foarn /water spray systenr shall be operated by motor valve for both local and
renrote operation.

(3) AqLteous filnt fon'r.ring foam rvill be supplied to foam spray systenr

3.3.4Air foam concentrate

Air foant cottcentrate shall be supplied lor foam bag tank. spare reqr-rired and storage as
follows:

(1 ) Air foarn concetrtratc storagc art fire statiorr


Air loartt coltcelttrates shall be storccl at the fire station by air fbant trailers and air fbant
tattks. Storagc capacitv shall bc dctcr-nrinccl basccl olr thc lollouing conditions.

ll ()nc lrotrr Lrnintcrr-Lrplcrl lirc liuhtrng firr tlrc largcst lotll'tanli.

i, \'.\. rlrl.ilt i,,.rni\()il\-rrtl'.rlr lr ,', l(it,..:,,1'-l I l|111 11,lol lrtlr.rirl -rrtl,t,.,


MUTFIURAJAWELA TANK FARM PROJECT
A0l3 000 JS 1900 0l ES FOR FIRE FIHGTING SYSTEM 5of 5

c One hundred percent extra as spare.

(2)Air foam concentrate storage at loading gantries

Air-foam concentrates shall be stored in pressure proportioning tends adjacent


to the truck
loading facilities to be used as foam water spray systems or
foam monitors for the
protection of the loading gantries.

capacity of foam tank shall be determined based on the discharge


rate o16.5 lpnr/m2 for
fixed loam water spray systems and discharge time of r 0 minutes.

3.4Mobile Extinguishers

3'4' lPortable Dry Powder or Co2 Extinguishers will be


supplied as follow area:

(l)Tanks Areas, Tnrck yard , pig Receiving Station,


Gas Station, Gantry,.A,,rea , Motor
Cycle Park, Car parking ;

(2) Transfer/circtrlation Pump Flouse, M.c,C , Tank Farm Conrrol Room, Fire Water
Punlp House , Substation , Product Pump House, Maintenance
rvorkshop, |vlaterial Stores.
Gantry Control Room;

(3)Aclrninistration Builcling' security olTice,


Rest Room for Dril'ers, Control Roonr [or
Exit, Fire Fighring Station.

3'4'2 Mobile foanr Extinguishers will be supplied as follow


area: rhree supplemenrary
foam hose streams shall be avai]able lor each oil
tank
l^ Proj. Nanre; lvlt.rTF{UR\JAWEL,t
-[.\\K Ir,\li\,I

I
@ HecEC Unit Name: FIRE IrIGH-llNG SYSTE\l

Grade of quali flcation Certificate No. Document l) I:la.


01
:

A0ll 000 CN 1901 i

CIass.\ 0016 No.


I
I r

o lt.
I Lf \'"
,:)\s

I
t_? CAI-,CLILATIOI\ SHEET
I FOrt
I TOTAL FIRE WATER
I REQUIITEMEI\GT
I
I
.., ril \
" 't-'-
"''1 r, '--
;^.^t
A
" .r.l[":
I i
i :i- .'

o:AUGzitfi1

I , Cl'i,---t.t*rlr.'i

I ^>---^.^
' t
-..--:'
-1..!-

I
I DESCRIPTION PRE'D I Csr<'o .\PPR l.^rrr,'oinno, \r \\: :) \ i'
l^
il
IvIUTHLI IL-\ J,-\wE L A Tr\N K FARM PROJECT
Aoli 000 cN lc)01 0l cN FOR FIRir FItlGl'lNG SYSTEI"I I ot'l

I Contents

t. FLKED FIR-E U/,\TER FOR TI-IE FIRE lANK

?,. FIXED FIRE \\l-\]'ER FOR TI-tE COOLING OF'lt-lE NEr\RBY I--\NK

J. FIRE w',\TER. REQTJIREVIENT FOR-l-l-lE FIRE r-rYDRANT . ..

I
I
+. TO'f.\r. FIRE \r..\TER REQUIREVIEN-| FOR COOL.ING
i FOII FrXED FITTF FO..\lvl SYS-l-Elvl
I
6. [iOR NIOBILE I]O"\N[ SOLUTION

l^, 7 TOTAL $/i\TER REQUIREVIENT FOR FOAIvI SOLUTION. . . ..

