This document provides instructions for installing wooden floor supports and panels. It lists the necessary supplies, equipment, and tools. The procedure involves 10 steps: 1) estimating and ordering materials, 2) preparing the subfloor, 3) allowing materials to acclimate, 4) laying out placement, 5) attaching the first row, 6) cutting and fastening successive strips, 7) ripping the final row, and 8) sanding and finishing. Trainees will be assessed through demonstration and a performance criteria checklist.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
98 views

Floor Support

This document provides instructions for installing wooden floor supports and panels. It lists the necessary supplies, equipment, and tools. The procedure involves 10 steps: 1) estimating and ordering materials, 2) preparing the subfloor, 3) allowing materials to acclimate, 4) laying out placement, 5) attaching the first row, 6) cutting and fastening successive strips, 7) ripping the final row, and 8) sanding and finishing. Trainees will be assessed through demonstration and a performance criteria checklist.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

TASK SHEET

Title: INSTALL WOODEN FLOOR SUPPORTS AND PANELS

Performance Objective: By the given task, the student must perform


how to install wooden floor supports and panels

Supplies/Materials : Fabricated door and window jambs assembly ,


Fabricated door panel, flushed (0.8 m x 2.1 m) , Nylon string (10 meters),
Pencil , Loose pin hinges, 4” , Finishing wire nail, 1”, Finishing wire nail, 1½
inches , Finishing wire nail, 3” inches, Common wire nail, 1”, Common wire
nail, 1½ inches, Common wire nail, 2 inches, Pulley, 4”, Nylon rope, 1” dia.,
Bolo

Equipment: Compressor , Paint Mixer with hand drill , Sander/sanding


machine , Scaffold H Frame , Ladder , Railing system , Spray Gun ,
Swivel Gun and Airless Spray

Tools : H-frame scaffolds system and accessories, Portable electric drill


(variable speed), Portable electric planer, Circular saw/jig saw with vacuum
with vacuum

Steps/Procedure:
Door Jamb

1. 1. Estimate and order the materials you need.


2. 2. Prepare the subfloor and fasten asphalt-laminated kraft paper flooring
underlayment to it.
3. 3. Deliver the materials to the site and allow them to acclimate to the room’s
humidity.
4. 4. Layout and mark the placement of flooring.
5. 5. Attach the first flooring row to the subfloor.
6. 6. Cut and fasten successive flooring strips.
7. 7. Rip the final row of flooring and fasten it in place.
8. 8. Sand and finish the floor (unfinished solid flooring only).
Assessment Method:
Actual demonstration , Performance Criteria Checklist

Performance Criteria Checklist

Trainee’s Name: _________________________________ Date: ___________________

Criteria YES NO
Did …
1. Prepare the tools and equipment?
2. Wear PPE?

3. Estimate and order the materials you need.

4. Prepare the subfloor and fasten asphalt-laminated kraft paper


flooring underlayment to it.

5. Deliver the materials to the site and allow them to acclimate to the
room’s humidity.
6. Layout and mark the placement of flooring.
7. Attach the first flooring row to the subfloor
8. Cut and fasten successive flooring strips.

9. 9. Rip the final row of flooring and fasten it in place.

10. Sand and finish the floor (unfinished solid flooring only).

Comments/Suggestions:

Trainer: ___________________________________ Date: ___________________