BSBPMG532 Assessment 2
BSBPMG532 Assessment 2
1.
Describe at least three
The CEO has advised of a strict budget of $11,000 for this project,
objectives for quality
with no variances allowable. The budget is based on estimated
management for the project. costs.
2. A key aim is that customers are attracted to the web site and find it
easy to use.
1.
Describe at least 10 quality
User-Centricity. At the end of the day, usability and user
standards for the project.
experience hinge on the preferences of the end-users.
2.
Fast Loading because no one would like to wait a long minutes for
the website to load. Design sites with prompt loading times for all
users on all devices.
3.
The website can be used on the mobile which is ready to use
because everyone uses smart devices on a daily basis.
5. Social Media: the various social media way that customer can use
to link their account to the website, and the different platform.
6.
Strong Security, every design should include fundamental security
and privacy protocols, such as basic security checks, to protect
client and user data.
7.
Site visitors are always in a hurry. User Experience (UX) plays a
key role in helping visitors use, understand and stay on your
website.
8.
Fresh, Quality Content. Be succinct, interesting and new. Use
language that makes sense to the audience such as avoiding
jargon, corporate speak and acronyms.
9.
Navigation has a huge impact on user experience throughout the
web. Good navigation will make it easy for visitors to find what
they’re looking for while poor navigation will frustrate users.
10.
Quick response and feedback for the website visitors.
1.
Describe at least 10 quality
To facilitate the delivery of the project and within budget which is
standards for the project.
$30,000 to be varied according to project requirements and with
successful achievement of the Project Objectives as defined in the
project charter.
2.
To ensure that the project management methodology is adhered
to, and all key processes involved in project management are
undertaken effectively for the project following the social media
policy and digital advertising.
3.
Project deliverables are efficient, effective and meet the
requirements of all project team and stakeholder members.
4.
Major stakeholders are satisfied with the final project outcome,
especially Hong Kong, Singapore, and Japan people.
5.
Enduring and consistent performance in International market
conditions.
6.
Customer experience. Requirements that make a product or
service more pleasing to customers such as understand the
content with the local and English language and easy to access to
the social media content.
7.
The availability of a service that provide the multi-media in
everywhere within these countries and many language to use.
10.
Customer service requirements such as the practice to provide
information to access to website, function of the website, and other
information. (all in English and if it's possible in dialects. )
Head of web designer and Marketing Manager have input to finalise
Use stakeholder input to
quality objectives and standards.
finalise quality objectives and
standards. The appropriate and the quality standard
Who provided input for the A commitment to requirements and continual improvement
quality objectives and Provides a basis for establishing and quality objectives
standards? Communicated and understood within the organization which is
training or inform all information about the web design in English
What input did they
Periodically reviewed for suitability
provided?
Appendix 3 – Quality Management Plan
PROJECT 1: Web design project
Develop a Draft Quality Management Plan
Purpose
To ensures that the requirements are met. Its purpose is to ensure the
quality of the project’s deliverables meet the acceptable standards as
well as stakeholder’s expectations. It does this by specifying the quality
standards the deliverables must meet and the actions that will be taken
to get there. This ensures the maximum quality of the deliverables and
the minimises the cost of poor quality.
Quality objectives
The budget set for this website developing project is $11,000.
There cannot be any variances to the total cost of the project.
Quality objectives
1) Develop a new website to meet organisational growth objectives
Head of web designer who is the person managing all the design of the
Quality roles and
website, function, and the language use.
responsibilities
Marketing Manager who has responsible in creating the content , advert ,
and the application that should use to attract new customers
The last thing is evaluate and assess the result of the project.
Scatter Diagram - Scatter Diagram is a quality management tool which
Quality methods, techniques
helps to analyse relationship between two variables. In a scatter chart,
and tools to resolve quality data is represented as points, where each point denotes a value on the
issues horizontal axis and vertical axis.
TQM in the International market with all activities and tasks needed to
Quality control and
maintain a desired level of excellence within a business and its
assurance problem operations. This includes the determination of a quality policy, creating
reporting and implementing quality planning and assurance, and quality control
and quality improvement measures.