8 TOTAi W.\TEII REQUIRVIENT FOI{ FIRE FINGTING SYS'TE\[.


I

J -i
I

I
t
IVIUTI-IU ILAJ.\WE LT\ TANK FARM P ROJECT
A0ll 000 CN l90l 0l CN FOR FIRE FIGI-ITING SYSTEIvI lo[]

The largest t'ire contingencv mav occLrr in the tank area. The [rre tightint svstem shlll
Itssttrc enouqh thc mtrimttm erpectecl \r,'ater demand. Corresf,,'.,ndin.l tn (',.n(tr,'.:'rr
operation ol the lareest cooling rvater sprav system ancl the two adjrcent one:j. plLrs threu
tlres rvater hy drant:;.

I.FIXED FIRE W ATER FOR TFIE FIRED T,{NI(


(.)1=Sshell x q I

__1t2 r DI-lql
-1t2(3 14 x 3I r 15)4x 60/1000
=2e20.2X60/1000

- i75.21 mr/h

2.FIXED FIITE W'ATER FOR TIIIi COOLING OF TFIE NEAITI]}'TANI(

c.)2.shell: i.6Dia

= i.6xil
. -19.6 *:,r1.t

(.)l.roo[:Sroof x 0.25
il^
| -l , RFIx0.l:
-.1 r l.i-l x ii x 4.16 x 0.15

. 101.5 rrr/h

3. FII{E I.' IGIITINC SY STIIN{


I llre hvcirants are considered
tJ-i:94-i lpm x 3

I ..,56.7 x i
=,1 70. I mj/h
I
-I.T0TAL FII{E W.\TER IUiQUIRENIENT FOR COOLING

I
ffi
l#ilf,
Fdl:s
tvtllt"il[.IR,,\JAWIILA TANK Fr\RIvl PROJEC-I
.'\0r.'] r)00 cN rq01 0l cN. FOtt FlllE FIcl-iT-rNG sys-rEM rot.l
Q4=Ql+202+Q3

F:ilri
M,ll =175.22+2 x 252.1+170.1
ir*{
&)ift4

=849.6 m3/h
ffi
5.fOR trtXED Irtitli FO.\lvt S1/S.tEM
Flri
r,1$ e5=Ssurface x q2

ffi _1t4 l D2 qZ

ffi =,.U4x 3 14 xg6lx41 x 60/1000


FIll t
' =185.6 mr/h
His
iH
6.IIOR \4OI]ILI FOANI SYS"TEN,I
r$
i,,r etj=190 lpm x 3 x 60/1000

H
ili
=34.2 nf lh

7.1.O]..\.[- wATIIT RIiQI]IIIEMENT FotT IIoAI\T SoLTITION


ffi
Q7=r.Q5 +Q6) x g7%
Int

h{
fiil

=(185.6.13 4 2) x 97%

ryL ' :)1,),)rn3th


Elv.Eill,'i

8.1'O'f.\ r, \,vAT'r|R TilIQUIIIEMTINT FOIi


ffi F.IRE FIGHTING
'-)total=Q4 +
Q7
ffir
H
.849.6+213 2

=1062.7 m3lh

t:,
*l t-he total
s water requirement for fire fighting is 1100 m3/h

H
u
11

)..
t
t- HQCEC
Proj. Name; MUTi-lUR\JAWEi,A
-l-
\NK rj,/\ R\,I

FIRE FINGTING SYSI-F]\t


I Crade oI clrralilication : errificate No. :

Class A r00161
i
^lt .

