Chandrinalla Dam
Chandrinalla Dam
Lat: 22⁰-04’-11”N,
Long: 84⁰-44’-55”E
The proposed Chandrinalla Irrigation project is proposed near Gailo village in Lathikata Block of Sundargarh
District. It is a reservoir based project proposed in the Brahmani Basin across River Chandrinalla, a right tributary of
river Brahmani. The catchment area intercepted at the dam site is 121 sqkm and the entire area lies within the
territory in the state of Odisha.
Assembly Constituency: Rajgangpur
Cost: Cost of the Project - NA
Benefit:
i) Irrigation -5000 ha.(CCA) (15 nos of villages of Lathikata block of Sundargarh District)
Annual Irrigation-5760 ha
ii) Water Supply(domestic): 183.6 ham for 50000 nos. Of population
iii) Power Generation: Nil
Total Land Involved in Project (ha):
Type of land Submergence Area Distribution system Total
Forest land 40.90 NA 40.9
Govt. land 84.61 -do- 84.61
Private land 195.22 -do- 195.22
Total land 320.73 -do- 320.73
Details of Land in Block-Wise (Acre):
Block District AC Villages Forest Land Govt. Land Private Total
Land
Gailo 18.12 74.39 339.29 431.80
Lathikata Sundargarh Rajgangpur Mushapalli 51.25 90.2 73.92 215.37
Bad-Dalki 31.69 44.48 69.19 145.36
Total 482.4 209.07 101.06 792.53
Or in ha 195.22 84.61 40.90 320.73
Submergence Details:
1. Fully submerged Village- 01 nos
2. Partly submerged village - 02 nos.
3. Displaced Family - 648 nos (Total population - 3038 nos.)-(2001 census)
4. Affected Family- nos ( Total population- nos.)
Head Works:
Length of Dam/Barrage (m) :1417
Type: Earth Dam with central spillway
FRL /MWL/Pond Level (m): 237.00
GSC:2029.10 ham DSC:2.476 ham
The proposed Chandrinalla Irrigation project is proposed near Gailo village in Lathikata Block of
Sundargarh District. It is a reservoir based project proposed in the Brahmani Basin across River
Chandrinalla, a right tributary of river Brahmani. The catchment area intercepted at the dam site is 121
Sqkm and the entire area lies within the territory in the state of Odisha.
Hydrology:
The G&D observation data at Chandrinalla Dam Site has been recorded from Aug 2006.Specific Yield of
observed runoff is 95 ham/sqkm at 75% yield, which is too high for consideration.
Although the monsoon flow is inconsistent and the avg. non-monsoon flow contribution goes well with
the characteristics of Brahmani Basin.
R-R equation established for existing Rukura Irrigation Project(CA:171 Sq.km) has been adopted for
the monsoon period. The average non monsoon distribution ratio from the observed data at Chandrinalla
GD site is used for non monsoon flow. The final established flow series data from 1985-2017 is used.
The yield series developed of the project from 1985-2017 & 75 % dependable yield comes to 4308 Ham
after deducting 20 % of flow for Upstream & downstream utilization, Sp Yield -35.60 Ham/Sqkm
Design Flood:
Method –SUH - CWC guidelines for Flood estimation report for Mahanadi subzone 3d,
Demand Table:
Drinking water provision made for 50000 population(2071 consensus) in command area