I
,i\

i i" ()'

'\)'t'

I
i CALCULATIOI\ SHEET OF
I WATER AI\D FOAIVI CAPACITY
I FOR.
I FIR.E FIGHTIT{G SYSTEM
i
I
T

I
I
t
I -
-l- ^)Lrrv
-

I DESCRIPTION PRO.I
--.

\I \\ I) ' Ii

I
f,
MUTHURAJA\\'ELA TANK FARM PROJECT
I AO I 3 OOO CN IgO I 02 CN. FOR FIRE FIGI-ITING SYSTEM toil

I Contents

I FO..\it'l SYSTEVI CALCULi\TION FOR TK-O1 - I I TANKS ... ..

] Wi\Ti:R SYS-TEiVI C.\LCLIi.\TION FOR TK-OI-I8-I.{NKS .. .

I FOi\NI SYSTE\,I C.\I-CULATION FOR TK-19-ll T{NKS


-t \\,ATER SYSTEIVI CALCULAIION FOR TI(-1q-2I T.\NKS I

j FOr\itt SYSTEI,I CALCUL,{TION FOR TK-31-i8 TANKS

6 wAIER SYS'IEM Cr\LCLiLATION FOR TI(-i l-18 TANI(S . .. . .. (,

7. FOT\Ni SYSTEM C.\LCULATiON FOR TI-IE GANTRY AREA

8 \\,l{lErR SPR\Y SYSTEIvI FOt{ TR{NSFER/CIRCIJLATION PLiNtP HOIISE

i 9 \\,,{TER SPRA.V SYS'IEIVI FOR PRODUCT PUiVtP HOUSE i,)

l^
I

I
I
i
I
a
MUTHLIKAJAWELA TANK FAfuVI PROJECT
I A013 000 CN l90l 0l CN. FOR FIRE FIGI-ITING SYSTEVI I ole

l^' I. FOA}t SYSTENI CALCULATION FOR TK.r)l*18 TANI(S

I THE TANK DET"\ILS ART

I Tank NO. TK-01- I 8( flxed dome roof'trrrk )

Proriuct Stored Diesel


I Specific Grar ity 0.81 to 0.9 g/crnr d 16

Flash-Point >600c
I Tanl: Diameter ii nteter ( treight I 5 metcr )
Desrqn Pressure , -5 bar( available at TPS)
l_ Foarn Concentrate Filouprotein loam

I a) Fuel sLrrflace area = I i4 x D:


= l.14 x l1r/.t
I = 754.:l m:
b) Nlintntum [oant solution application rate: surthcc- area x 4.1 litres/ minlnrr
I =754.4 X 4.1
:i09i.04 litres/ min
I = 185.58 mr,{r
c) Top pl)Lrrer sets (-fPS) selection

I For r tank,,vith a ilm diameter. r\ minimLrm tr.vo loam inlets are required.
Cap,icitv per fPS : 1093.04/2

l^ l<,lA O^ lit'.o.i
= I -' .V.V-

=92.77 m'lh
.r.,""
-i^
,,,r,,

I d) Sy'stern operating time


Refcr to [oanr svstenls spec.no. l\r{-07. The minimum time is ]0 nrinutes.

I c) Foam c(rncentrate reqrrirement


VlinimLrnr loant concentrate requirement: actuiti foam solution [lorv rel. \ inrlrrctirrir

I rate \ oneratins time: l0q4 litres/ min x 39/o x l0 min


= 1785 litres

I ;\dil a nominal i9,o Foam in line =1.03 x 2768 litres

= 2868 litres

I
I
t
MUTHI IRAJAWELA TANK
I A0ll 000 CN 1901 0l
FARIVT PROJECT

CN. FOi{ FIRE FICI-ITING SYSTEVI I ole

I 2. wAl'ER SYSTEIVI CALCUL..\TION IrOR TK-O1-lU TI\NKS


TI-IE TANK DETAILS ARE:

I
Tank NO. lK-01- i 8 fixed clome rool tank

t Prorluct Stored Diesel

Spe,:ific Gravit;- 0.81 to 0.9 q/cmr iit i6


0C

I Flash-Point >6OoC
Tank Diameter ,l1 meter ( heiuht i,i rnercr )

I a). Fixed fire rvater lor the coolinq olshell of the frrecl tank

t el=S,n",, x q,
=ll2 nDI-i xql
=v2(3 14 x 3l x 15 )x 4 x 6ollooo
I
=7i0.05 r 4 (lpnrt x 60/1000
=2920.? (lpm) x 60/i 000
I =175.?2 (mr/h;
b).Fixed fire water for the coolin_c olthe nearby fire tank
I
Ql,oo,.=S "ni x 0.25 mri h

I t; . ,ilil::;l i;'l 0 25 m ih
x 025 mr/h
I =13] ?;

l^ x=: I ,1,io,,,,
-tt
r.tl rrrlrrl

I =-. t:'t-rri-'
I ?.::;:i:':;:1::l'J::::il:l::T:1il,:';::: ::i, ,em ,, ,,espr:

I ];T:;:l:::,':i:1'::r;:i::,:::'ff:,^"T:;::.':,[ il'::]:::,,;:.:::
of tank shelt be (1.6 x diameter oIthe tank). ivfi/hour,, .then.
I Q:,u",,=l 6xDia.
=1.6xil
I =-i9.6 n ''lt

I
il
I MUTH{ IRAJAWELA TANK F,.\RM PROJECT
,{013 0()0 CN l90l 02 CN FoR FIRE FIGI-lrlNG SYSTEIvI I of'e

t^ 3. Fo,\M sysrEivr cALCULATIoNT FoR TI(-19-21 TANI(s


TI-[E TANK DETAILS ARE:

t
Tanli NO. TK- l9-21 fixed dome rcof tank

t Procluct stored

Spe,;ific grar itv


Kerosene

0 78 to 0.8-{ g/cmr 8 t6'C


I Flash-point >lg(,c
Tank diameter I I rneter ( height li nreter')

I Design pressure
Foarn concentrate
5 bar( available at TPS)
Fluoroprotein toam

I area = n /4 x D:

t
a) Fuel sLrrface

I ;,:_;;1,,_
b) Vlininrum fo*., ,ot*ion application rate = surface area x .{. i litresi min/nrl
I

I -lop
:filJ i,,1.,,n,,,,
= 185.58 mr/h
c) p()Lrrer sets (T'PS) selecrion
I r tank rvith a i 1m diameter.
For r\ minimLrm trv'o loam inlets are requrrecl
Cap:icity per TPS = 3093.04t2
I = 1 546.02 litresi ntin.

I ^' ^''n
d) S,vstern operating ,.rrlZ"'
vr-07 rhe minimum tinre is i0 rnin'lrtes
I ., ,."1:i':i:.T.l,l,:;r,.:.::o
soiL ra'lc \ inc'iL c'i"
I ,^,. ::::ll:.Jffi':'l;;j'i:JT[::;: ; ;':i"'[oam
'lio ': 'ori
,

: 1785 litres
I
i\dcl a nominal i% fbam in line :1.0i r 1768 litres
I : 1868 litres

I
I
t
MUTI.IUR'\JAWELA TANK FARM PROJECT
I, AOI] OOO CN I9OI 02 CN. FOR FIRE FIGFITING SYSTEVI I o[9
t.wATER sysrcM cALCULATToN FoR T'K-1e-21 rANr(
l^
TFIE TANK DET.\ILS ARE

I
Tank NO. TK- lq-ll fixed clome roof tank
ProdLrct stored Kerosene
Specrfic grar,'itv 0.78 ro 0.8-l e/cmr ,d,16rc
Flash-point > ISoC
Tank ,,iiarneter II rnetcr ( height 15 nrerer )

I
a).Fixed l.lre rvater fbr the cooling of shell of ttre fired tank

a l=S.,,",, :i q,
I =llZ nDI-l xql
=t/l(i.l.rx lx15)x1x60/1000
I =7i0 05 r 4 (lpm) x 60/1000
I =lq20.l rlpm) x 60i 1000
I-
- =17_i.:2 tnr,/h)

ir
b).Fix firc Water for the Cooling of the Nearb,v Tank
al,,,nr=Sn,,, x 0'25 rni/h
II
-l n Rt-ll x o.li rnj,h
=l x i.l.t r il x-1.15 x 0.25 mr,ft
I
I =801.9? x 0.25 mj,h
- =l0l. l 4 rrr "h
I^ o=;:ir m

_
I
FI:R_ J Rr- rDll;:
I =jr-,lr:-(]r,r):
=-1. I i ni

I .).Fixed lire water for the cooling of the nearbv flre -[ank
,\ccordinl to the'fencler l)ocument. Spec.NO.lv{-06.pase q of ll. Itertr i3.0.rhc s1.tu
I ,)'stem slrrrll be split to enable w'ater spravs to concentrate lvater on tlie tank sht:lls exposr:rl
of fire flrorn adjacent tanks. The minimum lvater rate fbr cooling of half'the circrrprtcrencr.
| "[
tank shell be ( 1.6 x diarneter of th tank). IVI]/hoLLr,, .then.

ar.sherr=1.6 x Dia.

I =1.6 x il
=49.9 pprzlr
^
I
I
I MUTI-I LIRAJA\\'ELA TANK FARVI
A0l 3 000 CN lq0l 0l
P ROJECT
CN. FoR FIRE FIGI-IING SySTEt"t i ot.e

tL 5. Fo \,vI sl'srEry'l CALCULATION FoR TI(-31*3g T.\NI(S

I
THE TANK DETAILS ARE

Tank NO
l-i8
t Product stored
Spccific gra,,'itv
TK-l
Diesel
trxed dome rooI tank

0.8i-0.90 g,/cmr tA l6')(.


T Flash-point >600c
Tank diameter 12 meter I height l-{.6 me ter )
Design pres.sure
; 5 bar ( available at TpS)
Foam concentrate FlLroroprotein loam

;
a) Fuel :illrface areA = n i-l x Dr
= l' 14 x l2ri'l
I : i79.9-l mr

t
b) NtinirnLrm loam solution application rate : surface area x 4.1 litresi min/ml
=179.94X 4.1 litre.s/ min/mr
=t557.75litres/ min
t
:9i.46 mr/h
c) Top p,)Lrrer sets ('fpS) selection
I
Frorn vi-07 'For a tank rvith a l2m diameter. a
minimum trvo f'oam iniets arc reqLrir.ed.
Cap;rcity per TpS = t557.76t?
I
=778..B8litresi min.
=J67m,,tr
I^ cl) System operating trnre

*t'ot to loam systems spec.no. lvl-07. The minimum


rime is i0 minutes.
|| .
c ) f oarn joncentrate re.ltrirement

I ,,,. li;I:;JI"::"XJ, :,;l,Jil:'-):'::,,:il


so'u, on ,'or' ra,e x indL c,i.,

: ll0l 98 titres
I
r\dd a nominal 19,i, tbam in li,e:1.0i x l40l.9g litres
: l-i44.04 litres

I
l^
I
d
r\Jr\WI]L,A'fr\NK FA RM PROJEC'I
i\41.rTt'l f ' [(
H
-\01 3 0()0 cN l90l 0l cN. roR FtI(E FIGI.I'IING S YSTE iVI 6 of 9

6. W.\'f I.]It SYSTIiNT CALCUI,.\TION IIOI1 TI(.3I-38 TANI(S


.IIiE -IANK
DETi\II,S AIII:

]hnl NO. TK -l I -3 8 fl xed dom e roo [' tan k


[)rorlrrct storetl Dierel
SJrer ilic gravitv 0.83-0.90 g/crnr !., 1r, ''C
ilaslr-point >600c
-Tanl,
diameter l2 nreter ( heighr 14.6 rrreter )

r). I ixecl ilre rvater ibr the cooling of shell of the frrecl tank
H
(] l-=S.,,",, x c1,
H*
=lC rl)i-l rql
:t/2 (3.1,l. x ll x 14.6 ) x.t x 60/1000
=504.28 i 4(lpm) r 60/1000

.l
lC I : I i(lirrrr) .rr 60/l 000
,= [2 I .0i (m]fh;
l;).Fixed flre water {or the cooling of the nearby flre tank

Q2n,n,=S,,.,, x 0.25 mj/h


:2 ir RI tl x 0.2i mrih
..1 x l.l.,l x 22 x 2.95 x 0.25 mr/lr
=ll\J.2lr, 0.25 mj/h
=101.80,nr/h
I{=D=2 1m
[r
I-l=R- v',l.'r-(D/2)r
_=il r1J 71 17rrl
't7 _: -\_:t ! I
,="). ( li lI
c).Fix f rr rvater l'or the cooling of the nearbr, fire tanl<
-fencler
'\ccordilr.I to the Document. Spec.NO.lvt-06.page 9 of ll. Ite.r [2.0 the spr'
s),sl.ent sl rlll-be spJit-t
ii
trl'llt'c ll','tI acliacent tattk.;, "l'he rninimum rvater rate tor coolinq oI lralIthe cirr:rrrnIcr.rr,,,,
ol'tanlt slre ll be ( 1.6 x cliamerer of th tanl<). M j/hoLrr', .then.
ffi
it (lt,r,"tt='I rr x Dia.
..1.6 x l,'
-.r-). 1lI-I h
N,IUTFIURAJAWE L,T\ TANK FARIV{ P ROJEC.I
AOlJ OOO CN I9O1 02 CN. FOR FIRE FIGI-ITING SYSTEM 7II[9

7. FOANI SYSTE}I CALCULATION FOR CANTRY .\RIiT\

TFIE CANTI(\' DETAILS ARE

Cantr', NO. L.\-0 1 Ai BiClD (Lr\-01l0ii0-li0 j )


Deal '.vith material Kerosene . Diesel

Specilic graviti' 0.78 to 0 81 .0.8i-0.90 slcmr 'a l6 rC


F Iash- po i nt >i80c.>600c
Each uantry diarneter Length 9.5 meter (with lJ.6 meter)
Take protected area Three gantries

a). Foanr soh.rtion lor the foam/water spray system of the fired gantrl'area

Ql=S x,1,r 1.3

=LWxq,x1.3
=l-l r 9.5 r 6.5 r 60/1000 x l.l
=ll8 x 6. i (lpm) x 60/1000 x l.l
=1482 (lpm) x 60/i000 x 1.3
= gg.g2 (rnr,,h) x l._l
=Il6(mr,'lr)

b). Foam ;olution fbr the foam/rvater sprav system oIthe nearby ilre qantrv arer.r

Q2:S, x .m''rh
=116 x i rnrh
1,r
=J+5 m 'l'l
:348 x 1(t0976, ,rn', n

I =5800 l/nrin

-fotaI
I c). loam concentration [or qantrr,'area

Qj-Q] \ joo ntt/h x T

I =l-18 x -1"'o m-t,ih x l0 min


:10.+-t rn'ih x 1000i60 [/min ri0 min
:17.{ limrn x 10 min
I
=17.10 I

I
I
,ILITI.IL'R-AJAWELA TANK FARVI PROJECT
I cN l90l 02 cN. Fotl
'\0li 000 FIRE FIGHTING SYSTEIVI 8 olo
^ 8. wATliR spRly.sysrEilI FoR TRANSFETv cTRCULATToN puivrn Frous[
I
TI-itS Pt.iMP I-{O{iSE DETi\ll,S ARE

Pum p NO. P-0 I Ar B. P-01.\/B

ProclLrct storecl Kerosene . Dieset


Specific sravitr' 0.78 to 0.84 .0.83-0.90 gicmr ?t 16 'C
Flasir-point >j8oc.>60cC
Each pump size Length 1.4 meter (wittr 0.6 nreter)

Water capaciry fbr each pump


I ^).
Ql=S x c1,x 1.3

I -,tl--r'l ,f , uo,,ooo x r i
I =?;]]il\::il:il:i';.''
I =lifl:ilh)r
3

I o). Total rvater capacity for overall pump


O-=S, r I m'/h
I = ar, - .r mj/lr
=5.14 n'/h
t-
I
I
T

t
t
I
d
vrurr-iuRAJAwEr-A T,\NK FARM eRoJECT
I AO l 3 OOO CN I9O I 02 CN. FOR FIRE FICFITING SYSTEM 9 OI9

9. Wi\TER SPRAY SYSTEIVI FOR PRODLICT PUMP HOUSE

I THIS PUMIP I.{OUSE DETAILS ARE

I Purnp NO.
Proflugl storecl
P-0lr\/p.p-01A/D
Kerosene . Diesel

t Specific era'ity
Flaslr-point
0.7g to 0 g{ .0.9j-0.90 gicmr 0r 16 'c
>jgoc . >600C
t Each pump size Length l.-l meter (,"vith 0.6 nterer)

I a). Warer capacity for each pump

Ql=Sxc1, xl.3
=LWxq,x13
I
=1.4 x.rj x l0 x 60/1000 x l.i

I =0.84x 10 (lpnr) x 60/1000 x l.j


:168(lpm)x60/i000xt3
=1008 lmrlh; xt3
I
= 1 .3 1(n:r/h)

t b). Tbral w,ater capacity [or overall pump


Q2=S, l0 mi/h
:<
I
=l.i1xl0mr/h
=16.1 nr''h
I_
I
I
I
I
I
l-
I
Jlirtlc
e
o [-
HQCEC
cprali fi cation Cerlificate No:
Proj.Name: MUTHURAJAWELA TANK FARM

Unit Nan-re: 000

Document Pages
A013 000 EL 121
Class A 01 001(r I No. 5

EQUIPMENT LIST

(FOR FIRE FIGHTING SYSTEM)

r\S Ilt ill..l'

I)ES('tt IPl'lON
tv
fr

tL
F
a
FI
JA
,-
!r
F.Z
ZD0r
tr]
t5
2
It
lr
:)
a
ri

ITE'i
7.
\\E -
il+{ /.i:'
.d+-
Hz !
a
$l'J
.rr
'/.

+= i
tffi':
n(z
lH.ll
ni =
lJ=
-
&:
v
tl
A
tu
-
(a
tt
JA,x
tl
E-Z
ZD
El r{
t-
2.
x
;)
t^)
r-l
-
a:

IIE Y
J.t
\sl 7. Z
E :F
nH{ x J
H(r 7
Hi I
I
$l . T
:Jl

-s:
:I
7

ffi:
n(z
[lfl]
*a =

,#.
w
tlE
A
t#
F
a
x
Jr.'-t
FZt-
ZD
fC or
<r
a
H
D
i)
Id
d
f,=? I
ilu:
\nt z.

trrH s a
H(+ a
Hz -'a
$t'a
-*J :
+j
ffi':
fi(7
t}+il
*a =

ffi
rr'
-
t{r
F
a
-JA
--
F.Z
ZD
lJl *t
!-r
2
l*i

a
=
kl
i
IlE i Z
\sl
trH{ =
T
#/
.,J
ta7 -
$l'J T.
-r
|J=
+r
tK.:
fi4i
iEil =
'H- a
;
;@"
w

You might also like